1
Hydroelectric Licensing Regulations
Final Rule July 23, 2003 Federal Energy
Regulatory Commission Office of Energy
Projects Office of the General Counsel
2
Final Rule
  • Creates a new Integrated Licensing Process
  • Process plan Study plan 1 year
  • Studies Application development 2 years
  • Application processing 1.5 years
  • Changes Traditional Process
  • Increased public participation
  • Adds Pre-application document

3
Integrated Licensing Process
  • Improves process efficiency by requiring
  • Application preparation in conjunction with NEPA
    Scoping
  • Coordination with other participants processes
  • Increased public participation

4
Integrated Licensing Process
  • Improves process timeliness by requiring
  • Early FERC staff assistance
  • Process plan schedule
  • Early study plan development informal/formal
    dispute resolution

5
Final Rule Transition Timeline
Rule Issued 7/23/2003
Rule Effective 10/23/2003
ILP Default 7/23/2005
  • Applicant Choice
  • TLP
  • ALP
  • ILP
  • New Application Requirements
  • PAD req. for TLP ALP

6
New Application Requirements
  • New requirements for information that conforms to
    established practice
  • Minimum/maximum hydraulic capacity
  • Cost to develop license application
  • Project boundary information for both licenses
    and exemptions

7
Key Aspects of ILP
  • Pre-Application Document
  • Study Dispute Resolution
  • Preliminary Licensing Proposal in place of Draft
    License Application
  • Timing of Water Quality Certification Application
  • NEPA Cooperating Agency Policy
  • Tribal Policy Statement

8
Pre-Application Document (PAD)
  • Provide participants with available environmental
    information
  • Provide basis for
  • Issue Identification
  • Study Requests
  • NEPA Scoping Document
  • More summarized info
  • Better organization

9
Study Dispute Resolution
  • Study requestors follow study plan criteria
  • Applicant files draft study plan for comment
  • Participants meet to informally resolve
    differences
  • FERC approves study plan with any needed
    modifications

10
Study Dispute Resolution
  • Mandatory conditioning agencies may dispute
    approved study plan
  • FERC convenes advisory panel
  • FERC staff
  • Resource Agency staff
  • Third panel member
  • Applicant provides comments
  • Panel convenes technical conf.

11
Study Dispute Resolution
  • Panel makes finding as to whether study criteria
    are or are not met
  • Panel provides finding to FERC Director of Energy
    Projects
  • OEP Director makes decision on dispute with
    respect to study criteria and any applicable law
    or FERC policy

12
Preliminary Licensing Proposal
  • Alternative to Draft License Application
  • Contents include
  • Project Description
  • PME Measures
  • Environmental Analysis
  • Applicant may file Draft License Application

13
Water Quality Certification
  • WQC application filed no later than 60 days after
    FERCs Notice of Acceptance and Ready for
    Environmental Analysis

14
Cooperating Agency/ Intervenor Policy
  • NOPR proposed to change FERC policy by permitting
    intervention by federal agencies cooperating on
    NEPA
  • Keep existing policy that federal agencies must
    choose between NEPA Cooperation or intervention

15
Tribal Policy Statement
  • Commitment to Government-to-Government
    relationship with tribes
  • Recognize sovereignty of tribes Commissions
    trust responsibilities
  • Staff would initiate early discussions with
    affected Indian tribe(s) to develop consultation
    procedures
  • Establish position of Tribal Liaison