TL 3 System 4400 lb Pickup Truck 1800 lb Small Car Impacting at 62 mph 25 degrees - PowerPoint PPT Presentation

About This Presentation
Title:

TL 3 System 4400 lb Pickup Truck 1800 lb Small Car Impacting at 62 mph 25 degrees

Description:

Impacting at 62 mph. 25 degrees. Nucor Steel Marion, Inc. n u c o r h i g h w a y .com ... After impact. Tension tolerance is 15-20% or up to 2500 lbs. ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 23
Provided by: reidh4
Category:

less

Transcript and Presenter's Notes

Title: TL 3 System 4400 lb Pickup Truck 1800 lb Small Car Impacting at 62 mph 25 degrees


1
TL 3 System4400 lb Pickup Truck1800 lb Small
Car Impacting at 62 mph25 degrees
2
(No Transcript)
3
18 wheelers? NOT TESTED
4
System Components
  • Simple System
  • Line Posts
  • Cable
  • Hook Bolts
  • Turnbuckles
  • End treatment

5
Line Posts
6
Turnbuckles
  • Standard Cable 1 x 750 (229m)

7
Turnbuckles
  • When turnbuckle interferes with post, leave off
    bolt
  • Best practice is NOT to install all three
    turnbuckles in same space

NOT like this!
Like This!
8
End Treatment
  • 3 CRP posts _at_ 6-3
  • 6 End Terminal Posts _at_ 6-6
  • Line posts (refer to plans)

9
CRP Posts
10
Delineation
  • 3M 94 Primer
  • 3M High Intensity Prismatic 3931 Reflective
    Sheeting

11
Maintenance of System
12
Common Impacts SIMPLE REPAIR
13
CRP Posts
Line PostRepair
14
Line Post Repair
  • Make SURE
  • Cable on correct side
  • Hook bolt nuts hand tightened
  • Cable Heights
  • TOP 29.5 1
  • MIDDLE 25.5 1
  • BOTTOM 21.5 0/-2
  • Check and record tension

15
Uncommon Impacts
16
Releasing Tension
  • Loosen turnbuckle(s)
  • Cable grip and winch pull towards accident
  • Ratchet come-along and 2 cable grips
  • Knock over CRPs
  • LAST CASE CUT THE CABLE

17
QuickDe-tensioning
18
CRP Repair
19
Re-tensioning STANDARD CABLE
  • Check Temperature Chart
  • 15 higher
  • 0 to 1.5 years
  • After first major freeze
  • After impact
  • Tension tolerance is 15-20 or up to 2500 lbs.
  • Check within first month after installation
  • Periodically over the first year

20
CheckingTension
21
U.S. High-Tension Cable System
Additional information, photos, videos, and
manuals available at nucorhighway.com
22
U.S. High-Tension Cable System
Questions ?