Lease Modification of Industrial Lots - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Lease Modification of Industrial Lots

Description:

Lease Modification of Industrial Lots & Ways to Utilize Vacant Industrial Areas. by Raymond Ho ... Lease modification cases of 'I' to 'I/O' Ambiguous ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 21
Provided by: edwa84
Category:

less

Transcript and Presenter's Notes

Title: Lease Modification of Industrial Lots


1
Lease Modification of Industrial Lots Ways to
Utilize Vacant Industrial Areas
  • by Raymond Ho
  • 03.05.2003

2
Structure of Presentation
  • Obsolescence of I area
  • Existing Measures Undertaken
  • Lease Modification
  • Problems Facing and Solutions
  • Feasibility of other uses
  • Conclusion

3
Obsolescence of I Area
  • In 2001,
  • -Drop in price and rent 13 and 9
  • In 2002,
  • - take-up of private flatted factories
    -447,000m²
  • - Vacancy 10.9, 65 of which located in Tsuen
    Wan, Tuen Mun and Kwun Tong
  • - By year 2016, estimated surplus 4.2 million
    m²

Utilize vacant I area ? Urgent!!
4
Existing Measures undertaken
  • Planning Department -- change guidelines/rezone
  • Considerations
  • District planning intention
  • Surrounding land uses
  • Environmental and traffic conditions
  • Community and infrastructure provision
  • Redevelopment potential

5
Changing of Col. 1/Col. 2 Uses
  • I/O buildings
  • Lease modification cases of I to I/O
  • Ambiguous
  • X Difficult to enforce in case of breaching
    lease conditions

6
  • Inclusion of I.T. /Telecommunication
  • - TPB included in Col 1in 2001
  • - Apply waiver

7
Rezoning
  • R(E) e.g. Yau Tong, Aberdeen
  • Preferably at the fringe of I area
  • Special design/environmental mitigation
  • Concern marketability and suitability

X Interface problem, living conditions
8
Rezoning
  • CDA e.g. Ma Tau Kok, Tsuen Wan
  • Cluster of obsolete buildings
  • larger scale of redevelopment
  • Flexibility and better planning
  • X scattered obsolete I buildings and multiple
    ownership

9
Rezoning
  • OU(B) e.g. Kwun Tong, Aberdeen,Cheung Sha Wan
  • TPB introduced in 2001
  • Cluster of I/O buildings
  • Convenient locations
  • As a buffer zone

10
OU(B)
  • Planning Intention
  • employment zone for clean industrial, general
    office and commercial uses.
  • Flexibility
  • Usually in Col.1 restaurant, retail,
    non-polluting industrial, office..
  • Enhance conversion process
  • ? non-stop valuation process!!

11
Lease Modification
  • I ? OU(B) uses
  • User
  • Industrial/godown purposes ?non-residential
    (excl. e.g. hotel, petrol filling station and
    residential care home)
  • Valuation Concern

12
Problems and Possible Solutions
  • Current Government Land Premium Policy
  • - Huge amount of land premium
  • - Long negotiation process
  • Encourage redevelopment by premium reduction?

13
Real problems behind.
  • Multiple ownership
  • Financial viability
  • Similar to urban decay
  • Rezoning a good start but missed the economic
    booms in 90s

14
Possible Solutions
  • Standard rates
  • increase transparency and certainty
  • ? more incentives
  • X Difficult to determine the rates
  • Propose a broader base and review periodically

15
Possible Solutions
  • Pay by instalments
  • Loan schemes
  • Facilitators
  • Government take-up
  • X ineffective and money consuming
  • ? Minimum government intervention

16
Feasibility of other uses
  • Hotel
  • - Col. 2 in some places, e.g. Kwun Tong
  • X secondary locations
  • X expected completion 17,000 rooms in
    2003-2005
  • ? potential problem of over-supply

17
Feasibility of other uses
  • loft concept/home-office
  • - bad living conditions
  • Vertical-mix multi-use towers
  • - e.g. retail, parking, hotel, office,
    amenities, institution and entertainment
  • Advantages
  • Increasing revenue
  • Better urban environment
  • Integrating public uses

18
Potential Problems
  • Extreme compact
  • Compatibility
  • Infrastructural capacity
  • Adequacy of community facilities
  • Fire safety, hygiene.

19
Conclusion
  • Obsolescence of I area
  • Multiple ownership and financial viability
  • Minimum government intervention
  • Ways to enhance conversion

20
  • END
  • Thank you!
Write a Comment
User Comments (0)
About PowerShow.com