DCS New Technology Demodulator Development: DAMS NT - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

DCS New Technology Demodulator Development: DAMS NT

Description:

... ISI for Competitive Phase 1 Development : Issued Contracts for Proof of Concept ... Schedule: System Delivery Can Not Impact the DAPS II Delivery and ... – PowerPoint PPT presentation

Number of Views:60
Avg rating:3.0/5.0
Slides: 6
Provided by: waynew9
Category:

less

Transcript and Presenter's Notes

Title: DCS New Technology Demodulator Development: DAMS NT


1
DCS New Technology Demodulator Development DAMS
NT
  • (Demodulator Acquisition Monitoring System
  • New Technology)

2
What is DAMS NT ?
  • The Application of Digital Signal Processing
    Technology to DCS Demodulator Design
  • Implementation of DCS Message Decoding/Demodulatio
    n Using Software Functions Executing Within High
    Speed Signal Processor Chips
  • Significant Hardware Size Reduction Compared to
    Present Demodulators
  • Allows Software Interface Between DAPS II and
    DAMS NT for Enhanced Computer Control of DCS
    Channels

3
History of DAMS NT
  • Desire for New Demodulator System Coupled to DAPS
    II, Software Based DSP System with DAPS II
    Control Interface
  • Task Assigned to ISI (DAPS II Developer)
  • RFI Circulated to Industry for Comments
  • Two Companies Selected by ISI for Competitive
    Phase 1 Development Issued Contracts for Proof
    of Concept
  • DSPCon, New Jersey and Signal Engineering, San
    Diego

4
History of DAMS NT (Continued)
  • Both Companies Conducted Preliminary Design
    Reviews During October 2001
  • Live System Demonstration Scheduled for Week of
    December 10, 2001 at the NOAA Wallops Site
  • NOAA Team and ISI will Review Test Results
  • Production Contract to be Awarded to Most
    Successful Candidate

5
DAMS NT Pacing Issues
  • Critical System Must Process Both 300 bps and
    1200 bps Satellite Data Successfully
  • Tight Schedule System Delivery Can Not Impact
    the DAPS II Delivery and Operational
    Implementation
  • If BOTH (Performance and Schedule) Conditions not
    met, Then DAPS II Interface to be Designed for
    Current Bank of Demods
Write a Comment
User Comments (0)
About PowerShow.com