EUROGAS INTERNATIONAL INC. ANNUAL GENERAL MEETING

Description:

45% participating interest in the Sfax Permit comprising 1 million acres ... Results: El Garia oily but low permeability. Reineche tested 280 API oil ... – PowerPoint PPT presentation

Number of Views:84
Avg rating:3.0/5.0
Slides: 11
Provided by: Bru138
Category:

less

Transcript and Presenter's Notes

Title: EUROGAS INTERNATIONAL INC. ANNUAL GENERAL MEETING


1
EUROGAS INTERNATIONAL INC.ANNUAL GENERAL
MEETING
  • June 15, 2009
  • CNSX EI

2
Assets of the Company
  • 45 participating interest in the Sfax Permit
    comprising 1 million acres
  • 45 ownership of an offshore production platform

3
Eurogas International Inc.
  • August 5, 2008 Eurogas International Inc. (EII)
    was launched as an independent company
  • Each shareholder of Eurogas Corporation received
    one newly issued common share of EII for every
    five shares of the Eurogas Corporation shares
    held
  • Eurogas Corporation holds Preferred Shares face
    value 32.5MM
  • EII was funded with 10 million in treasury
  • On March 31, 2009, EII began trading on the
    Canadian National Stock Exchange (CNSX) under the
    symbol EI.

4
Sfax Permit Area
5
Ras El Besh 3 Exploration Wells
  • REB3 drilled in 2008 as commitment well for the
    Sfax Exploration Permit
  • Targeted the El Garia and Reineche carbonate
    formations down to 2300 m
  • Drilling costs paid by farmin partner
  • Results El Garia oily but low permeability
  • Reineche tested 280 API oil Drilled
    sidetrack tested oil Re-processing of
    seismic required

6
Farmin by Delta Hydrocarbons
  • April 2008 Delta farmed in for a 50
    participating interest in the Sfax permit area
    and the production platform
  • Delta commitment spend US125 million
  • EII participating interest from 45 to 22.5
  • EII received US 11.2 million cash
  • May 22, 2009 Delta exits after spending US 110
    million - Delta exit terms Eurogas
    participating interest returns to 45 - Delta
    responsible for 50 of abandonment costs at
    REB3 - Agreement to monetize production
    platform - Delta can recover up to 20 million
    from sale of equipment or oil - Delta retains
    50 participating interest in Seawolf arbitration

7
Sfax Permit a portfolio of prospects
  • Reineche structures to follow up on REB3-
    Cercina 12 MM bbl oil recovered, 2500 bopd-
    Chergui 88 bcf gas, 50 MMcf/d
  • Ashtart satellites- Ashtart field 330 MM bbl
    oil produced, 8500 bopd
  • Salloum prospect- flow tested 1,800 bopd
  • Jawhara prospect- flow tested 1,200 bopd

8
Exploration Program
  • Geological studies- 3D basin modeling study-
    Reineche carbonate study- Bireno carbonate
    study
  • Geophysical activity- Reprocess 2004 Sfax 3D
    survey- Reprocess 2007 Anadarko 3D survey-
    Reprocess 2007 Salloum 3D survey- Reprocess
    older 3D survey on Ashtart- Thin bed analysis
    on all seismic
  • Reineche 2D seismic program depends on
    reprocessing results likely 2010

9
Offshore Production Platform
  • EII ownership 45 of Innovative Production
    Systems Inc.
  • Sold 50 to Delta for US 16.5 MM (gross)
  • Repairs / modifications paid by Delta totalling
    US 13.6 MM
  • 2009 Budget of 6MM to be spent on further
    improvements and refurbishment to prepare for
    lease or sale

10
2009 Budget Summary for Sfax Permit Area
  • Sfax Permit Area US 5.4 MMDelta spending in
    Q1 2009 ( 1.8 MM)Net to EII US 1.7
    MM
  • Production PlatformRepairs and upgrades US
    6.0 MMDelta spending in Q1 2009 ( 1.9
    MM)Net to EII US 1.8 MM
  • TOTAL net to EII for 2009 US 3.5 MM