Title: Ofgem Open Letter Next Steps


1
Ofgem Open Letter Next Steps
  • Transmission Workstream
  • 02-08-07

2
Immediate issue - QSEC
  • National Grid NTS believes that the September
    QSEC should be run as planned.
  • However we have evaluated a number of options and
    would like User input on these.
  • The intention at present is that the auction
    invitation will be issued on or about the 16
    August.
  • Therefore any action to change this timing needs
    to be undertaken imminently.

3
QSEC Timing Options
4
Workshops
  • Three workshops have been planned to consider the
    issue of Baselines and associated topics, most
    notably substitution.
  • Workshop 1 14 August
  • Presentation discussion on the approach taken
    to set the current baselines
  • Timeline for reviewing associated issues
  • Workshop 2 17 August
  • Discussion of methodology for setting baselines
  • Interaction with substitution
  • Workshop 3 12 September
  • Presentation of options for setting baselines and
    approach to substitution

5
Discussion
  • Comments on workshops
  • Timings
  • Content