AGS Cold Snake Status and Plan - PowerPoint PPT Presentation

About This Presentation
Title:

AGS Cold Snake Status and Plan

Description:

When sine 9th vertical harmonics is in phase with snake and completely ... it was due to software error caused heater turned on while resetting RHIC snakes. ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 8
Provided by: cad53
Learn more at: https://www.c-ad.bnl.gov
Category:
Tags: ags | cold | plan | resetting | snake | status

less

Transcript and Presenter's Notes

Title: AGS Cold Snake Status and Plan


1
AGS Cold Snake Status and Plan
Haixin Huang
Apr 18, 2006
2
Sine 9th vertical harmonic scan at 36
When sine 9th vertical harmonics is in phase with
snake and completely cancelled the snakes,
polarization is zero. Larger sine 9th acts as a
partial snake to maintain polarization.


3
Sine 9th vertical harmonic scan at 36-


4
Tunes around Flattop


5
B Field Scan for Higher ?x(8.8)


6
AGS Injection Intensity Scan
7
Status and Plan
  • Use vertical scraping in the Booster and source
    polarization 80, we get polarization 60 with
    1.51011.
  • The vertical sine 9th harmonics is important to
    maintain polarization high, even in the presence
    of two partial snakes. We see strong correlation
    between the sine 9th harmonics and polarization
    at 36, even at 36-.
  • We had the first AGS cold snake quench during
    operation! It is not beam related, instead it was
    due to software error caused heater turned on
    while resetting RHIC snakes. The recover time was
    less than 4 hours. The control problem has been
    addressed.
  • Horizontal tune was raised at flattop to give
    wider flat polarization region. It will be put
    into use for RHIC soon.
  • Restore AGS back to operation. Switch to higher
    horizontal tune at flattop. Fine tune scan at 36
    and 36-. We will then move on to lower horizontal
    tune (8) setup on another AGS user.