Title: Material Procurement


1
  • Material Procurement
  • Construction material All the material has
    been ordered with some spare (10)
  • Delivered material
  • PNPI M3R4 Panels 70 - HV bars 100 - FR4
    frames 100
  • PNPI M2R4 Panels 20 - HV bars 100 - FR4
    frames 100
  • PNPI M4R4 Panels 0 - HV bars 90 - FR4
    frames 0
  • CERN Panels 60
  • INFN M3R3 completed M2R3 completed M5R4
    Panels 20
  • HV bars 40 FR4 frames 100 Other elements
    100
  • M1 panels 0
  • Faraday cage Final FEE board dimensions M3R3
    ready All the others need the preparation of
    drawings (M3R4-M2R3-M5R4....)
  • Honeycomb panels - We got samples of M1R3/R4
    regions, cut at the right dimension and a
    quotation. Early 2005 we should go for the
    purchase and the production.

2
  • Panel production
  • A strict monitoring of the panel quality and of
    the production rate is performed
  • with regular visits (every two weeks) to the
    company and with checks at the production site.
  • This is certainly the most critical item on the
    chamber and the production has to be followed
    closely.
  • The required planarity is very demanding (- 90
    micron) especially on the largest panels (400 x
    1600 mm2)
  • A rate of 250/month is mandatory to match the
    chamber production in the various sites (see next
    plots).
  • To monitor the production yield a data base on
    each INFN site is operational.
  • This tool helps also to have a more efficient
    chamber production.
  • The yield appears quite good approximately 90
    .
  • We are also developing a tool to recover non
    planar panels (especially the gold plated one,
    which are the most expensive).

3
Panels needed at production sites according to
official plan
4
  • Preliminary plans to equip and to install
    chambers
  • Once the chamber have been tested with
    radioactive source, FEE electronics, LV and
    Faraday Cage must be assembled on chamber (and
    tested).
  • Part of this work will be done at the production
    sites (at LNF, for whole INFN, at PNPI and at
    CERN).
  • Probably, for PNPI chambers, electronics will be
    assembled at CERN.
  • The first chambers will be equipped as soon the
    CARDIAC boards will be available.
  • Shipping of INFN chambers to CERN in special
    trolleys with shock absorbers stocked in a
    container (see photo).
  • Shipping of PNPI chambers in wooden boxes
    (CSC-CMS like)
  • Reception at CERN about 200 m2 available (not
    so much)
  • Gas flux last test with HV Installation on
    the detector
  • We have yet to deploy a detailed plan for this
    part of the installation
  • check the time and the personnel needed
  • logistics at CERN and the infrastructure needed
    (gas, HV, etc...)
  • setup the procedures and the team for the
    installation on the detector (integration among
    various labs)