7000 Fafco system ((12) 4'x12' panels), $1200 rack, no other heater on pool, auto cover ... Racking and wiring solutions. Micro-inverters. Cooperative pricing ... – PowerPoint PPT presentation

Number of Views:216
Avg rating:3.0/5.0
Slides: 15
Provided by: michael1329
Category:

less

Transcript and Presenter's Notes

Title: Residential Solar Installation


1
Residential Solar Installation
  • Michael Demers

2
PV on top roof, pool solar below
480 sq ft.
3
Rack made of 2x6 P.T. headers, 2x4 rails, 1.5
galvanized posts7000 Fafco system ((12) 4x12
panels), 1200 rack, no other heater on pool,
auto cover
4
Performance
  • FSEC rating of 48,000 BTU/panel/day
  • Use pool 6 months of year.
  • 480,000 BTU/day for 182 days 87Mbtu
  • Cost of propane would be approx. 2600
  • 3.15 year payback.

5
8.2KW DC, 660 sq ft.
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
Site orientation
11
System Specifics
  • 22 degree roof pitch
  • Array direction south
  • Utility intertied, net metered, E7, no batteries
  • 8160W DC, 6250W AC, 11,00KWh annual production
  • (48) Kyocera KC 170GT Panels
  • (2) Fronius IG4000 Inverters
  • (4) 12 string module series, 288VDC
  • (12) Power Fab racks, 60 posts, 2 splice blocks,
    2 DC disconnect, 1 AC disconnect, 48 ground lugs
  • Approx. 13.5 module efficiency
  • Gross cost 59,283.89 Net after rebate
    40,333.49 (Rebate level 2.80/watt AC CEC
    rating)

12
Performance
  • Days in production 609 (1.67 years)
  • Predicted Energy generation 18,353KWh
  • Actual production 23,308KWh (27)
  • Energy value at .15.KWh 3496 (2093
    annualized, 19 year payback.

13
Residential Solar Issues
  • Relative Cost 6-7/watt after rebates
  • Unstable policy, supply chain issues affecting
    forward looking pricing
  • Complexity of cost model and payback analysis,
    long sales cycle
  • Individual nature of each install (labor cost
    sales and project mgmt)
  • Available area
  • Roof pitch
  • Orientation
  • Roofing material
  • Access/Cable routing
  • Grounding
  • Series/parallel wiring
  • Space for inverters disconnect h/w

14
Opportunities
  • Financing residential PPAs (e.g. SolarLease)
  • Racking and wiring solutions
  • Micro-inverters
  • Cooperative pricing
  • Monitoring solutions ?Case studies
  • Cleaning and maintenance solutions/services
  • Bid comparison site (e.g. LendingTree.com)
  • Cooling mechanisms
  • Integration of inverters, disconnects
Write a Comment
User Comments (0)
About PowerShow.com