Title: Endcap ElectroMagnetic Calorimeter


1
The Electromagnetic Calorimeter
2006 Operation
J. Sowinski 6/22/2006
2
EEMC Performance
  • Participated in 90 of all production runs
  • Fewer problems all kinds
  • Radiation problems reduced by shielding
  • Fewer memory upsets and forced reconfigurations
  • Check each fill and reconfigure once a day still
    good practice
  • MAPMT FEE power cycle every few days necessary
  • Fewer Water system problems
  • Bubbles not an issue
  • Chiller does need fan in warm weather

3
  • Operation easier
  • Web based documentation WW Jacobs
  • Improved user interface
  • Bill Waggoner
  • Live MAPMT FEE display
  • Expert controls, sectional reconfig., box config.
    download
  • Monitoring and alarming
  • Paul Nord
  • Tower FEE lookup tables on short notice
  • Other features and housekeeping

4
Losses during the year
  • Electronics
  • Lost 8 bases (out of 1296 channels)
  • A few came and went
  • 6 MAPMT bases lost late in run (heat, humidity)
  • A few additional FEE channels failed
  • ETOW FEE
  • 2 new channels (plus some old friends)
  • No working spare digitizer cards of 3 available
  • MAPMT FEE
  • 5 additional boxes, few single channels wont be
    fixed
  • Need to schedule spares at IU
  • Radstone channel failures at end of run
    resets ok, but

5
Shutdown Work
  • Base replacement and FEE/MAPMT box work scheduled
    in September
  • Magnet water hose replacement late July early
    start on FEE work as time allows
  • User interface
  • Intermittent HV system hangs on reboot
  • Power supply GUI color coordination
  • Further streamline controls
  • Radstone reset button
  • Other helpful buttons

6
  • Controls and interlock upgrades
  • Tower air interlock
  • Water chiller remote control and monitoring
  • Box temperature hookup and monitor
  • Multi-output local clock (with laser controls)
  • Leak detection on MAPMT water lines
  • Fast data to L2

7
Shift Crew Interactions
  • Fully turned over to detector operators this year
  • Few too many phone calls on non-problems
  • Improve documentation
  • Improve training
  • Will start from greater level of familiarity next
    year
  • Considering going to expert on call at IU rather
    than onsite for next year
  • Certainly only after commissioning and
    calibration complete

8
  • Continued shielding work
  • Does it trigger or make it into analyses?

BEMC post mid-run install
south
bottom
north
f
top
4 or more towers adjacent in h
south
-1
h 0 1
south
bottom
north
f
top
south
-1
h 0
1
9
General Observations and Suggestions
  • Information transfer on change over days still
    not what it needs to be
  • Change over reports need to be taken seriously
  • People need to stay full changeover shift (but
    this may have reached achievable level)
  • People going off shift should leave phone number
    and are on call at least they pay for info not
    transferred
  • Dont change full crew on changeover days
  • Shift leaders, one detector operator, crew,
    detector operator trainee on Tuesday
  • Period coordinator, other detector operator,
    shift leader trainee
  • Encourage multiple successive weeks on shift

10
  • More manpower on site for short turn around
    analysis tasks Phenix too much, STAR too
    little?
  • Trigger tests
  • Background questions
  • Run progress
  • Need additional space for onsite (at WAH?)
    experts
  • Is existing counting house used optimally?
  • Only free internet connections in conference room
  • Other office space elsewhere on site?
  • STAR shift crew mailing list (PC, SL, DO)
  • Detector subsystems short crib sheets
  • Reinstate ongoing issues in shift log
  • Read and acknowledge subsystem updates before
    going on shift