Title: Prsentation PowerPoint


1
RENAISSANCE LYONWP Progress and PlansWP 2
Monitoring and Analysis
Christophe Ménézo Professor University of Savoy /
LOCIE Invited by INSA Lyon-CETHIL Christophe.mene
zo_at_univ-savoie.fr
2
WP 2.1 Electrical Network
  • Planned Activities
  • - Platform of measurements of the impact of the
    PV on the electrical distribution networks (at
    INSA of Lyon)
  • - Measurements of the impact of PV systems
    installed in Lyon-Confluence Area on the
    distribution network

3
WP 2.1 Electrical Network
  • Measurement Platform at INSA
  • Electricity quality evaluation produced by
    standard EN 50-160 inverter
  • Site Electrical Engineering Dpt
  • Definition of platform objectives and design
  • Supplier (Tenesol)

Done
4
WP 2.1 Electrical Network
  • Measurement series led on Lyon-Confluence Network
  • Project Submission to the National Research
    Agency (ANR)
  • Agreement between EDF RD, INES RDI, Transénergie
    and INPGrenoble
  • Contact with INSA School of Electrical
    Engineering
  • Master student subject

Done
5
WP 2.1 Electrical Network
  • Measurement Platform at INSA
  • Electricity quality evaluation produced by
    standard EN 50-160 inverter
  • Definition of the measurements protocol
  • Installation of the platform 2 kWc
  • Installation of Practical Courses for Engineering
    Students of INSA
  • j

Done
Planed For next 18 months
6
WP 2.1 Electrical Network
  • Measurement series led on Lyon-Confluence Network
  • Constructive data-gathering of the distribution
    network on the Lyon-Confluence area
  • Measurement Protocol definition with EDF RD and
    INSA
  • Waiting for construction of the buildings and
    PhotoVoltaic systems delay in the construction
    schedule for blocks A, B, C gt to see other place
    for measurements

Planed For next 18 months
7
WP 2.2 Experience Feedback - Monitoring
  • Planned Activities
  • Multiscale Monitoring
  • Global Monitoring
  • Detailed Monitoring
  • Localised Monitoring

ENERTECH
8
WP 2.2 Experience Feedback - Monitoring
  • Global Monitoring (promoters and dealers)
  • - Counting and sub-counting heating room and
    sub-station and Solar Domestic Hot Water
  • - Counting and under counting electricity in
    building
  • Detailed Monitoring (Enertech)
  • - By housing
  • - Followed Consumption Cooking, lighting,
    washing machine
  • - Followed thermal evolution
  • Localised Monitoring (INSA-CETHIL)
  • - Some residences which have been numerically
    modeled

First contact with Inhabitants (Hespul,
Promoters INSA, Enertech)
9
WP 2.2 Experience Feedback - Monitoring
Detailed Monitoring (Enertech) expected results
(such as in Restart Project) -
Thermal Confort
Human thermal gain
Apartment Electricity Use
Domestic Hot Water
Domestic Hot Water distribution
Common Electricity Use
Cooking
10
WP 2.2 Experience Feedback - Monitoring
Tests of sensors accuracy (INSA-CETHIL)
Wireless sensors
  • Identification of sensors (for Air temp. and
    Humidity)
  • Use of Infrared camera (inside/outside?)

Large range of Temp. sampling time
autonomy
MINIBAT
11
WP 2.2 Quality Control and Performance Analysis
  • Analysis of progress
  • Delays in construction gt delays for monitoring
  • Submission of a new schedule to the EC (in
    relation with WP 1.5)
  • Plans for the next 6 months
  • Training session organized for sales agents
  • Plans depend on the delays of construction
    possibilities to extend the contract
  • First data aquisition in almost one year
    (minima)

12
WP 2.3 European Highlight
  • Analysis of progress
  • Strong points Zaragosa and Lyon not in phase
  • Experiences of Zaragosa not highlighted enough
    for Lyon
  • Networking opportunities should be much more
    used
  • (webcam exchange for regular exchange
  • for specific topics (focus), )

13
WP 2.3 European Highlight
  • Plans for the next 6 months (end of year 3)
  • - Lyon strategy complete definition and planning
    of phases
  • Comparison with Zaragossa
  • - Common identification of what has to be
    highlight ?
  • Identification of strong/weak points on each
    side?
  • Definition of a monitoring strategy referential?