Title: AFSPC Corrosion Control Program
1AFSPC Corrosion Control Program
Mr. Dennis Huff 90 MMXS/MMXFC for richard.bliss_at_P
eterson.af.mil
2Overview
- Corrosion Control Areas
- Support Activities
- Problems Concerns
- On Going Projects
- Achievements
- Goals
- 02/03 Site Surveys
- Future Meetings
- Summary
3Corrosion Control Areas
- Spacelift
- Launch Facilities in Support of
- Atlas
- Delta
- Titan
- Communications-Electronics
4Corrosion Control Areas (contd)
- Space Lift
- Launch Facilities - Cape Vandenberg
- Support Equipment (SE)
- Aerospace Ground Equipment (AGE)
- Real Property Installed Equipment (RPIE)
5Corrosion Control Areas (contd)
- Aircraft
- UH-1N Helicopters (AFSPC 25)
- Lead Command for UH-1N (AF 62)
- Intercontinental Ballistic Missiles
- Minot - 150 MM III
- Malmstrom - 200 MM III
- F.E. Warren - 150 MM III 43 Peacekeepers
6Corrosion Control Areas (contd)
- Communications
- 60 Major Sites Worldwide
- 16 Major Programs - DSP, AFSCN, Range, DSCS,
DMSP, - BMEWS, GPS, ..
7Support Activities
- Aircraft (UH-1N Helicopters)
- Unit Level Maint. Performed By Contractors
- DLM - Corpus Christi Army Depot, TX
- Intercontinental Ballistic Missiles
- MM III and Peacekeepers - Maintenance Squadron -
Civil Service - Spacelift
- Launch Base Support Contractors
- Launch Vehicle Contractors
8Support Activities (contd)
- Communications - Electronics
- Ranges - Range Technical Services Contractor
- DSP, AFSCN, DMSP, DSCS, GPS, BWEWS, and other
systems - Blue Suit and contractor maintained - Mobile DLM - Ogden ALC
9Problems Concerns
- Budget constraints
- Age of systems/equipment
- UH-1N cabin floor panel corrosion
- Main rotor blade corrosion
- Completion of all CC related tasks during PRP
- CE Repair of Real Property
- Environmental restrictions
10Problem Corrosion on 68-10776
11Melbourne Beach ROTI
Bldg. 0004
Bldg 0005
12On-Going Projects
- Pro-active approach to CC
- The re-write of AFSPC 21-105 (in 3 ltr
coordination) - Correction of problems identified in during AFSPC
site visits - Development of an Environmental Strategic Plan
13On-Going Projects
- Identification of Environmentally friendly
products that work - Determining cost of corrosion
- PK Deactivation
- Began Oct 02
- Ends in 05
14On-Going Projects
HD CPC
Pour and Fill
Corrosion Preventative Gasket
15Achievements
- New products being tested on site
- Purchased two Metallization units in 02. One
for - ICBMs, one for 2 SLS at VAFB
- Located/transferred 3rd unit to Eastern Range
- Metallization is now used by range tracking
- Excess equipment at one AFSPC unit is being
- sent to another AFSPC unit saving
- Attended Helicopter CPAB
- Completed Environmental Needs Assessment
16Helicopter CPAB
Helicopter Repair Facility Corpus Christi Naval
Air Station
UH-1N Rotor Blade
17Goals
- Increase visibility of corrosion control
- efforts on AFSPC aircraft, ICBM, Range,
- Space Launch and Communications-Electronic
- systems
- Lower the cost of corrosion
- Increased contractor surveillance
- Increased customer feedback and
- involvement
- Improved SPD and SSM support and
- communications
- Become an active player in the funding
- process
1802 Site Surveys
- Patrick AFB, FL
- 30 April, 1 May 02
- 36 Units Reviewed
- Minot AFB, ND
- 17 18 Jun 02
- 4 LFs, 2 MAFs
19Site Survey Patrick AFB
Post 911 Cape Security
Bldg 313 Depot Shops
20Site Survey Patrick Contd
Bldg 313 Depot Shops Palletized metallization unit
FPQ-14 Radar
21Site Survey Patrick Contd
Metallized material test
Hanger H FPQ-14 From Bermuda
22Site Survey, Minot
Launch Support Bldg Door
Test Paint on Launch Closure Door
2303 Site Surveys
- Pillar Point, Onizuka, Camp Parks, Beale, CA
- 14 - 18 April 03
- VAFB, CA
- 21 25 April 03
- FE Warren AFB, WY
- 23 24 June 03
24Future Meetings
- Formans Meeting/29 April 1 May 03/ Peterson,
CO - Coatings/Removal Conf.. 20 - 23 May 03/Colo.
Spgs. - AFSPC CPAB/23 27 Jun 03/FE Warren AFB, WY
- Navy Rust 2003/ 14 18 July 03/ Louisville, KY
- P2 Workshop/ 11 - 14 August 03/ San Antonio, TX
25Summary
- Corrosion
- Support Activities
- Problems Concerns
- On Going Projects
- Achievements
- Goals
- Site Survey
- Future Meetings