Title: HEAnet Dark Fibre Update
1HEAnet Dark Fibre Update
- Workshop on
- Customer Empowered Fibre Networks
- Prague, May 16th, 2004
- Eoin Kenny eoin.kenny_at_heanet.ie
2Brief Overview
- Timescale of fibre work to date
- Dublin metro network
- Regional metro network
- National fibre network
- International/cross border fibre projects
- Out sourcing
- Provisioning tool
- New possibilities with fibre!
3A bit of History
- Year 1 2003 2004
- First steps ask clients for requirements
- Talking to international peers
- Defining requirements
- Year 2 2004 2005
- Test links
- Select technology (tender)
- Test services
- Year 3 2005
- Extend network
- Launch service for clients
- Out source the management of layer 1 and 2
- New possibilities Research/Technical/Tools
42003 First HEAnet Fibre
- HEAnets first metro fibre pair was in New York!
20th of November 2003. - 12Km in Manhattan from NYSERnet connecting 32AoA
with 60 Hudson St - Annual Lease 3.1/2.4 per metre
- Will end Nov 2005
52004 First Irish Fibre Lit
- 25th of March 2004 First HEAnet Irish fibre pair
lit at 2.5Gbit/s from DCU to Inflow (HEAnet PoP).
Now upgraded to 10Gbit/s. - 10 more point to point fibre links added since.
- HEAnets first 10GE link delivered 2nd of
November 2004, 4 more added since. - Equipment currently used
- 10GE directly onto fibre no WDM
- nx1GE directly onto fibre using CWDM add/drop
muxes.
6Fibre Map Dublin - 6 providers
7Survey of Dublin fibre
8Current Dublin Metro
Cisco 7606
9Dublin Facts
- 146 Km of fibre
- Average price per metre 1.22 per year including
VAT average is falling as more fibre is leased. - 5 year lease agreements
- Currently in pre-operations
- Mix of production/non-production traffic
- Currently providing 5 P2P GE links over our fibre
network for clients and 6 GE point to point links
for our own IP Network
10Regional Metro
- E-net awarded tender to operate the Government
regional Metro networks in June 2004 - E-net contract is for 15 years. A private
company. - Phase 1 27 towns (ending completion)
- Phase 2 89 towns
- Very complicated method of calculating price.
Based on of the metro used and also on the
number of Metro networks ridiculous model! - Pricing example
- 70 of metro no discount for additional metros.
Vat included. - 5 year lease 3.15 per year
11Galway MAN fibre
12National Fibre network
LetterKenny
Derry
Belfast
Dublin
Galway
Limerick
Cork
13National fibre pricing
- HEAnet has received a pair of fibres on the ESBT
National network via an agreement with the
Government. Due to the network receving public
funding. - Contract signed?
- 8 Year agreement
- HEAnet only pays 2 of commercial price per year
for maintenance approx 60k per annum - Commercial price 2.54 per metre per year
annual lease - 20 Year IRU 13.5 per metre once off
14National Fibre
- Fibre length 1300Km
- Not yet in production
- Contract for DWDM equipment finished awaiting
signing very soon - Installation/Commissioning of equipmrnt this
July/August - Lighting one 10Gbit/s wavelength
- Scalable to 32x10Gbit/s designed for 4x10Gbit/s
wavelengths
15Cross border fibre
- An EU Interreg project is currenlty working on a
cross border project between Letterkenny(Republic
of Ireland) and Derry(Northern Ireland), to
provide dark fibre between the 2 towns. HEAnet
and local councils working togther. Expected
completion September 2005. - HEAnet may also avail of fibre from Dublin to
Belfast. Fibre is available today.
16Submarine fibre
- Tender to be announced shortly by Dante for dark
fibre out of Ireland as part of GN2. - 3 Telcos have privatley said they are willing to
discuss providing submarine fibre to
HEAnet/GEANT2 - Will have to wait and see.
17Fibre topolgy 05/06
18Multilayered Network
19Out-sourcing L1/L2
- All fibres are leased with a support contract.
SLA. - Layer 2 Ethernet/MPLS network currently managed
by HEAnet. - Tender started 2 weeks ago, looking for a company
to manage our fibre contracts and to manage the
layer 2 Ethernet/CWDM equipment. - Out sourcing company will provide
- P2P links to HEAnet IP Noc.
- FLEXIBILITY/Proper partner
- ability to listen to HEAnet
- provide national service (44, 24365)
- Extend and build the network
20Service/User provisioning
- Control plane, UCLP/CLI
- Working with i2Cat/Cisco on UCLP for Cisco
equipment using MPLS and Vlan Tags - Grnet IP VPN tool modified by HEAnet to configure
MPLS Layer 2 P2P circuits - Grnet tool allows EWS (Ethernet wire service) and
ERS (Ethernet relay service) circuit provisioning
21Grnet config tool
22Creating Circuits
23Viewing configs
242005 Plan
- Extend the Dublin Metro network
- Commission 3 regional networks, Galway, Limerick
and Cork - Commission the National backbone
- Cross border - Commission the Letterkenny to
Derry link - Submarine fibre possibly GN2 will avail of
international fibre
25New possibilities - 2005
- Provided first Wavelength to researchers between
2 Universities to enable tunable laser research. - Tested 10GE Xenpak (1550nm) with CWDM mux/demux
and 2.5Gbit/s wavelength at 1570nm - Enabling the possibility of further optical
research with OXC and UCLP and new control
protocols. - Possible international (submarine) fibre
connectivity to other fibre networks/testbeds