Title: Clinical Supplies Solutions
1Clinical Supplies Solutions
2Clinical Supplies Solutions
Our Goal Optimize Your Clinical Trial
Supplies
3Clinical Supplies Solutions
- Objectives
- Processes Tools
- Constraints
- Modeling
- Simulation
- Optimization
4Clinical Supplies Solutions
- Products CT-FAST Modules
- Average Demand Over Time
- Demand and Supply Simulation
- Actual IVRS Data
- High Performance Computing
- Cost Optimization
- Etc.
Clinical Trial Forecasting And Simulation Tool
5Clinical Supplies Solutions
- Services
- Standard/Customized Product Installation
Training - Specific Modeling/Development Based on Needs
- Trial Consulting
- General Clinical Supplies Management Consulting
- Clinical Supplies Optimization Strategy
- Organizational Structure, Processes and Tools
- Performance Definition and Measures
- Training Workshops
- Trial Classification Cost/Risk-Based Decision
Criteria - Impact of Randomization Scheme, Titration, etc.
- IVRS Automated Inventory Management
- Variability Analysis in Relation to Supplies
Management
6 Leading-edge technology
Business user focus!
7- CT-FAST Benefits
- Enabled accelerated trial execution
- Minimized risk of out-of-stock and over-supply
- Increased control over clinical supplies
- Better allocation of resources
- Standardized processes
8- CT-FAST, The only tool that allows clinical
supply coordinators to - Test an unlimited number of scenarios in a short
amount of time - Perform sensitivity analyses to minimize risk
and costs - Identify the risk associated with any supply
strategy - Obtain, as outputs, optimized production plan
IVRS inventory - management parameters
- Obtain re-evaluated production plan IVRS
inventory management parameters for ongoing trials
9The CT Supply Managers Challenge
10The CT Supply Managers Challenge
What if parameters change?
When and how much to produce?
How much safety stock to keep at sites?
What packaging design?
When and how much to ship to Sites?
11How to address this challenge?
- Highly Time Consuming
- Non-Adding Value Tasks
- Limited Outcome
12CT-FAST Enables High-Value Added
Input
Decisions
Automated Calculation
High Value-Added Work
13CT-FAST Enables High-Value Added
Time and Resource Saving
Facilitated Internal Communication
Standardized Methodology
The Right Focus Core RRs
Facilitated Customer Interaction
Decreased Rush Orders
Increased Agility Responsiveness
Decreased Out-of-drugs
Decreased Manufacturing/ Distribution Costs
14What is CT-FAST?
- Automated/Standard Calculation
- Consider All Trial Parameters
- gt Average Demand Over Time
CT-FAST - Start Simple Rapid Results
- Consider Input Variability Risk
- Consider Supply Strategy
- gt Prod Plan IVRS Parameters
CT-FAST - Simulation Precise Comprehensive
Results
- Reduce Uncertainty Over Time
- Re-evaluate Input and Output
- gt Updated Supply Strategy
CT-FAST - Refine Leverage IVRS Actual Data
15CT-FAST - Start Simple Rapid Results
16CT-FAST Start
- Fast Automated Calculation with All Trial
Parameters - Standard Method Documentation
- What-If Scenarios
Overview of Trial Demand Over Time
17CT-FAST - Simulation Precise Comprehensive
Results
18CT-FAST Scope
When and how much to produce?
When and how much to ship?
How much to keep at sites?
19CT-FAST Methodology
Trial Demand
Production Plan IVRS Parameters
20CT-FAST Methodology
Trial Demand
Production Plan IVRS Parameters
21CT-FAST Methodology
Production Plan IVRS Parameters
- Scenario 1 Overage 1
- Stock-outs, out-of-drugs
- Shipment frequency volume
- Detailed Report
- Production Schedule
- Qty Produced Used per Package Type
- IVRS parameters
- Out-of-drug Distribution
Select Optimal Scenario
- Scenario 2 Overage 2
- Stock-outs, out-of-drugs
- Shipment frequency volume
- Scenario 3 Overage 3
- Stock-outs, out-of-drugs
- Shipment frequency volume
22CT-FAST Output - Examples
Demand Over Time With Variability
Pack Type A
Pack Type B
23CT-FAST Output - Examples
Out-of-Drug Occurrences In Function of Overage
Out-of-Drugs
24CT-FAST Output - Examples
Trial Production Schedule
Quantity
Batch 1 Coverage
Batch 2 Coverage
25CT-FAST Output - Examples
IVRS Inventory Management Parameters Over Time
Min Stock Level
Max Stock Level
26CT-FAST - Refine Adjust Strategy using IVRS data
27Updated Supply Strategy
Patient Status/TG/Dose Levels Inventory at all
locations
Patient Visits Shipment Receipt
IVRS Data
Automated
28CT-FAST Refine
- Allocate a certain
- WEIGHT to
- Data
- Assumptions
- Based on
- Quantity of Data
- Assumptions Confidence Level
Re-evaluate all parameters
?
Data
Data
?
Data
?
TIME
Less Less Assumptions
More More Data
Enrollment, visit schedule, titration, drop out,
etc.
29CT-FAST Refine
30CT-FAST Refine
- Input Re-Evaluation - Examples
Planned
Enrollment Rate
Re-evaluated
Actual
Drop Out Rate
31CT-FAST Refine
Re-evaluation Time
Demand Over Time
Updated Production Plan IVRS Parameters
32CT-FAST Interface Intuitive Flexible Data
Entry
33Intuitive Flexible Data Entry
34Interface Examples
On-line Graphical Representations
Distribution Network
Data Entry Facilitation
Copy/Paste Buttons
35Data Entry Facilitation
Intuitive Interface
Flexible Level of Detail
Various Study Designs
Re-evaluation of Assumptions
Tool Developed by Clinical Supply Managers
Production Plan as Output
IVRS parameters as Output
36- Â Made by clinical supply managers, for clinical
supply managers.
37N-SIDE Belgium 6 Chemin du Cyclotron 1348
Louvain-La-Neuve
N-SIDE US Science Center 3701 Market
Street Philadelphia PA 19104
Chedia Abdelkafi, Director, Clinical Supplies
Solutions Email chedia.abdelkafi_at_n-side.com Cell
1 717 715 7232
www.N-SIDE.com
www.CT-FAST.com