Title: Tom Shea
1Introduction
DAC Review
- Tom Shea
- Diagnostics Group Leader
March 26, 2003
2Installation an Integration Overview
Operational
RING 44 Position 2 Ionization Profile 87 Loss
1 Current 5 Electron Det. 2 Wire
1 Beam in Gap 2 Video 1 Tune
Next 6 Months
IDump 1 Position 1 Wire 1 Current
FY2004
FY2005
EDump 1 Current 2 Loss 1 Wire
CCL 10 Position 9 Wire 8 Neutron 48 Loss 3
Bunch 1 Faraday Cup 1 Current
MEBT 6 Position 2 Current 5 Wires 1 Emittance
RTBT 17 Position 43 Loss 4 Current 5 Wire 1 Harp
DTL 10 Position 5 Wire 5 Loss 5 Faraday
Cup 6 Current
SCL 32 Position 58 Loss 8 Laser Wire
HEBT 29 Position 11 Wire 49 Loss 4 Current
CCL/SCL Transition 2 Position 1 Wire 1 Loss 1
Current
LDump 6 Loss 6 Position 1 Wire
D-Plate 3 Position 1 Loss 1 Current 2
Wire 2 Faraday Cup 1 Bunch 1 Video 1
Halo 3 Neutron 1 Beam Stop Faraday Cup 1
Emittance (Slit and Collector)
3Phased Deployment and Commissioning
- Phased deployment of each system
- Beamline devices
- Electronics
- Software
- Phased commissioning continues to provide lessons
learned - MEBT at LBNL
- MEBT, DTL at ORNL
- RHIC at BNL
- We present a snapshot taken during this
progression
Increasing flexibility
4Charge to the Committee
- Review the designs
- Consider key observations from audience
participants - Categorize findings for each system
- Action Items (potential show stoppers that must
be closed out before design of beamline device is
considered final) - Observations/ recommendations (to help the team
refine the cost/performance of the overall
system) - Give us an outbrief
- Written report
- Thank you!