NMWG GGF13 Seoul March 2005 - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

NMWG GGF13 Seoul March 2005

Description:

Draft base schema stable (ish) Some pilot sub-schema exist for some characteristics / tools ... Oct 2002 Near-final draft of characteristics hierarchy document to GFSG ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 9
Provided by: rhu99
Category:
Tags: nmwg | ggf13 | march | nearish | seoul

less

Transcript and Presenter's Notes

Title: NMWG GGF13 Seoul March 2005


1
Network Measurements Working Group
  • DiscussionCurrent Work Milestones
  • Richard Hughes-Jones
  • NM-WG GGF13 Seoul

2
For Discussion Work in Progress
  • Schemata Version 1
  • Specification (s) almost stable !
  • Implementations in progress
  • Dante, Internet2, EGEE, UK e-Science grids
  • GGF document to record details, we have
  • XML Request Response Schemata, Request Schema
    Requirements Document, Response Schema
    Requirements Document,
  • Business Logic notes
  • Discussion with Area Dir. encourage V1 Schema
    as Experimental Doc
  • Schemata Version 2
  • Draft base schema stable (ish)
  • Some pilot sub-schema exist for some
    characteristics / tools
  • Working on the developer's guide
  • Draft How-to write your own schema
  • Implementations will be needed for Proof of
    Concept
  • Web service aspects need to be studied
  • Links to other Groups OASIS DCML Network TC
    ,DMTF/CIM,

3
NM-WG Milestones GGF11
  • Oct 2003 Draft XML
  • Oct 2003 f2f discussion on XML and Schema
  • Oct 2003 GGF 9 Chicago
  • Dec 3003 Agreed version of Schema document (data
    model)
  • Jan 2003 Create XML Schema Request
    Report/Response
  • Apr 2003 Submit hierarchy document to GFSG (done
    Jul 03 )
  • Nov 2003 Draft of Schema document
  • Jan 2004 Initial implementations and Proof of
    Concept Demos
  • Mar 2004 GGF 10 Berlin
  • Apr 2004 Finish v2 of XML Schema request
    response
  • Xxx 2004 Match with Requirements doc.
  • Apr 2004 Draft request and response of Metadata
    (in progress)
  • Xxx 2004 Implement XML-RPC and Document/Literal
    PoC (in progress)
  • Xxx 2004 Test implementations and Proof of
    Concept Demos (in progress)
  • Jun 2004 GGF 11 Hawaii
  • Jun 2004 NM_RG BoF
  • Jun 2004 Submit schema document to GFSG (take
    note of implementations)
  • Sep 2004 GGF 12 Brussels
  • Xxx 2004 Submit request response requirement
    documents to GFSG

4
For Discussion NM-WG External Milestones GGF13
  • External Milestones GGF Milestones given to
    Area Directors
  • Currently on our Web site we have
  • July 2002 Begin work on tools classification
  • Oct 2002 Near-final draft of characteristics
    hierarchy document to GFSG
  • Mar 2003 Finish work on tools classification web
    page (Done.)
  • Mar 2003 Begin work on schema document
  • Apr 2003 Submit hierarchy document to GFSG (done
    Jul 03 )
  • Nov 2003 First Draft of Schema document
  • Jun 2004 Submit schema document to GFSG (take
    note of implementations)
  • Suggest we add BUT discuss the dates
  • Oct 2004 Version 1 Schema in Draft
  • June 2005 Document for Version 1 Schema ready
    for discussion / GFSG
  • June 2005 Pilot Demonstrations of Version 1
    Schema
  • Oct 2005 Initial Draft of Version 2 Schema ready
    for discussion at GGF15 (maybe this is too
    detailed and should be in the internal
    milestones)
  • early 2006 Version2 Schema ready for GFSG

5
For Discussion NM-WG Milestones GGF13
  • Mar 2004 GGF 10 Berlin
  • Apr 2004 Finish v2 of XML Schema request
    response
  • Xxx 2004 Match with Requirements doc.
  • Apr 2004 Draft request and response of Metadata
    (in progress)
  • Xxx 2004 Implement XML-RPC and Document/Literal
    PoC (in progress)
  • Xxx 2004 Test implementations and Proof of
    Concept Demos (in progress)
  • Jun 2004 GGF 11 Hawaii
  • Jun 2004 Submit schema document to GFSG (take
    note of implementations)
  • Sep 2004 GGF 12 Brussels
  • Nov 2004 Pilot implementations of version 1
    Schema started?
  • Dec 2004 Work started on Verstion2 Schema
  • Mar 2005 First Demonstrations of Version 1
    Schema Operational? In Dante Internet2 and
    EGEE
  • Mar 2005 GGF 13 Seoul
  • Jun 2005 Document for Version 1 Schema ready for
    discussion
  • Jun 2005 Pilot Demonstrations of Version 1
    Schema ie basically up and running
  • Jun 2005 Notes / documents of Version 2 Schemata
    ready for discussion
  • Jun 2005 GGF 14 Chicago
  • Oct 2005 Version 2 Base Schema Stable with
    sub-schema for a few Characteristics ?
  • Oct 2005 GGF 15 Boston

6
Getting Involved in NM-WG
  • Network Measurements Working Group (NM-WG) is
    part of the Performance and Information Systems
    area.
  • Mailing list is nm-wg_at_gridforum.org
  • Send an email to majordomo_at_gridforum.orgwith the
    body "subscribe nm-wg"
  • Web-pageshttp//www-didc.lbl.gov/NMWGhttp//for
    ge.gridforum.org/projects/nm-wg/
  • New Web site being constructed
    nowhttp//nmwg.internet2.edu/
  • Next Phone Meeting - Please Join in
  • 11 a.m. EST 24 March 2005 1600 GMT 0100 25
    March Korea

7
(No Transcript)
8
Intellectual Property Policy
  • I acknowledge that participation in GGF11 is
    subject to the GGF Intellectual Property Policy.
  • Intellectual Property Notices Note Well All
    statements related to the activities of the GGF
    and addressed to the GGF are subject to all
    provisions of Section 17 of GFD-C.1 (.pdf), which
    grants to the GGF and its participants certain
    licenses and rights in such statements. Such
    statements include verbal statements in GGF
    meetings, as well as written and electronic
    communications made at any time or place, which
    are addressed to the GGF plenary session,
  • any GGF working group or portion thereof,
  • the GFSG, or any member thereof on behalf of the
    GFSG,
  • the GFAC, or any member thereof on behalf of the
    GFAC,
  • any GGF mailing list, including any working group
    or research group list, or any other list
    functioning under GGF auspices,
  • the GFD Editor or the GWD process
  • Statements made outside of a GGF meeting, mailing
    list or other function, that are clearly not
    intended to be input to an GGF activity, group or
    function, are not subject to these provisions.
  • Excerpt from Section 17 of GFD-C.1 Where the GFSG
    knows of rights, or claimed rights, the GGF
    secretariat shall attempt to obtain from the
    claimant of such rights, a written assurance that
    upon approval by the GFSG of the relevant GGF
    document(s), any party will be able to obtain the
    right to implement, use and distribute the
    technology or works when implementing, using or
    distributing technology based upon the specific
    specification(s) under openly specified,
    reasonable, non-discriminatory terms. The working
    group or research group proposing the use of the
    technology with respect to which the proprietary
    rights are claimed may assist the GGF secretariat
    in this effort. The results of this procedure
    shall not affect advancement of document, except
    that the GFSG may defer approval where a delay
    may facilitate the obtaining of such assurances.
    The results will, however, be recorded by the GGF
    Secretariat, and made available. The GFSG may
    also direct that a summary of the results be
    included in any GFD published containing the
    specification. GGF Intellectual Property
    Policies are adapted from the IETF Intellectual
    Property Policies that support the Internet
    Standards Process.
Write a Comment
User Comments (0)
About PowerShow.com