Redefining Mold Maintenance - PowerPoint PPT Presentation

1 / 48
About This Presentation
Title:

Redefining Mold Maintenance

Description:

and maximize tooling life. Budget wisely and more effectively ... Download 15 day full working copy for free from www.MoldTrax.com or, set up a ... – PowerPoint PPT presentation

Number of Views:2041
Avg rating:3.0/5.0
Slides: 49
Provided by: sj55
Category:

less

Transcript and Presenter's Notes

Title: Redefining Mold Maintenance


1
Redefining Mold Maintenance
2
MaintenanceThe Final Frontier
  • Globalization now requires more than ever, your
    expensive fleet of molds to be production ready
    and process reliable.
  • Companies steeped in a reactive, firefighting
    culture are upgrading inefficient practices to
    meet the challenges of todays market.
  • The disorganized approach of hand writing notes
    in log books and random instructions in typical
    work order formats is disappearing.
  • The bar and the stakes have been raised, while
    resources, budgets and inventoryare continuously
    lowered.
  • The key to improving mold performance and
    maintenance efficiency lies in the ability to
    identify and understand the issues, standardize
    maintenance practices and to fully utilize the
    data that you spend time collecting.
  • MoldTrax 4.0 was born for this.

3
Typical Maintenance Culture
  • Firefighting the hot issuesover and over
  • Freelancing repairsno shop consistency or
    standardizationeveryone doing their own thing
  • Documentation practicesjournal type W/O
    records with no structure and of little value
  • Little communication with outside vendors
    concerning mold requirements or maintenance
    practices.

4
Types of Systems Currently Used
  • Manual Systems
  • Log Books
  • Manual worksheets, checklists and work orders
  • Electronic Systems
  • In-house generated electronic systems
  • Off-the-shelf CMMS packages (computerized
    maintenance management system)
  • ERPs (Enterprise Resource Planning) maintenance
    modules

5
Typical Log Book Entry
No structure
Incomplete/ambiguous entries
6
Excel Format
Mold layout requires manual trending
Inconsistent terminologymust read and decipher
all entries
7
Typical W/OFormat
Single text field means no detailed reports
concerning mold or part defects
Single text field means no electronic correlation
between defects above and corrective actions
documented here.
No connection to who repaired what defect
8
Why Dont Typical Work Order Systems Work ?
  • Illegible handwriting
  • Incomplete data entries
  • No structure to entriesscattered thought process
  • Inconsistent (non-standard) terminology
  • Manual searching for defects and corrective
    actions
  • No data relationship between what was needed and
    what was done
  • Toolmakers required to read and decipher entries
    to utilize
  • No visual impact

9
Why Dont Generic Asset Reliability Systems
Work ?
  • Generic terminology, structure and flow not
    intuitive to the run/repair cycle of a mold
  • Many screen changes, cumbersome to use
  • Critical information still buried in single text
    fields
  • No visual connection
  • Bottom Line
  • If toolmakers dont like itthey wont use it

10
If a Maintenance System
  • Requires toolmakers and repair technicians to
    type or write subjective entries using
    inconsistent terminology into a single text
    field, then they are being paid to collect
    datathat no one will use.

11
3 Basic Questions a MoldMaintenance System
Should Answer
  • What is your 1 unscheduled mold stop reason and
    associated corrective action costs?
  • What is your 1 mold issue or part defect?
  • What is your 1 mold with the highest maintenance
    costs (per hour of production)
  • All data related to these 3 questions needs to be
    easily sorted and viewed by
  • Mold number, product description, configuration,
    press, start and stop dates and times, associated
    personnel, tooling used and labor hours
    required.

12
What Are The Keys To A Successful Maintenance
Software System?
  • So then

13
A Successful System Must 1st Bring Value to the
Toolmaker or the Repair Technician by being
  • Easy to use
  • Minimal typing
  • Quick, on-the-fly data entry
  • Column headings to prompt correct entries
  • Drop-down lists of standard plant terminology in
    critical fields

14
A Successful System Must 1st Bring Value to the
Toolmaker or the Repair Technician by being
  • Easy to understand
  • Analyze past issues and repairs made quickly and
    accurately
  • Visual impact through digital images or drawings

15
A Successful System Must AlsoProvide a
Reporting Structure That Allows Supervisors,
Managers and Engineers To
  • Analyze the true costs of mold maintenance by
    mold, configuration, product line or vendors.
  • Monitor shop efficiency employee performance
  • Set defect targets and mold performance goals
  • Optimize mold down time hours
  • Reduce labor hrs. and maximize tooling life
  • Budget wisely and more effectively

16
And FinallyA Successful System Must
  • Allow for future data skills growth. It does not
    make economic sense to purchase a W/O system that
    barely meets your current requirements, then
    spend time populating that data base with many
    molds and tooling. You are now handcuffed to a
    system that in time, will leave you wantingand
    needing more.
  • MoldTrax 4.0 has many features that you may
    or may not initially use, and as shop data skills
    grow, these features will allow you to further
    standardize and track all aspects of your mold
    performance and maintenance efficiency.

17
So what kind of data needs to be collected and
utilized?
18
Typical Mold Information Collected
19
Fact
  • Most companies already collect 80 of the
    information required to make informed decisions
    leading to dramatic improvements in mold
    performance and maintenance efficiency
  • They just dont use it

20
  • But now you can
  • Introducing

21
MoldTrax 4.0
  • What does it do?
  • MoldTrax 4.0 tracks the performance and
    maintenance of a variety of molds and dies, and
    has the capability to track different tooling
    configurations run in a single mold base. It then
    presents this information in over 25 unique
    reports.
  • How Does it work?
  • Mold performance data is collected at the press
    and in the shop using specifically formatted work
    sheets, or entered directly into the software for
    a paperless system.

22
MoldTrax 4.0 Data Flow
23
So How is MoldTrax Different?
  • Other systems
  • All other CMMS (computerized maintenance
    management systems) both large and small, utilize
    only one or two text fields in which to track
    work that is required and performed on a mold.
  • MoldTrax 4.0
  • Provides maintenance designed formats that
    provide specific columns to enter data into which
    is quicker, more accurate and allows full
    utilization of the data.

24
The MoldTrax Method
  • MT4 was designed with input from many toolmakers
    who spent their entire careers in the mold
    repair/refurbish field. Its sole purpose is to
    track and report on the unique variables of mold
    performance and repair.
  • MT4 screens and data entry fields follow the
    logical progression of a typical run/repair
    cycle, so those not PC savvy can easily enter and
    utilize the data.
  • MT4 uses drop down lists to populate specific
    fields with your company specific terminology.
    This insures accurate and consistent data
    collection, and allows the data to be filtered
    and sorted for troubleshooting and reporting.

25
MoldTrax 4.0 Features
Easily accessible, comprehensive User Guide with
many examples and images. Simply click on any
section in the table of contents and it takes you
there automatically!
26
Detail Mold Information Screen
Live mold listsimply click on any mold and the
data on the right side changes automatically in
any of the 8 tab fields for instant comparison
from mold to mold
27
Tooling Data Tab
Describe required tooling alterations, formulate
change-over or repair kits, note drawer locations
and other important tooling issuesdouble click
any field to zoom!
Categorize tooling for refined reporting
28
Troubleshooting Guide
Describe defect and list probable causes,
corrective and preventative actions
Standardize defect terminology for consistent
reporting
Paste digital images and drawings of mold or part
defectsdouble click to zoom image!
29
Tech Tips Screen
Document critical or required steps/sequences
used in disassembly, cleaning, assembly, final
check and polishing procedures to standardize
maintenance practices
Paste images or drawings of part and mold
30
Maintenance Tracking Screen
Track different tooling configurations run by a
single mold base.
When you toggle through the mold run dates, all
information on bottom half of screen changes
accordingly for quick and accurate troubleshooting
Track repair hours by job or specific corrective
action
Include a drawing or digital image of the
defects noted during the production rundouble
click to zoom image!
Add W/O number created in your ERP for document
connectivity
31
Maintenance Tracking Screen
Tooling listed for this mold appears in the
Corrective Action drop-down list for fast,
consistent data entry and minimizes typing and
random terminology.
32
Maintenance Tracking Screen
Create a list of your Corrective Actions and
track to see how shop hours are spent cleaning,
replacement, adjusting, polishing etc
33
Maintenance Tracking Screen
Toolmakers and repair techs can quickly toggle
back through repairs to see what tooling or
corrective action was used to repair specific
defects, and when.
34
Maintenance Tracking Screen
Use this tab to schedule future maintenance
activities by cycles or dates and track major
mold events separate from normal PMs
Track current mold status and servicing
frequencies
35
MoldTrax 4.0 Data Utilization
36
Specific Text Fields Mean Comprehensive Reporting
37
Single Mold Canned Reports(Statistical and
Reference)
Simply pick a mold from the drop down list
Choose a Statistical or Reference report for any
mold
Choose from the list of production run dates
(Begin and End) for this mold
38
New FastTrax Reports
Simply type in any date range you want
Then choose from over 20 unique reports presented
in a spreadsheet format that allows you to
compare many fields for complete data utilization
39
Target Unscheduled Downtime
40
Defect Type Analysis Report Shows Where to
Focus Attention
41
Instantly Recognize Molds or ProductsWith High
Defect Counts
Defects by Mold Block and Quality
42
Track Maintenance Costs per Run Time Hour
43
Instantly See Tooling Costs by Mold,Description,
Type, Quantity Used or Date Installed
44
Set Goals and Measure Results
45
Remember
  • Your molds are the most critical and expensive
    link to the health and prosperity of your
    company.
  • They deserve the complete and undivided attention
    that only a systemized approach can offer.
  • MoldTrax 4.0
  • Track the past. Secure the future

46
MoldTrax 4.0Setting A New Standard in Maintenance
47
About the developer
  • Steve Johnson works as the Maintenance Systems
    Manager for Progressive Components. Previous
    experience includes 7 years as Senior Maintenance
    Tooling Engineer for Abbott Laboratories/Hospira,
    a leading medical device manufacturer. His
    experience also includes twenty five years as a
    toolmaker at Calmar, Inc., redesigning and
    rebuilding high cavitation close tolerance
    multicavity molds. Prior to this, he served four
    years in the U.S. Navy as a jet mechanic training
    reservists on maintaining the A4L Skyhawk.
  • Steve conducts nationwide seminars for
    ToolingDocs, on developing a systematic approach
    to mold maintenance. He also conducts
    maintenance capability assessments and hands-on
    training for plastics companies helping them to
    improve mold performance and shop maintenance
    efficiency.
  • This experience has enabled Steve to design and
    develop MoldTrax 4.0, a unique comprehensive
    documentation system for tracking mold
    performance and maintenance from a real world
    perspective.
  • Steve has authored many articles for various
    plastics industry magazines including his columns
    Across The Bench found in Moldmaking Technology
    and Mold Shop for Plastics Technology..

48
MoldTrax 4.0 2,500.00 for net workable
version--- plus 5 additional seats in the same
facility at no chargeNo annual fees. No
annual maintenance costs.MoldTrax 3.0 users
upgrade to 4.0...free of chargeDownload 15 day
full working copy for free from www.MoldTrax.com
or, set up a personalized walk through of the
system at your PC via a Webex connection or an
in-house demo at your facility (1-2 hrs).
ContactSteve Johnson419-289-0281
orProgressive Components800-269-6653Visit us
on the web at www.MoldTrax.com
  • The minimum system requirements to operate
    MoldTrax 4.0 are a Pentium IIIĀ  1.2 GHz with 512
    Meg of RAM and at least 100 meg of disk space
    free. Supported operating systems are Windows
    2000, and XP Professional. Windows 95, 98, Me are
    not supported.
Write a Comment
User Comments (0)
About PowerShow.com