06 November 2002 - PowerPoint PPT Presentation

About This Presentation
Title:

06 November 2002

Description:

Detector development labs, Linux computer cluster, laser machining, ... Both MS (physics) and PhD (engineering) students available to work the project ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 5
Provided by: alan311
Learn more at: http://scipp.ucsc.edu
Category:
Tags: mslinux | november

less

Transcript and Presenter's Notes

Title: 06 November 2002


1
Forward Tracking RD at Louisiana Tech University
  • Lee Sawyer

2
Proposed Work at Louisiana Tech
  • Joint Proposal Evaluation of a GEM-Based
    Forward Tracker for the NLC (39k in Y1)
  • Hardware Build a prototype GEM chamber suitable
    for (far) forward tracking
  • Software Study design parameters for a tracker
    in the far-forward region.
  • Since the proposal
  • Additional funds requested from LA Board of
    Regents (3 proposals) for cathode manufacture,
    multiplexing circuitry, faculty student support
    ( 200k).
  • Foils, test chamber ordered from Sauli at CERN
  • Investigating alternate sources for foils (w/
    UTA, et al.)
  • First meeting with OK on simulation studies
  • Standalone GEM simulation software installed -gt
    simulate detector configurations

3
The Louisiana Tech NLC Group
  • Sawyer, Parashar, Greenwood
  • DoE-supported group working on D0
  • Forest
  • Medium-energy group (JLAB) developing GEM
    detectors for QWEAK experiment
  • Facilities available include
  • Detector development labs, Linux computer
    cluster, laser machining, micromanufacturing
    capabilities, clean rooms
  • Both MS (physics) and PhD (engineering) students
    available to work the project
  • Division of Labor
  • Forest, Sawyer Hardware RD
  • Parashar, Greenwood Monte Carlo studies

4
Plans for the Upcoming Year
  • Hardware
  • Setup GEM lab over the next 2 months (gas,
    electronics,..)
  • Take delivery of test chamber from CERN in spring
  • Build prototype readout board by summer
  • First CR tests of 3-foil chamber this summer
  • Software
  • Plan simulation studies in concert with OK
  • First results of standalone simulations by summer
  • These items do not depend on the DoE supplement
  • First foils chamber to be purchased with
    existing local funds
  • Laser-cut prototypes of cathode plane begun
  • More detailed studies, development of a prototype
    specific for NLC will depend on additional
    funding
Write a Comment
User Comments (0)
About PowerShow.com