Title: Alan Little


1
Case Study in Sustainable Construction
Alan Little Senior Quantity Surveyor
2
Sustainable Construction and the Private House
Builder
  • Reasons against / Reasons for
  • Carvill Overview of Recent Schemes
  • Carvill New Schemes
  • Carvill Future Schemes

3
Reasons against Sustainable construction
  • Renewable Technologies / Sustainable methods
    increase costs
  • Tradesmen and Site Staff are resistant change
  • Currently Sellers market - demand for homes
    outstrips supply
  • To date Sustainability is not a priority with
    most purchasers
  • Government initiatives do not apply to private
    developer
  • Lack of public awareness of sustainability
    badges
  • Eco-Homes applications involve considerable time
    and cost

4
Reasons for Sustainable construction
  • Rising fuel and energy prices
  • Increasing public awareness of Global warming /
    Green issues
  • Government forcing change through legislation /
    tax system
  • Changing personal lifestyles and family units
  • Moral duty toward sustainability for individuals
    and businesses
  • Increasing demand for sustainable homes
  • Better to decide to change before being forced to

5

Decision to change was made 5 years ago and is
being driven by Managing Director
6
Recent Schemes
  • 8 Residential developments have been constructed

    to Eco Homes standards (950 units)
  • Eco Homes Logo on Sales Brochures
  • Good and new Very Good ratings being obtained

7
  • Energy

Picture missing
Parkmount 58 units
8
  • Energy
  • Transport

Picture missing
Halcombe Square 60 units
9
  • Energy
  • Transport
  • Pollution

Picture missing
Chatsworth Square 133 units
10
  • Energy
  • Transport
  • Pollution
  • Materials

Picture missing
Rosss Mill 165 units
11
  • Energy
  • Transport
  • Pollution
  • Materials
  • Water use

Picture missing
Loopland Mews 79 units
12
  • Energy
  • Transport
  • Pollution
  • Materials
  • Water use
  • Land use and Ecology

Picture missing
Dunmore 136 units
13
  • Energy
  • Transport
  • Pollution
  • Materials
  • Water use
  • Land use and Ecology
  • Health and Well being

Picture missing
Old Bakers Court 240 units
14
New Schemes
  • WOODBROOK
  • Phase 1
  • 25 acres
  • 360 units
  • 4 year construction
  • Phase 2 700 units?

Picture missing
15
Woodbrook the next stage?
  • Very Good Eco Home rating
  • Urban design planned to encourage sense of
    community and maintain site ecology
  • Large area of green space, cycle paths and river
    walk
  • Roads modelled to reduce vehicle speed
  • Incorporate renewable technologies
  • Insulate to higher standard than Building
    Regulations.
  • Provide One Year Translink Travel Pass free per
    unit
  • Reduce carbon emissions

16
Renewable Technologies
  • Ground source heat pumps lack of plot space
  • Wind power location / small scale / planning
    permission / payback
  • Photovoltaic panels orientation / cost /
    payback
  • Solar hot water heating orientation / redesign
    of plumbing system
  • Wood pellet boilers storage of fuel / bagged
    fuel cost
  • Incorporate as standard or as purchaser extra?
  • No Grants available to private developers

17
The Solution Biomass Fuelled District Heating
System
  • One large boiler room more efficient than
    individual boilers
  • All units benefit from the technology though
    reduced energy costs
  • Good reduction in CO2 emissions
  • Marketing potential largest housing scheme in
    Britain
  • Technology can be re-created on apartment
    schemes
  • Support local businesses with fuel supply
    contracts

18
The System
  • Three 600 kW biomass boilers
  • 1600 tonnes of wood chip per annum (160 hectares
    willow)
  • 75 tonne fuel store on site - 300 m3 2 week
    supply
  • 5200 m insulated steel / plastic distribution
    pipe work under roads
  • each unit has plate heat exchanger, distribution
    manifolds, heat meter and charge card reader
  • house owner pre-pays for energy onto electronic
    card in local shop

19
Low Carbon benefit
1400 ft2 three storey town house Highly insulated
with 90 efficient gas combination boiler TER
17.85 DER 17.47 CO2 Emissions 2.26 t/year Highly
insulated with Biomass district heating TER
17.85 DER 5.42 CO2 Emissions 0.67 t/year A 70
reduction in CO2 emissions
20
Future Schemes
  • SIROCCO
  • 15 acres
  • 2000 units
  • 14 year construction

Picture missing
21
Sirocco future living
  • Build to Code for Sustainable Homes / Green
    Guide
  • Aim for Zero Carbon Scheme
  • Encourage city centre living
  • Improve pedestrian access to city and entire
    river walkway
  • Reduced carpark provision on site / incorporate
    high quality Car Club
  • Consider Modern Methods of Construction
  • Incorporate recycled building products and
    technologies
  • Investigate rain water harvesting

22
Picture missing
23
Picture missing
Thank-you Alan Little