CMS HCAL TIMING - PowerPoint PPT Presentation

1 / 4
About This Presentation
Title:

CMS HCAL TIMING

Description:

CCM - FOUR Board Module that resides in the CMS HCAL Readout Box(RBX) ... Mid March delivery. Radiation testing of Production unit scheduled: ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 5
Provided by: Holm86
Category:
Tags: cms | hcal | timing | midfebruary

less

Transcript and Presenter's Notes

Title: CMS HCAL TIMING


1
CMS HCAL TIMING CONTROL MODULE(CCM)
  • CCM CLOCK CONTROL MONITOR
  • CCM - FOUR Board Module that resides in the
    CMS HCAL Readout Box(RBX)

Interface between Front End Boards and Main
Control System
2
Modifications from TB2003
  • Added 2nd QPLL/XTAL to improve FE clocking
    layout.
  • Added 2nd FPGA to allow for TMR
  • Modified Status bits to be cleared on a
    communication with master(Will be controls
    responsibility to monitor and operate on them).
  • QPLL lock bits monitored.
  • Added Broadcast Commands via TTC system. (QIE
    Reset FE PLL Reset)
  • Added Delay Register to QIE Reset Command.
  • New PCB physical layout Mechanical Shell

3
CMS HCAL TIMING CONTROL MODULE(CCM)
  • STATUS
  • (1) Version 4 CCM preproduction assembled and
    tested. 5 more will be assembled at FNAL(limited
    by QPLL s)
  • 3 of 4 the board layouts will be used for
    production.
  • 4th board had minor modification. (New layout
    finished)
  • Ordered production quantity of 150 of each of the
    4 boards(panelized as a group) with delivery of
    Feb. 27th
  • Parts will be delivered to Assembly house on Feb.
    23
  • 1st order will be back - 1st week of March.
  • 144 assembled panels by March 12th.

4
CMS HCAL TIMING CONTROL MODULE(CCM)
  • Status cont.
  • Mechanical shells are being fabricated by Florida
    State University (Vasken)
  • Drawings are finished and material is in house
  • Prototype will be constructed next week
  • Mid March delivery
  • Radiation testing of Production unit scheduled
  • Indiana U. Cyclotron - March 16th
  • Delivery to CERN hopefully end of March for a
    number of them
Write a Comment
User Comments (0)
About PowerShow.com