1Richard EveretteLearning Consultant
2Integrated means working togetherConstructing
a world class building - the reality
3Innovation constructing a world class building
The Vision
X
- Richard Everett
- eLearning Consultant
Ask not what can you do for your technology?
ask what can your technology do for you? with
apologies to John F Kennedy
4The learning environment key requirements
Slide reproduced by kind permission of Peter Orr,
Honeywell
5The barriers
- Innovative concepts
- Its not the way we do it
- Consultants will design what they are comfortable
with - Builders will build what they know
- Innovation Risk (and therefore cost)
- Integrated intelligent building
- Works against existing structures
- LSC funding
- Architects
- Mechanical Electrical (ME)
- Silos that defend the status quo
- Achieving the integration vision requires
collaboration
Slide reproduced by kind permission of Peter Orr,
Honeywell
6- If I have to cut a wing off this building to
make the IT learner experience exemplary - I will
- Mark Dawe, Principal, Oakland's College
7For instance Infrastructure Wiring
- Traditional building
- Security cameras
- Audi Visual
- Computing' data
- Specialist Media (TV editing etc)
- Anti theft devices (PIRs etc)
- Heating Ventilation and Cooling (HVAC)
- Phones
- Fire (but..)
- Signage
- ID Cards systems (Access)
- Wireless !
- Etc etc
IP
8Stage D is too late
- LSC
- Application in Principle (AiP)
- RIBA
- Key Planning Stages
- Stage B Design Brief (Engagement of consultants)
- Stage D Design Development (Cost plan)
- Stage E Technical Design (Dependency of Stage D)
- Planning permission
- LSC
- Application in Detail (AiD)
Details can be found on the LSC and RIBA websites
at http//designguidance.lsc.gov.uk and
http//www.architecture.com
9Oakland's IT / Intelligent building
- Stage D
- Development of concept design
- Structural Building services systems
- Outline Specifications
- Cost plan
- Procurement route
- If its not in Stage D
- It will not be built
10Oakland's IT / Intelligent building
- IT consultants appointed
- Cannot change design - Examples
- Raised floors
- Walls unable to take weight of Plasma screens
- Wiring trays insufficient for cabling
- Wiring vertical ducts cannot take volume required
- Insufficient cooling
- Cost plan includes outdated mechanisms for ME
and Architects - Constantly fighting the status quo
- too late
11LSC RIBA conference
- Innovation by Design - Website
- http//designguidance.lsc.gov.uk
- Phil Head
- LSC Director of Infrastructure and Property
Services - LSC advice needs to change to include IT at AiP
stage (RIBA Stage B) - Backed up by Architects Colleges
- Undertook to change the advice to colleges
- Lesson
- Plan your IT infrastructure/intelligence earlier
- Engage IT consultants at AiP / RIBA Stage B
12The experience has been
- Bruising
- Great fun
- Frustrating
- Pleasurable
- in equal measures
It is worth fighting for !
13If there was one thing
Slide reproduced by kind permission of Peter Orr,
Honeywell
14Design Team interfacing
- Computacenter
- IT Consultancy
- Drama by Design
- Media Consultancy
- Bond Bryan
- Architects
- Boxall Sayer
- Cost Consultants
- Mott MacDonald
- ME consultants
15Thank you
- Richard Everett eLearning Consultant
- The Old Coach House
- r/o 9 High Street
- Old Town
- Stevenage
- SG1 3BG
- 01438 215 447