COOLSB1: Fast Stochastic Cooling of Secondary Beams - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

COOLSB1: Fast Stochastic Cooling of Secondary Beams

Description:

Simulation of cooling process. Development and test of prototype power amplifiers ... and Kickers for stochastic cooling are an indispensable part of the FAIR project ... – PowerPoint PPT presentation

Number of Views:105
Avg rating:3.0/5.0
Slides: 9
Provided by: Bell80
Category:

less

Transcript and Presenter's Notes

Title: COOLSB1: Fast Stochastic Cooling of Secondary Beams


1
COOLSB1 Fast Stochastic Cooling of Secondary
Beams
  • F. Nolden
  • GSI
  • December 8, 2006

2
Fast Stochastic Cooling of Secondary Beams
Objectives for COOLSB1 (Task 15 of Dirac
Secondary Beams)
  • Electrode development
  • Simulation of cooling process
  • Development and test of prototype power
    amplifiers
  • Design, construction, and test of pick-up and
    kicker prototypes
  • Test of complete prototype system
  • Technical design report
  • Notch filter system design

3
Slotline Test Structures
Test structure with field probe
3D field measurement device
4
Cryogenic Test Pick-up Tank
Cold Head
Helium compressor
5
First Optical Notch Filter
6
Calculation Pick-up and Kicker Tank
7
Tentative Schedule for 2007
  • design and test of notch filter in ESR ? autumn
    2007
  • design, manufacturing, and test of electrode
    modules, plunging units and other tank
    subcomponents ? summer 2007
  • design, manufacturing, and test of complete tank
    ? beginning 2008

8
Status
  • Pick-ups and Kickers for stochastic cooling are
    an indispensable part of the FAIR project
  • COOLSB1 is delayed, but rearrangement of
    resources (manpower) is planned to get pick-up
    and kicker prototypes in early 2008