Title: Waterville Waterfront Redevelopment
1Waterville Waterfront Redevelopment
2411 Consultants
3Proposal
- Amphitheater
- Front Street Revitalization
- Road and Parking Throughout Site
- Environmental Concerns
- Permitting
- Playground Options
4Playground Location
5Play Mart Leathers and
Associates Cedar Works 100
recycled plastic Unique designs Local
company Easy installation Community
oriented Inexpensive Inexpensive Great customer
service Easy installation
6Stage Design
- General Footprint
- 30 ft x 15 ft
- 2 Main Support Beams
- Cantilevered for Appearance
- Two Design Options
- Wood
- Steel/Concrete
7Benefits of Each Design
- WOOD
- Less Expensive
- Easier to Build/ Contract Out
- Traditional Appearance
- STEEL/CONCRETE
- Modern Appearance
- Generally More Weather resistant
- Longer Life Span
8Wood Stage
- Teak Decking
- 2 x 14 Braced Joists
- 5 x 15 Glulam Beams
9Steel/Concrete Stage
- W10 x 19 Gr. 50 Steel Beams
- Concrete Decking
- Verco Manufacturing
10Additional Considerations
- Enlarged Concrete Footing
- Convenient for Audio Equipment
- Fasteners/ Tie-downs
- Secure Lighting, Tarps, Props, etc.
- Permanent Lighting
11Stage Options
Towers for the lights and speakers with stand
alone acoustic walls
Frame with hanging lights and hanging acoustic
walls
12Amphitheater
13Proposed Amphitheater Grades
14Amphitheater Access Road
15Access Road Profile
16Front Street (South of Temple Street)
17Front Street Cross Sections
18Front Street (North of Temple)
19Front Street
20Example Pictures
21Two Lanes vs. One Lane
- Current Two Lane Road
- High accident rate
- High speeding
- Unsafe to pedestrians crossing
- Unsaturated flow at all hours
- Proposed One Lane Road
- Lower Accident Rate
- Low speeding incidence
- Safer for increased pedestrian activity
- More congestion at peak hours
22Current vs. Future Flows
- CURRENT
- 2-Lane 1-Way Road
- Average Flow
- 845 vehicles
- Saturation Flow
- 2353 vehicles
- PROPOSED
- 1-Lane 1-Way Road
- Average Flow
- 1993 vehicles
- Saturation Flow
- 991 vehicles
23New Road Centerline Elevations Proposed and
Current
24Retaining Wall
25New Parking Lots
26Parking Lot 1
Grading Cross Section
27Parking Lot 2
Grading Cross Section
28Grading Profile
1
1
29Retaining Wall Profile
30Retaining Wall Options
Cantilever Wall
Mechanically Stabilized Earth Wall
Gravity Wall
31Required Parking
A
C
D
B
32Required Parking
Parking Spaces Proposed 570
33ADA Compliance
Parking Spaces Proposed 570
2 of 570 12 Proposed Spaces 19
34Traffic Controlling
35Traffic Controlling
36Entrance
37Minor Exit
38Major Exit
39Railroad Considerations
40Environmental Concerns
- Site Assessment
- Based on SW Coles Phase I Brownfield Assessment
41Environmental Concerns
- Potential Sources and Contaminants
- Petroleum Products
- Metals
- PAH
42Environmental Concerns
- Results
- Detectable amounts of VOCs, SVOCs, fuels and
some metals throughout site - Mostly below acceptable limits
- PAH levels exceed EPA guidelines at former
Lockwood location - Groundwater tested within EPA MCLs
43Environmental Concerns
- Solutions
- Further testing
- Baseline-2 remediation
- Soil capping
- Off-site disposal
44Permitting
- Requirements
- Site Location of Development (Site Law)
- Natural Resources Protection Act (NRPA)
45Permitting
- Building
- Small buildings
- Transportation
- Driveways and parking spaces
- Basic Electrical
- Commercial, wiring, appliances, transformers,
intercom systems - Site Safety
- Alarms, lighting
- Temporary Permits