Title: CSCS Status


1
CSCS Status
  • Peter Kunszt
  • Manager Swiss Grid Initiative
  • CHIPP, 21 April, 2006

2
Status Personnel
  • Current status
  • Sysadmin by CSCS FUS group organized internally
    by FUS
  • PK as official LCG CHIPP contact
  • Hiring more people (1, maybe 2)
  • Interviews are being conducted
  • Last interview to be held on Monday next week
  • Expected start date for new person Aug 1st
    latest
  • User Support
  • Formalization of interactions within/outside CSCS
  • All outside contacts through Grid Team (PK)
  • As necessary, infrastructure items handed down to
    CSCS FUS group using the internal Request Tracker
  • CSCS Full member of the DECH federation support
  • User support through GGUS, see
    https//gus.fzk.de/pages/email_interface_info.php
  • Only for Phoenix directly through
    project-lcg-cscsgrid_at_cern.ch

3
Status Phoenix
  • Upgrades
  • Cluster has been upgraded to LCG 2.7
  • Attempted to upgrade the kernel to 2.6 failed
    due to network and storage hardware driver
    problems solution has been found but not applied
    yet
  • Upgraded to the latest 2.4 kernel
  • Extensions
  • LCG 2.7 introduced new services
  • DPM migration from our classic SE has been
    successful
  • LFC not installed yet probably next week
  • VOBoxes dedicated to each VO
  • FTS not necessary at CSCS for now, see below
  • We ordered 5 additional Dell Service nodes as a
    stop-gap solution until the end of the year
  • Dedicated VO Boxes for Atlas, CMS, LHCb possible
  • LFC node
  • Separation of UI and MON, avoiding service
    overload

4
High Bandwidth Networking - SWITCH
5
Status Networking
  • Currently 1Gb available from CSCS through SWITCH
  • 10Gb possible especially through new link via
    Domodossola/Brig
  • Current usage at 20Mb (!) so CSCS does not see
    any need to upgrade
  • Switches for 10Gb are here but not installed yet
    (no need)
  • Dedicated Links
  • Possible to have dedicated bandwidth (lambda
    lightpaths) to CERN
  • All GEANT connections are through the CERN POP
  • GEANT can also provide dedicated links to FZK,
    IN2P3, CNAF, RAL
  • Pricing unclear waiting for SWITCH personnel to
    get back from vacation
  • Need unclear suggest to run SC4 exercise first,
    see below

6
Status Service Challenge 4
  • SC4 starting!
  • Contacts to FZK established, communication very
    good
  • First tests of DPM successful single-file
    transfer rate between FZK and CSCS is about
    50MB/s
  • The channels FZK-CSCS and CSCS-FZK are now
    available on the FZK FTS server. The endpoints
    of the server are https//192.108.45.1728443/fz
    k-fts/glite-data-transfer-fts/services/FileTransfe
    rStats https//192.108.45.1728443/fzk-fts/glite-
    data-transfer-fts/services/ChannelManagement
  • 1GB/1MB files have been transferred in both
    directions ok. Thorough testing of the throughput
    starting today/next week
  • So we are one of the first Tier2s to join
  • As declared, LCG pre-service SC4 so its
    important to be part of it early.
  • Considerations
  • Bottlenecks will probably not be on the network
  • Storage bandwidth
  • Firewalls
  • Where the network traffic flows through to other
    Tier1s (even if through CERN) is irrelevant,
    importance is on
  • Scaling wrt amount of data (storage bandwidth)
  • Locality of access
  • SWITCH has a Performance Enhancement Response
    Team to diagnose network problems, see
    http//www.switch.ch/network/pert/

7
Status EGEE
  • CSCS is now official member of EGEE-II
  • All legal issues have been sorted
  • Contract has been signed
  • Well get a total of 184000 Euros for 2 years
  • Involvement
  • SA1 infrastructure running the cluster,
    participate in GGUS
  • NA3 training participate in training and
    education
  • NA4 applications support of application
    gridification
  • Mandate is not only HEP
  • NA4 involvement in Biomed, Chemistry, Earth
    sciences
  • Suggestion to extend the Phoenix cluster with
    15-20 so that the non-HEP VOs can be supported,
    funding from CSCS/EGEE

8
Status Portal
  • Installation of a P-Grade portal at CSCS almost
    complete
  • alprose01.projects.cscs.ch will run the portal,
    the installation is being done.
  • The portal will be hooked up to the LCG/EGEE
    environment for people to use/test
  • It is an interesting and potentially useful
    extension to the running services, we had
    interests expressed by other people (ETHZ, UniGE)