Title: Alan Little
1Case Study in Sustainable Construction
Alan Little Senior Quantity Surveyor
2Sustainable Construction and the Private House
Builder
- Reasons against / Reasons for
- Carvill Overview of Recent Schemes
- Carvill New Schemes
- Carvill Future Schemes
3Reasons against Sustainable construction
- Renewable Technologies / Sustainable methods
increase costs - Tradesmen and Site Staff are resistant change
- Currently Sellers market - demand for homes
outstrips supply - To date Sustainability is not a priority with
most purchasers - Government initiatives do not apply to private
developer - Lack of public awareness of sustainability
badges - Eco-Homes applications involve considerable time
and cost
4Reasons for Sustainable construction
- Rising fuel and energy prices
- Increasing public awareness of Global warming /
Green issues - Government forcing change through legislation /
tax system - Changing personal lifestyles and family units
- Moral duty toward sustainability for individuals
and businesses - Increasing demand for sustainable homes
- Better to decide to change before being forced to
5 Decision to change was made 5 years ago and is
being driven by Managing Director
6Recent Schemes
- 8 Residential developments have been constructed
to Eco Homes standards (950 units) - Eco Homes Logo on Sales Brochures
- Good and new Very Good ratings being obtained
7Picture missing
Parkmount 58 units
8Picture missing
Halcombe Square 60 units
9- Energy
- Transport
- Pollution
Picture missing
Chatsworth Square 133 units
10- Energy
- Transport
- Pollution
- Materials
Picture missing
Rosss Mill 165 units
11- Energy
- Transport
- Pollution
- Materials
- Water use
Picture missing
Loopland Mews 79 units
12- Energy
- Transport
- Pollution
- Materials
- Water use
- Land use and Ecology
Picture missing
Dunmore 136 units
13- Energy
- Transport
- Pollution
- Materials
- Water use
- Land use and Ecology
- Health and Well being
Picture missing
Old Bakers Court 240 units
14New Schemes
- WOODBROOK
- Phase 1
- 25 acres
- 360 units
- 4 year construction
- Phase 2 700 units?
Picture missing
15Woodbrook the next stage?
- Very Good Eco Home rating
- Urban design planned to encourage sense of
community and maintain site ecology - Large area of green space, cycle paths and river
walk - Roads modelled to reduce vehicle speed
- Incorporate renewable technologies
- Insulate to higher standard than Building
Regulations. - Provide One Year Translink Travel Pass free per
unit - Reduce carbon emissions
16Renewable Technologies
- Ground source heat pumps lack of plot space
- Wind power location / small scale / planning
permission / payback - Photovoltaic panels orientation / cost /
payback - Solar hot water heating orientation / redesign
of plumbing system - Wood pellet boilers storage of fuel / bagged
fuel cost - Incorporate as standard or as purchaser extra?
- No Grants available to private developers
17The Solution Biomass Fuelled District Heating
System
- One large boiler room more efficient than
individual boilers - All units benefit from the technology though
reduced energy costs - Good reduction in CO2 emissions
- Marketing potential largest housing scheme in
Britain - Technology can be re-created on apartment
schemes - Support local businesses with fuel supply
contracts
18The System
- Three 600 kW biomass boilers
- 1600 tonnes of wood chip per annum (160 hectares
willow) - 75 tonne fuel store on site - 300 m3 2 week
supply - 5200 m insulated steel / plastic distribution
pipe work under roads - each unit has plate heat exchanger, distribution
manifolds, heat meter and charge card reader - house owner pre-pays for energy onto electronic
card in local shop
19Low Carbon benefit
1400 ft2 three storey town house Highly insulated
with 90 efficient gas combination boiler TER
17.85 DER 17.47 CO2 Emissions 2.26 t/year Highly
insulated with Biomass district heating TER
17.85 DER 5.42 CO2 Emissions 0.67 t/year A 70
reduction in CO2 emissions
20Future Schemes
- SIROCCO
- 15 acres
- 2000 units
- 14 year construction
Picture missing
21Sirocco future living
- Build to Code for Sustainable Homes / Green
Guide - Aim for Zero Carbon Scheme
- Encourage city centre living
- Improve pedestrian access to city and entire
river walkway - Reduced carpark provision on site / incorporate
high quality Car Club - Consider Modern Methods of Construction
- Incorporate recycled building products and
technologies - Investigate rain water harvesting
22Picture missing
23Picture missing
Thank-you Alan Little