E04007 p0 electroproduction near threshold - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

E04007 p0 electroproduction near threshold

Description:

Missing mass technique detecting electron in HRS and low momentum protons with ... Helicity ( MPS mistakenly flipped will change back at next down ) ... – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 17
Provided by: ban51
Category:

less

Transcript and Presenter's Notes

Title: E04007 p0 electroproduction near threshold


1
E04-007p0 electroproduction near threshold
  • Hall A run coordinator report
  • April 1st 2008 April 8th 2008
  • Alexandre Camsonne

2
Experiment setup
  • Electroproduction near threshold
  • Missing mass technique detecting electron in HRS
    and low momentum protons with BigBite to
    reconstruct the p0
  • First use of the hadron package with wire chamber

3
Detector commissioning
  • DAQ checkout
  • Detector checkout
  • Wire chamber
  • HRS
  • New tracking code
  • Helium Balloon setting
  • Rate acceptance optimization

4
Beam tune
  • Compton chicane beam looks pretty good
  • Helicity checks
  • Beam polarization
  • Wien Angle set at 40 degrees
  • Moeller
  • Beam position pretty stable
  • Alignment checked with target with hole
  • No beam deflection for Big Bite at full current
  • Run without raster
  • Cell have 1 inch diameter

5
DAQ
  • VME V767
  • Noticed an issue of MWDC with V767, events empty
    for no apparent reason even at cosmics rate ( did
    not see with pulser tests )
  • Switch to fastbus for MWDC ( April 2nd )
  • ROC5 F1 TDC frequent errors and reboot
  • ( situation improved when Bryan increased buffer
    )
  • Might improve after tune of thresholds

6
DAQ
  • Coincidence window

7
Calibration
  • Efficiency
  • Optimization of focal plane
  • Optics
  • Sieve
  • Bigbite sieve
  • Calibration
  • Ta
  • C
  • H elastic

8
Big bite trigger scintillator calibration
9
HRS acceptance optimization
10
Bigbite wire chamber
  • Operating fine
  • One part of chamber disabled might be a broken
    wire. Short wire and edge of acceptance, we hope
    to be able to continue to run this way.
  • Once tracking code works fine, we will compare
    the difference before and after the problem
  • Spare chamber being repaired

11
Bigbite wire chamber
1500 V
1550 V
In process of finding optimal running
conditions Efficiency vs background Can be
thoroughly studied when tracking fully operation
12
Done this week
  • Target cooldown ( both loops use less than 10 g
    og flow)
  • Switch to fastbus
  • Calibration data
  • Production data
  • Kin A and Kin B
  • Moeller around 66 polarization

13
Issues resolved
  • Target both loop can stay cool. Very few power
    from beam.
  • VDC U2 plane TDC change fixed inefficiency
  • Noise issue MWDC ( grounding )
  • DAQ switch

14
Unresolved Issues
  • Being worked on
  • Tracking efficiency as function of HV and
    threshold
  • Helicity ( MPS mistakenly flipped will change
    back at next down )
  • Correlation beam trip / Bigbite trips
  • Spare chamber being worked on

15
Beam use
  • Scheduled hours 151 hours
  • ABU 40.3
  • BANU Fastbus switch, Wire Chamber work,
    detector HV trips, DAQ crash ( ROC 5 ), target
    and momentum changes
  • ACC availability 68

16
Plan
  • Production with optimized thresholds
  • Additional calibration data
  • Detector in reasonable state
  • Still optimizing
  • Still some parameters can be tweaked for the most
    difficult kinematics
  • ( HRS, time windows, thresholds ) give margin for
    handling rates

Conclusion
Write a Comment
User Comments (0)
About PowerShow.com