Title: Prsentation PowerPoint
1RENAISSANCE LYONWP Progress and PlansWP 2
Monitoring and Analysis
Christophe Ménézo Professor University of Savoy /
LOCIE Invited by INSA Lyon-CETHIL Christophe.mene
zo_at_univ-savoie.fr
2WP 2.1 Electrical Network
- Planned Activities
- - Platform of measurements of the impact of the
PV on the electrical distribution networks (at
INSA of Lyon) - - Measurements of the impact of PV systems
installed in Lyon-Confluence Area on the
distribution network
3WP 2.1 Electrical Network
- Measurement Platform at INSA
- Electricity quality evaluation produced by
standard EN 50-160 inverter - Site Electrical Engineering Dpt
- Definition of platform objectives and design
- Supplier (Tenesol)
Done
4WP 2.1 Electrical Network
- Measurement series led on Lyon-Confluence Network
- Project Submission to the National Research
Agency (ANR) - Agreement between EDF RD, INES RDI, Transénergie
and INPGrenoble - Contact with INSA School of Electrical
Engineering - Master student subject
Done
5WP 2.1 Electrical Network
- Measurement Platform at INSA
- Electricity quality evaluation produced by
standard EN 50-160 inverter - Definition of the measurements protocol
- Installation of the platform 2 kWc
- Installation of Practical Courses for Engineering
Students of INSA - j
Done
Planed For next 18 months
6WP 2.1 Electrical Network
- Measurement series led on Lyon-Confluence Network
- Constructive data-gathering of the distribution
network on the Lyon-Confluence area - Measurement Protocol definition with EDF RD and
INSA - Waiting for construction of the buildings and
PhotoVoltaic systems delay in the construction
schedule for blocks A, B, C gt to see other place
for measurements
Planed For next 18 months
7WP 2.2 Experience Feedback - Monitoring
- Planned Activities
- Multiscale Monitoring
- Global Monitoring
- Detailed Monitoring
- Localised Monitoring
ENERTECH
8WP 2.2 Experience Feedback - Monitoring
- Global Monitoring (promoters and dealers)
- - Counting and sub-counting heating room and
sub-station and Solar Domestic Hot Water - - Counting and under counting electricity in
building - Detailed Monitoring (Enertech)
- - By housing
- - Followed Consumption Cooking, lighting,
washing machine - - Followed thermal evolution
- Localised Monitoring (INSA-CETHIL)
- - Some residences which have been numerically
modeled
First contact with Inhabitants (Hespul,
Promoters INSA, Enertech)
9WP 2.2 Experience Feedback - Monitoring
Detailed Monitoring (Enertech) expected results
(such as in Restart Project) -
Thermal Confort
Human thermal gain
Apartment Electricity Use
Domestic Hot Water
Domestic Hot Water distribution
Common Electricity Use
Cooking
10WP 2.2 Experience Feedback - Monitoring
Tests of sensors accuracy (INSA-CETHIL)
Wireless sensors
- Identification of sensors (for Air temp. and
Humidity) - Use of Infrared camera (inside/outside?)
Large range of Temp. sampling time
autonomy
MINIBAT
11WP 2.2 Quality Control and Performance Analysis
- Analysis of progress
- Delays in construction gt delays for monitoring
- Submission of a new schedule to the EC (in
relation with WP 1.5) - Plans for the next 6 months
- Training session organized for sales agents
- Plans depend on the delays of construction
possibilities to extend the contract - First data aquisition in almost one year
(minima)
12WP 2.3 European Highlight
- Analysis of progress
- Strong points Zaragosa and Lyon not in phase
- Experiences of Zaragosa not highlighted enough
for Lyon - Networking opportunities should be much more
used - (webcam exchange for regular exchange
- for specific topics (focus), )
13WP 2.3 European Highlight
- Plans for the next 6 months (end of year 3)
- - Lyon strategy complete definition and planning
of phases - Comparison with Zaragossa
- - Common identification of what has to be
highlight ? - Identification of strong/weak points on each
side? - Definition of a monitoring strategy referential?