Title: HVAC


1
HVAC
  • MAJOR COMPONENTS OF HVAC
  • CHILLERS
  • DX- UNITS
  • PUMPS
  • COOLING TOWERS
  • FANS

2
MAXIMUM POWER CONSUMPTION
  • CHILLERS
  • AIR COOLED 1.3KW/TR
  • -WATER COOLED 0.65KW/TR
  • DX- UNITS
  • - AIR COOLED 1KW/TR
  • - WATER COOLED 0.75KW/TR

3
MAXIMUM POWER CONSUMPTION
  • 3. PUMPS
  • CHILLED WATER PUMPS 0.08KW/TR
  • CONDENSER WATER PUMPS- 0.07KW/TR

4
MAXIMUM POWER CONSUMPTION
  • 4. COOLING TOWERS 0.075 KW/TR

5
MAXIMUM POWER CONSUMPTION
  • 5.a. AHU FANS 0.2 KW/ TR
  • 5.b. VENTILATION FANS 0.015KW/TRe

6
MAXIMUM POWER CONSUMPTION
  • TOTAL FOR CHILLED WATER AIR CONDITIONING
  • AIR COOLED CHILLED WATER SYSTEM 1.595KW/TR
  • WATER COOLED CHILLED WATER SYSTEM 1.09 KW/TR

7
MAXIMUM POWER CONSUMPTION
  • TOTAL FOR DX AIR CONDITIONING SYSTEM
  • AIR COOLED DX - SYSTEM - 1.015KW/TR
  • WATER COOLED DX - SYSTEM 0.84KW /TR

8
RESPONSIBILITY
  • REDUCTION OF POWER CONSUMPTION AIR CONDITIONING
    SYSYTEM
  • REDUCTION IN LOAD
  • IMPROVEMENT IN SYSTEM EFF.

9
REDUCTION IN LOAD
  • 1. REDUCTION IN EXTERNAL LOAD -
  • - INSULATION OF WALLS ROOFS
  • - MINIMISING WESTSIDE WINDOWS
  • - HAVING ALCO PANELS
  • - MINIMISING FRESH AIR (USE OF OZONE SYSTEM
    FOR TREATMENT)
  • - ENERGY RECOVERY

10
REDUCTION IN LOAD
  • 2. REDUCTION IN INTERNAL LOAD
  • OPTIMISE THE ROOM SET TEMPERATURES
  • SHUT DOWN COMPUTERS AFTER WORK
  • OPTIMISE ROOM LIGHTING
  • USE LOCALISED HOT AIR EXHAUSTS (WHEREVER
    POSSIBLE)
  • OPTIMISE MOTOR RATINGS

11
IMPROVING SYSTEM EFFICIENCY
  • - INSTALLATION OF VAVs
  • - INSTALLATION OF VFDs
  • - MAXIMISE ENERGY RECOVERY
  • - PROPER INSULATION AND SEALING OF PIPES
  • - PROPER INSULATION AND SEALING OF DUCTS
  • - MINIMISE THE LENGTH OF DUCTS
  • IF POSSIBLE PIPING (KEEP PLANT CLOSE TO USER)
  • - AUTOMATE THE EXHAUST FANS
  • KEEP POWER FACTOR HIGH NEAR LOAD
  • USE NATURAL COOLING (AS MUCH AS POSSIBLE)

12
OPERATION MAINTENANCE
  • PERSONALLY MONITOR DAILY CONSUMPTION EVERYDAY
  • MAINTAIN CLEANLINESS
  • MONITOR EFFECTIVENESS OF VFDs
  • LOOK FOR MONOTONY AND DEVIATIONS
  • HAVE MONTHLY AWARENESS PROGRAMS
  • HAVE ROLLING TROPHY FOR LOWEST CONSUMER
    (DEPARTMENT/ SECTION)
  • SET SMALL TARGETS FOR EACH INDIVIDUAL IN
    OPERATIONS TEAM AND AWARD THE WINNERS
  • RECORD POWER CONSUMPTION OF EACH UTILITY AT LEAST
    ONCE A YEAR.

13
REMEMBER
  • GRID POWER -
  • EACH Kw SAVED RESULTS IN REDUCING 6.4 TONNES OF
    CO2 EMISSIONS/ YEAR
  • 2. DIESEL GENERATORS -
  • EACH Kw SAVED RESULTS IN REDUCING 7.2 TONNES OF
    CO2 EMISSIONS/ YEAR