Water Supply Planning A Legal Overview - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Water Supply Planning A Legal Overview

Description:

Groundwater Overdraft. Multiple Issues Need To Be Analyzed. CEQA Cases Pre 610/221 ... Basin Near Overdraft. EIR Upheld Based on City's Water Supply Plan ... – PowerPoint PPT presentation

Number of Views:81
Avg rating:3.0/5.0
Slides: 21
Provided by: ghar7
Category:

less

Transcript and Presenter's Notes

Title: Water Supply Planning A Legal Overview


1
Water Supply PlanningA Legal Overview
  • Edward J. Casey
  • Weston Benshoof Rochefort Rubalcava MacCuish
  • 333 South Hope Street, 16th Floor
  • Los Angeles, California 90071
  • (213) 576-1005, ecasey_at_wbcounsel.com
  • May 18, 2004

2
Overview of Presentation
  • Review of Case Law Leading Up To SB 610/221
  • Review SB 610/221 (Enacted in 2002)
  • Review Legal Requirements for UWMPs
  • Identify Open Questions

3
CEQA Cases Pre 610/221
  • Not Many CEQA Cases Concerning Water Supply Pre -
    1990s
  • Stanislaus (1995)
  • One of First CEQA Cases Dealing with Water Supply
  • 25-Year, Phased Project
  • Firm Water Supply Only Identified For First Phase
    (5 years)
  • EIR Invalidated Because No Analysis of Long-Term
    Water Supplies

4
CEQA Cases Pre 610/221
  • County of Amador (1999)
  • CEQA Challenge To Water Agencys Adoption of
    Long-Term Water Supply Program
  • Program Planned For Additional Water Supplies To
    Meet Anticipated Growth In Draft General Plan
  • EIR Invalidated For Lack of Analysis of Growth
    Impacts From Additional Water Supplies

5
CEQA Cases Pre 610/221
  • Newhall Ranch Trial Court Decision (2000)
  • Three Sources of Waters Reclaimed, Flood Flows,
    SWP
  • SWP
  • Cannot Assume Full Contractual Entitlements
  • Only Evidence Before Court Was Historical
    Deliveries
  • Flood Flows
  • Inadequate Evidence Re Ability of Aquifer To
    Store Water
  • Death Knell of Will Serve Letter

6
CEQA Cases Pre 610/221
  • Newhall II (2003)
  • Pre 610/221 EIR
  • Water Supply Analysis Assumes 100 SWP
    Entitlements During Wet Years, 50 During Dry
    Years
  • EIR Struck Down
  • Insufficient Evidence Supporting Assumptions
  • Key Factor ? SWP System Not Fully Built Out

7
CEQA Cases Pre 610/221
  • PCL/Monterey Amendments
  • Paper Water
  • Full SWP Entitlement Is A Hope,
  • Actual, Reliable Water Supply Less Than
    Entitlement
  • Connection Between Land Use Planning and Water
    Supply
  • Condemns Land Use Planning Based On Paper Water
  • Worst Case Scenario
  • Need To Analyze Long-Term Shortage Scenario

8
CEQA Cases Pre 610/221
  • Save Our Peninsula (Monterey County ) (2001)
  • Groundwater Overdraft
  • Multiple Issues Need To Be Analyzed

9
CEQA Cases Pre 610/221
  • Napa Citizens (2001)
  • Airport Development Project
  • Source of Water Identified
  • EIR Still Struck Down
  • Water Source Still Not Firm Agreements Still
    Needed
  • Not Need Guaranteed Source, But Need To Analyze
    Back-up Source (Worst Case Scenario)

10
CEQA Cases Pre 610/221
  • Friends of Eel River (2003)
  • Sonoma County Water Agency
  • Proposed Project to Increase Water Diversion from
    Russian River
  • EIR Struck Down Because No Analysis of PGE
    Projects That Would Decrease Amount of Water
    Discharged into Russian River

11
CEQA Cases Pre 610/221
  • San Joaquin Raptor (2003)
  • New UC Campus at Merced
  • Proposed Source of Water Was Groundwater
  • Basin Near Overdraft
  • EIR Upheld Based on Citys Water Supply Plan
  • Citys Proposed Supply Projects Provide
    Sufficient Basis to Conclude No Significant Water
    Impacts

12
Lessons Learned
  • Build It, and Water Will Follow
  • Days Are Over
  • Demonstrate Long-Term Supplies Based on Evidence
  • Need To Address Worst Case Scenarios
  • Drought/Loss of Supplies/Third Party Actions
  • Groundwater Carries Special Problems
  • Connection Between Water Supply Planning and Land
    Use Planning
  • Not Need Guaranteed Water Supply
  • Reasonable Probability/Certainty

13
SB 610/221
  • Essential Elements
  • Demonstrate Sufficient Water Supply to Meet
    Project and Cumulative Demand in Normal, Single
    and Multi-Dry Years Over 20 Year Horizon
  • List of Qualifying Projects
  • 500 residential units or equivalent water demand
  • Substantial Evidence Test Applies
  • Projections Not Guarantee
  • Can Rely on Future Water Supplies Depending on
  • Contracts, Capital Budget, Permits, Water Rights
  • Special Rules For Groundwater

14
Guideline Documents
  • DWRs Guidelines for SB 610/221
  • DWRs Guidelines for Assessing State Project
    Water
  • MWDs Reliability Report of 2003

15
UWMPs
  • Urban Water Management Plans
  • 610/221 Both Provide That Information and
    Projections in UWMP May Be Used in 610/221
    Reports
  • UWMPs Prepared Every Five Years
  • New Requirements Re Groundwater
  • CLWAs UWMP Challenged in Court
  • Challenge Rejected by Trial Court
  • Heavy Reliance on Substantial Evidence Test and
    Expert Opinion

16
Open Legal Questions
  • Attack on Plan Documents
  • UWMPs, MWDs Reliability Report, Etc.
  • When Can Rely, Or Not Rely, On Plan Documents?

17
Open Legal Questions
  • Groundwater As Source
  • Issue Is Legal Entitlement to Produce Groundwater
    and Third Party Impacts
  • Types of Basins
  • Adjudicated
  • Managed But Not Adjudicated
  • Neither Adjudicated Nor Managed
  • Red Flag

18
Open Legal Questions
  • Proving Likelihood of Additional Water Supply in
    Future
  • Required to Show Permits, Plans, Contracts,
    Capital Budgets
  • When Are Proposed Plans Sufficiently Ripe?

19
Open Legal Questions
  • Worst Case Planning How Much Needed?
  • Existing Supplies
  • Back-up Plans

20
Open Legal Questions
  • Connection Between Land Use Planning and Water
    Supply Planning
  • Who Does What and When?