Develop qualification guideline based on reliability test data for reworked area array packages. ... Rework 12 CCGA 1144 I/Os and recolumn using new columns structure ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 2
Provided by: SAICODI9
Category:

less

Transcript and Presenter's Notes

Title: Reliability of Recolumned Area Array Packages FY 07- New


1
Reliability of Recolumned Area Array PackagesFY
07- New
PCK-2
Description
FY 07 Plans
  • Develop qualification guideline based on
    reliability test data for reworked area array
    packages. Schedule and cost are of significant
    concern when CCGA columns are bend/damage due to
    shipping/mishandling and use of non-compatible
    balls (e.g. lead-free balls).
  • JPL Will
  • Rework 12 CCGA 1144 I/Os and recolumn using new
    columns structure
  • Assemble these on board and document processes
  • Perform long-term solder joint reliability test
    for recolumned package assemblies until failure
    using baseline thermal cycle profile (-55/100C).
  • Analyze thermal cycle reliability and
    microstructural changes inc comparison to
    packages with virgin columns.
  • Generate guideline for package recolumning as
    well as reliability changes due to such package
    rework both internal/external to package.
  • Review literature rework procedure and plan
    rework
  • Initiate rework for one part that had already
    failed after cycling
  • Establish rework procedure, lessons learned
  • Rework other parts as become available when
    failed
  • Send to vendor for recolumning
  • Assemble recolumn package on board
  • Inspection and document quality
  • Start thermal cycling (-55/100C-first)
  • Monitor cycling at intervals and inspection
  • Document test results
  • Start guideline document

Schedule/Costs
Deliverable
  • Guideline document covering literature search
    summary for rework, inspection indicators,
    quality and reliability test data after rework

NASA and Non-NASA Organizations/Procurements
All package/PWB, and additional equipment needed
are included in the overall budget
Lead Center/PI JPL, Dr. Reza Ghaffarian
FTE 0.35