SUPPLIER EXCELLENCE ALLIANCE and - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

SUPPLIER EXCELLENCE ALLIANCE and

Description:

Rec/Insp 'PUSH' BOEING. Suppliers. S. Issues. Issues. S. S ... HITCO Source/Rec/Insp 'PULL' 'PULL' Radome. C-17 Final Assy. HITCO CARBON COMPOSITES, INC. ... – PowerPoint PPT presentation

Number of Views:249
Avg rating:3.0/5.0
Slides: 23
Provided by: HIT7
Category:

less

Transcript and Presenter's Notes

Title: SUPPLIER EXCELLENCE ALLIANCE and


1
SUPPLIER EXCELLENCE ALLIANCE and
  • HITCO Carbon Composites, Inc.
  • Gardena, California
  • Engagement 2
  • 2005
  • presented at St. Louis, Missouri, July 13, 2005

HITCO Proprietary
HITCO CARBON COMPOSITES, INC.
2
AGENDACompany OverviewSummary 2004 SEA
EngagementSummary 2005 SEA EngagementCase
Study Supply Chain Process Flow
HITCO Proprietary
HITCO CARBON COMPOSITES, INC.
3
AGENDACompany OverviewSummary 2004 SEA
EngagementSummary 2005 SEA EngagementCase
Study Supply Chain Process Flow
HITCO Proprietary
HITCO CARBON COMPOSITES, INC.
4
Briefly, who we are..
  • Founded by Harry I. Thompson in 1922
  • HITCO a California corporation in 1946
  • Acquired by SGL Carbon Group (Germany) in 1997
  • Gardena facility on 26 acres w/ 400,000 sq. ft.
    under roof
  • Core competencies in
  • Composites and assembly for large and complex
    aircraft structural components
  • Space propulsion nozzle components fabrication
    and assembly
  • Carbon/Carbon fabrication and processing
  • Low and high temperature insulation products for
    aerospace and commercial/industrial applications

5
HITCO Vision
We strive to enable our customers to realize
their objectives by providing engineered
solutions and supply chain management in
composite materials, structures and
sub-assemblies.
HITCO Values
  • We value honesty, openness and mutual respect.
  • We value everyones ideas and contributions.
  • We believe in accountability for the commitments
    we make.
  • We are committed to operate with the highest
    level of integrity
  • and to the highest ethical standards.
  • We are committed to safety and quality in all of
    our processes.

6
HITCOs organization, mission, goals and
objectives for 2005 and beyond are driven by the
following
Perform . . . on existing programs Win . . .
new programs consistent with our core
competencies and financial
metrics Grow . . . with sustainable performance
and profitability.
7
AGENDACompany OverviewSummary 2004 SEA
EngagementSummary 2005 SEA EngagementCase
Study Supply Chain Process Flow
HITCO Proprietary
HITCO CARBON COMPOSITES, INC.
8
2004 SEA Projects were focused on individual
processes . . .
Receiving Inspection Process Time 34
reduction Shipping Incomplete Shipping
Instructions 78 reduction Manufacturing
Processes Brake Machining Process Time 40
reduction Atlas V Nose Fairing Labor Hours 30
reduction Lab process time 54 reduction
9
. . .yielding significant improvements in process
flow.
10
AGENDACompany OverviewSummary 2004 SEA
EngagementSummary 2005 SEA EngagementCase
Study Supply Chain Process Flow
HITCO Proprietary
HITCO CARBON COMPOSITES, INC.
11
2005 SEA Projects are focused on integrated
business functions . . .
  • Resource Requirements Planning System
  • Visual Factory / Shop Metrics / 6S
  • Corrective Action / Useful Defects Data
  • Estimating
  • Process Flow C-17 Tailcone

12
HITCO/SEA Overall Engagement 2 Timeline
13

Case Study Supply Chain Process Flow C17
Tailcone Participants Venture Mfg. HITCO
Carbon Composites Boeing C17 Program
HITCO Proprietary
HITCO CARBON COMPOSITES, INC.
14
WAS
HITCO SUPPLIERS
PUSH
Issues
Issues
HITCO Source/Rec/Insp
HITCO Tailcone
PUSH
Issues
BOEING Suppliers
Issues
Rec/Insp
Stuff the Tailcone
Rework Fill/Fair
Tailcone Subassy
C-17 Final Assy
15
Transition . . .
Metals Kit
1
PULL
HITCO Source/Rec/Insp
HITCO Tailcone
PUSH
Issues
BOEING Suppliers
Issues
Rec/Insp
Stuff the Tailcone
Rework Fill/Fair
Tailcone Subassy
C-17 Final Assy
16
Transition . . .
Metals Kit
Stuff the Tailcone
1
PULL
HITCO Source/Rec/Insp
HITCO Tailcone Stuff
PULL
Issues
BOEING Suppliers
Issues
Rec/Insp
2
Rework Fill/Fair
Tailcone Subassy
C-17 Final Assy
17
Transition . . .
Metals Kit
Stuff the Tailcone
1
PULL
HITCO Source/Rec/Insp
HITCO Tailcone Stuff/Radome Match/Fit
PULL
Issues
BOEING Suppliers
Issues
Rec/Insp
2
3
Tailcone Subassy
C-17 Final Assy
18
Transition . . .
Metals Kit
Stuff the Tailcone
1
PULL
HITCO Source/Rec/Insp
HITCO Tailcone Stuff/Radome Match/Fit
4
2
PULL
3
C-17 Final Assy
19
Will Be
Metals Kit
Stuff the Tailcone
1
PULL
5
HITCO Tailcone Stuff/Radome Match/Fit
4
2
PULL
3
C-17 Final Assy
20
BEFORE
HITCO SUPPLIERS
PUSH
Issues
Issues
HITCO Source/Rec/Insp
HITCO Tailcone
PUSH
Issues
Issues
BOEING Suppliers
BOEING Suppliers
Issues
Issues
Rec/Insp
Stuff the Tailcone
Rework Fill/Fair
Tailcone Subassy
C-17 Final Assy
21
AFTER
Metals Kit
PULL
HITCO Tailcone Stuff/Radome Match/Fit
PULL
C-17 Final Assy
22
C-17 Tailcone Integration Metrics
  • Use of Pull Signal
  • 7 to 11 day receiving/administrative process
    reduction at Boeing
  • HITCO accuracy at matching pull signal now /- 3
    days and improving
  • Supplier Count Reduction
  • Boeing (3)
  • HITCO (3)
  • Total (6)

  • Net Process Hours Reduction of 10 at HITCO and
    improving
  • Transactional Volume Reduction at Boeing (less
    inventory, warehouse, MRP, receiving,
    transportation transactions)
  • Exact cost savings being calculated

  • Inventory Turns Improvement of 12 on this
    program at HITCO
  • Inventory Carrying Cost Reduction at Boeing
  • Exact cost savings being calculated

Write a Comment
User Comments (0)
About PowerShow.com