Title: From PII For ACEH


1
From PII For ACEH Nias
  • CEIPS-PII

AFTER THE EARTHQUAKES TSUNAMIS 26th of
DECEMBER 2004
2
Introduction
  • NANGGROE ACEH DARUSSALAM
  • UU No 18/2001 Act about Special Authority for
    Aceh Special Province as Provinsi Nanggroe Aceh
    Darussalam (NAD).
  • Highly applied Syariat Islam (Moslem Law) in
    social life. (97,74 Moslem Citizens NAD Govt)
  • DISASTER, PII and ACEH
  • Earthquakes and Tsunamis on 26/12/2004 in ACEH
    Nias have caused hundreds of thousands victims,
    mental uncountable materials.
  • PII wants to contribute in recovering NAD with
    Knowledge, Science, Engineering Technology
    (KSET) base.
  • This process needs cooperation from all of Acehs
    stake holder.

3
After The Earthquake Tsunami
  • RECOVERY
  • Estimated need for recovery in NAD Nias is
    growing up to Rp. 40 Trillion ( AU 5.7 Million)
  • WHAT ARE NEEDED
  • Readiness of construction and building components
  • Readiness of engineering design
  • Readiness of location
  • Readiness of know-how
  • CONTRIBUTION TO RE-BUILD
  • Settling rebuilding NAD Nias
  • Emergency Stage
  • Rehabilitation Stage
  • Reconstruction Stage
  • (Indonesian Government)
  • PIIs contribution in Rehabilitation and
    Reconstruction Stage is by its competency and
    network
  • NEEDS
  • Improvement in engineering ability
  • Improvement in construction services

4
Disaster Recovery Plan
  • PARTICIPATION OF THE WORLD
  • Aids have been still will be delivered from
  • National Community
  • Indonesian Government
  • International Associations
  • Foreign Countries
  • WHAT ARE NEEDED in ACEH
  • Readiness as recipient
  • Readiness of receiving international system
    standard
  • Readiness of rebuilding concept
  • ANTICIPATION, RESCUE RECOVERY
  • Knowledge of Nature in Site
  • Remote Sensing
  • Detection of Unusual and Danger Signaling
  • Mitigate the Disaster
  • Human Rescue
  • Temporary hostile
  • Attempt of Emergency Logistics
  • Emergency Function Recovery
  • Cleaning the Effect of The Disaster
  • Needs evaluation
  • Replanning
  • Reconstruction
  • NEED TO UNDERSTAND
  • Physic Social Needs
  • NAD Characteristics
  • Construction Support

5
Contribution Priority in NAD
  • DEMOGRAPHY of NAD (2002)
  • 4.010.800 citizens,
  • 1.751.200 labour force,
  • 61,15 live in North East coast
  • 21,85 in West South coast
  • 17 live in Middle and in the Island (83 live
    in shore)
  • 34 under poverty
  • Unemployment 17 (NAD Govt)
  • WHAT ARE NEEDED
  • Capability to empower labour force in NAD
  • Capability to adopt (new) development system from
    abroad
  • Job Creation
  • PERCEPTION
  • Priority object will be reconstructed the need
    of Aceh people according to themselves and their
    active participation
  • National Utilization of national resources
  • International Incoming of standard, engineering
    system technology

6
Engineering Resources and NAD
  • ECONOMY of NAD (1999)
  • Rp26,99 Billion PDRB w/ Oil Gas
  • Rp13,63 Billion PDRB w/o Oil Gas
  • 28,86 from Agriculture
  • 33,54 from Mines (Oil Gas)
  • 22 from Industry
  • 15,6 others services
  • (NAD Govt)
  • WHAT ARE NEEDED
  • Capacity building changed from Natural resources
    to Knowledge resources
  • PII
  • Information resources
  • Local National network (University,
    Professional Association), Regional (AFEO,
    AESEAP) and International (APEC, WFEO)
  • Engineers Task-force
  • Facilitating relationship with other
    Institution Industry, Research Institute
  • In coordination with National Local Government,
    International and Local NGO
  • LAND USE of NAD (2000)
  • Area of 57.365 km2
  • 69,07 Forest
  • 5,65 Plantation
  • 5,43 Rice field
  • 5,17 Small plantation
  • (NAD Govt)

7
Pre-Condition of Rehabilitation
  • Rehabilitation of NAD, while the detail of
    masterplan is not planned yet, needed a very
    large number of Temporary Shelter in a very short
    time.
  • There are also limited stock of building
    material, such as wood and stone.
  • This limited time and traditional building
    material can be solved by prefabrication system
    or completed knock down and supports of Building
    Component Industry.
  • NAD people have a specific character and
    community, and they dont want to lose these in
    Rehabilitation process.
  • There are a great shock and very deep feeling of
    losing that making difficulties to find fine
    construction workers among Aceh people.
  • Aceh Refugees not only found in NAD

8
Pre-Condition of Reconstruction
  • NAD Permanent Reconstruction covers a large area
    with a well-planned Regional Planning.
  • Large volume of building reconstruction can be
    solved by providing industrial system with full
    K.S.E.T.
  • Needed building component resources.
  • Needed ready human resources.
  • Needed higher engineering capacity so that the
    damage caused by earthquake and tsunami can be
    minimized in the future.
  • Efficiency needed to make the building cost in
    rehabilitation phase can also be used in
    reconstruction phase.

9
Pre-Condition of Aid
  • GENERAL
  • Public have the tendency to send the aid by
    themselves.
  • International aid, they tend to send their
    national products with international standard.
  • Indonesian government should drive national
    industries to be the main player for NAD
    Rehabilitation.
  • FOR ACEH
  • The aid should meet the specific demand.
  • NAD Rehabilitation and Reconstruction process
    should also be main income for Aceh people.
  • NAD Rehabilitation and Reconstruction should be
    conducted in a such way that also develop KSET
    resources, industries and human resources

10
Rehabilitation References
  • As a liaison for the donor that is willing to
    provide temporary shelters
  • Joint coordination with Local Government, UnSyiah
    and the representative of Aceh people as the
    owner of the shelters.
  • ENGINEERING
  • Prioritize the efficiency of work process and
    utilize the available technology
  • Prioritize building materials that can be used
    either for temporary shelter and/or permanent
    building so it will save costs.
  • Prioritize building engineering system that
    enable, light and easy to assemble, disassemble
    and reassemble in different locations.

toilet
DRAINAGE
COMMUNITY CENTER
SITE PLANNING
LAND LOCATION
The Institution of Engineers, Australia
11
Reconstruction References
  • Facilitating the people of Aceh aspiration,
    national interest and international
  • Emphasize on bottom up development process.
  • Support Syah Kuala University as a representative
    of the people of Aceh in guarding the direction
    of Aceh Reconstruction.
  • Transforming the people of Aceh as the subject
    and the main player of reconstruction
    development.
  • ENGINEERING
  • Prioritize the efficiency of work process and
    semi technology.
  • Familiarize the technology to the people
  • Prioritize the living environment that are save
    and Aceh Culture-friendly and easy to develop.

SOCIAL - CULTURE
ENVIRONMENT
ARCHITECTURE
sTRUCTURE
CITY PLANNING
OCEAN
LANDS RUGHT
SOIL
GEOLOGY
HRD
ENGINEERING TEKNOLOGI
MATERIAL RESOURCES
INDUSTRY
12
PII Basic Program
  • Partnership for international aid in the form of
  • Education support for training in engineering
    technology for the people of Aceh,
  • Engineering skill for workers
  • Basic tsunami earthquake science for teachers
  • Job creation
  • Directing domestic aid for local components
    with international standard.
  • Design based on pre-fab house system from
  • Design that match with local culture,
  • Local raw material and national industry,
  • System and component with international standard,
  • Togetherness in training and development.
  • Partnership with Syah Kuala University to develop
    a think-tank team and utilize the aid for NAD
    reconstruction together with other institutions.

13
PII Schematic Program
NATIONAL GOVERNMENT
ACEH COMMUNITY
PARTNERSHIP FOR INTL TRAINING EDUCATION
NAD GOVT
UNSYIAH
BAPPENAS
PARTNERSHIP FOR MEMORIAL INFORMATION TOUR
EMERGENCY
ACEH COMMUNITY RELATIONSHIP
ENG.EDUCATION SUPPORT
BLUE-PRINT
REHABILITATION
INFORMATION SUPPORT
LOCAL EXECUTOR (PII-ACEH)
PARTNERSHIP FOR ENGINEERING SOLUTION SOSIALIZATIO
N
RECONSTRUCTION
ENGINEERs MEMORANDUM
GOVT COORDINATION
ENGINEERING DESIGN
AID FACILITATION
PUBLIC AID INTERNASIONAL NGO (IEAust, ICE,
JSCE, etc)
INDUSTRIAL ENG SUPPORT
ASSEMBLY ADD DISMANTLE RE-ASSEMBLY EXPAND
A2DRE
PARTNERSHIP FOR LOCAL INDUSTRY DEVELOPMENT
KNOWLEDGE, SCIENCE, ENGENEERING TECHNOLOGY
14
PII Engineering Education Support
  • DEVELOP TRAINING PROGRAMS for unskilled and semi
    skilled WORKERS, to avoid building damage because
    of lack construction.
  • It is about what the minimum standard
    requirements are, right procedures in design and
    build, and its responsibility.

PARTNERSHIP WITH ICE LOCAL NGO
  • DEVELOP COURSES PROGRAMS for the TEACHERS from
    primary and secondary school. It is about what
    the earthquakes and tsunamis are, anticipation
    and what to do when and after earthquakes for the
    children.

PARTNERSHIP WITH JSCE LOCAL NGO
15
PII Engineers Memorandum
  • Empower the fundamentals of engineering design
    and craftsmanship in order to build houses and
    buildings that will protect the community from
    future earthquakes.
  • Strengthen facilities and technology for the
    tsunami early detection and early warning system
    to alert the public in short time, to follow
    emergency procedures to ensure their safety
  • Reinforce the publics awareness of the dangers
    and consequent safety procedures of earthquakes
    and tsunamis and reduce related risks by means of
    engineering education starting at the primary
    level school.
  • Empower and improve upon a system for prompt
    action and organized management of aid and
    resources in times of emergency disasters such as
    earthquakes, floods or tsunamis.
  • Empower the recovery and growth of job
    opportunity and job creation with small scale
    building industries with the added value from
    technology to meet demands and inspirations of
    future generation.

16
PII Engineering Design A2DRE House Concept
SEMI-PERMANENT
PERMANENT
TRAINING MODULES
Empowering local resources emphasize on
togetherness
Intl Aid 0r Grant Intl products
Moving with Indonesian Government expenses
BUILDING MATERIAL INDUSTRY
Additional Individual semi- Permanent component
Use Soft-loan from domestic banks
17
Terima Kasih
  • With our deepest sympathy for our brothers and
    sisters in Aceh Nias, let us look forward to
    working together to build a better future
  • Persatuan Insinyur Indonesia,
  • Januari 2005