Enabling Intelligent Operations - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Enabling Intelligent Operations

Description:

Battery powered INTEQ downhole annular pressure sensor delivers 2 second ... Balance Dynamic Annular Pressure Control system applies back-pressure to ... – PowerPoint PPT presentation

Number of Views:63
Avg rating:3.0/5.0
Slides: 18
Provided by: jimb49
Category:

less

Transcript and Presenter's Notes

Title: Enabling Intelligent Operations


1
Enabling Intelligent Operations
  • Espen torgersen
  • NOV Drill String Telemetry
  • OG21 Oktober, 2008

2
The IntelliServ Network
  • Grant Pridecos Premium Drill Pipe and
  • High-Speed, Bi-Directional Network
  • Allows transmission from bottom of string
  • Boost and measurements along string
  • Temp Rating 302 F
  • Pressure Rating 25,000 psi
  • Speed 57,000 bps
  • NOTE Most BHA components can be converted to
    Intelligent drill string including
  • Jars, stabilizers, reamers, drill collars, some
    float valves etc.

3
The IntelliServ Network Components
Top Drive Swivel Extracts the Signal on the Rig
  • IntelliPipe
  • Conveys the Telemetry Signal

IntelliLink Boosts the Signal, Wellbore
Measurements
Interface Sub Connects to MWD Tools
4
Telemetry Connection Configuration
Standard make-up torque, any thread
compound Follow normal Grant Prideco running
procedures
5
Along String Repeater Measurement Nodes
Enables Along String services
Typical spacing 1500ft / 450M Battery life
typically 90 days
6
Service Company Tool String Interface
Provides Mechanical and Protocol
Cross-Over Single Sub Enables Visibility of all
MWD/LWD/RSS Nodes Telemetry Redundancy
IntelliServ Mud Pulse
7
Drill String Telemetry Key Applications
  • Operational Efficiency
  • Reduce non-productive and hidden lost time
  • Full telemetry redundancy
  • Risk Reduction
  • Memory images in RT Enhanced WBS management
  • Memory drilling dynamics in RT Reduce BHA
    damage
  • Automate pressure control
  • Near Future Visibility of Along String
    conditions
  • Reserve Expansion
  • Improved well placement
  • Expand potential for MPD/UBD drilling

8
Operational Efficiency ? Tool Quality Control
Limited directional response from BHA Initial
build was 1 deg/30m versus expectation of 3
deg/30m Scenario typically forces trip to inspect
downhole equipment Additional tool performance
data available via IntelliServ Enabled SLB to
confidently drill ahead At formation change
directional performance improved
Enables StatoilHydro to Avoid Trip Saves /-2
days Rig Time Saves /-1 Million
9
Risk Reduction ? Reduce BHA/Tool Damage
10
Risk Reduction ? RT WBS Management
Ream down _at_ 320 ft/hr
11
Risk Reduction ? Automate Pressure Control
  • Project Challenges
  • Low shoe strength
  • Estimated 200psi above pore pressure
  • Potentially would fail if well shut-in
  • Narrow Pore Pressure/Fracture Window
  • Prevents raising MW
  • Shallow hazard depth
  • Kick requires immediate detection control
  • Potential Risks
  • Large volume of gas at shoe and in riser
  • Shut-in pressure breaks down shoe
  • Gas seepage to seafloor
  • HSE risk to people and rig
  • Customer Decision
  • Well cannot be safely drilled with standard
    technology.
  • Project demands fully automated bottom hole
    pressure control system.

12
Risk Reduction ? Automate Pressure Control
13
Risk Reduction ? Automate Pressure Control
Fully automated system delivers lt10 second
response time Holds BHP within 30psi window while
drilling Holds BHP within 100psi window during
connections Automatically circulates kick out of
well while holding target BHP Enables successful
drilling of well
14
Risk Reduction ? ASM Pressure (Near Future)
  • Enhanced risk management via ASM pressure temp
    data
  • ECD profile improves visibility of hole cleaning
    issues
  • Monitor pressure close to shoe or known weak
    formations
  • Full visibility of pressure/temp profile during
    well control events

15
Reserve Expansion ? UBD Geosteering
Highly depleted target reservoir requires high
volume N2 injection while drilling Typical
solution slant drill reservoir with no data
telemetry Enabled solution Geosteer horizontal
through reservoir using rotary steerable
16
Technology Adoption
Customer Location Key Application Timing Servco BP
US Land Risk Reduction 2004/5/7 BHI Anadarko Cana
da Land Operational Efficiency 2005/6 BHI CNRL Can
ada Land Operational Efficiency 2006 BHI Petronas
Asia O/S Risk Reduction 2007 BHI StatoilHydro Norw
ay O/S Reserve Expansion 2007 BHI/SLB Pemex Mexico
Land Reserve Expansion 2007/8 HAL Occidental US
Land Operational Efficiency 2008 BHI Apache Austra
lia O/S Reserve Expansion 2008 HAL BP Trinidad
O/S Risk Reduction 2008 BHI BP Colombia Land Risk
Reduction 2008 SLB
Total Wells Drilled gt50 Deepest Well
Depth 20,610ft Highest Temperature 298ºF Fluid
Environments OBM, WBM, Foam, Air
17
Enabling Intelligent Operations
  • Espen Torgersen
  • NOV Drill String Telemetry
  • OG21 Oktober, 2008
Write a Comment
User Comments (0)
About PowerShow.com