Title: BE
1SPLITTER
HES
BZ
HORIZONTAL CORRECTORS
ADDITIONAL SHIELDING
BE
DIAGNOSTIC GIRDER
HORIZONTAL VERTICAL CORRECTORS
BEAM
PHOTON DUMP
HKS
PHOTON VIEWER
SUPERHARP GIRDER
HKS / HES EXP 2008 BEAM TRANSPORT ELEMENTS
2HKS / HES EXP 2008 ENGINEERING AND PHYSICS EFFORTS
1) Physics Rotate SOS
6) Support Structure for Diagnostic. Girder
9) Beam Transport to 24 Diameter Dump Tube
Support
2) Physics Remove Magnet
3) Physics Remove Rails
3) Support Structures for Beam Tube
1) BE Magnet Re-Oriented Support Structure
2) Remove 8 Diameter Pipe
8) Photon Dump Self-Contained Cooling System
7) Beam Tube to Photon Dump Supports
BEAM
5) Support Structure for BZ Magnet
4) Support Structure for Superharp Girder
3(No Transcript)
4HKS/HES EXPERIMENT ROUGH SCHEDULE
5ENGINEERING Information needed for the 7/1/08
HKS/HES Installation
- DIAMAD of all elements (including Splitter
entrance exit provided to the Alignment Group
for processing. - Beam envelop throughout transport (to Dump) to
design the transport lines. - Photon Dump Specifications to make a have vs
design decision for the dump transport line. - Radiation Specifications to develop the Shielding
design. - Radiation Specifications to design Post
Splitter-to-Dump transport line. - Horizontal Vertical Corrector field strengths
to make a have vs design decision.
- Photon Viewer Specifications to determine screen
configuration. - Entrance Exit Flange configurations of the
SPLITTER for e-beam photon beam transport
installation. - Final .dxf and/or .dwg of the HKS/HES/SPLITTER
assembly from Japan.