Title: COSOPs'ppt
1Greater Murray Area Health Service
Energy Performance Contracting in WA NSW Case
Studies
AEPCA Seminar Perth, WA October 2003
Stephen Butt Manager, Asset Management Greater
Murray Area Health Service, NSW
2Presentation Introduction
- Brief overview of Greater Murray Area Health
Service - Quantify our energy consumption and costs
- Background to GMAHS energy initiatives and why
- Overview of EPC initiatives at WWBH/ABH GBH
- Discuss some of the items that require
consideration, risk investigation and what we
have learnt - Summary and close
- Questions
GMAHS Asset Management Support Unit
3Greater Murray Area Health Service
GMAHS Asset Management Support Unit
4Greater Murray Area Health Service
- serves 260,000 people
- approx. 3000 FTE
- 300 m operating Budget
- 29 Hospitals
- 40 Community Health Buildings
GMAHS Asset Management Support Unit
5GMAHS Energy Consumption and Costs
- Approximately 160 physically metered sites
- Total consumption of 184,037 Gj (01/02)
- Total Cost of 2.914 m for 01/02
- Major costs associated with hospitals
- 3 Base hospitals consume significant portion of
energy (60/40)
GMAHS Asset Management Support Unit
6GMAHS Energy Initiatives and WHY ?
- Initiatives
- EPCs at WWBH ABH in place for 2 years
- Current EPC at GBH nearing completion
- Energy Manager
- Small site GEEIP opportunities
- Every project (big or small) has an energy review
- Create a culture of treating every maintenance /
building action as an energy opportunity
GMAHS Asset Management Support Unit
7GMAHS Energy Initiatives and WHY ?
- Why
- GEMP
- Ailing and failing plant
- Funding opportunities
- Professional responsibilities
- It makes financial sense
- Dont loose the opportunity
GMAHS Asset Management Support Unit
8HOW MUCH DO WE NEED TO SAVE TO MEET OUR TARGETS
GMAHS Asset Management Support Unit
9GMAHS GEMP
GMAHS Asset Management Support Unit
10Case Study 1 Facility Overviews
- Wagga Wagga Base Hospital
- Large regional referral base hospital (250 beds)
- Mixture of building stock
- Floor area of 24,000 m2
- Annual Energy spend of 475,000
- Mixture of old and new, efficient and inefficient
energy plant - Mixture of regional hospital services
GMAHS Asset Management Support Unit
11Case Study 1 Facility Overviews
- Albury Base Hospital
- Large regional base hospital (150 beds)
- Relative new building stock (1994) but DC
Construction - Floor area of 18,000 m2
- Annual Energy spend of 440,000
- BMS throughout
- Typically the same energy saving issues as at
WWBH
GMAHS Asset Management Support Unit
12EPC Process
- signed EPC in late 1999 after over 2 years of
negotiations (at WWBH
ABH) - Investment approximately 0.8 m
- IRR approximately 20
- CO2 reductions of 5,820 tonnes (20 of MJ
target) - 8 year agreement
- total savings in excess of 200,000 per annum
- currently reviewing performance of all ECMs
GMAHS Asset Management Support Unit
13WW AB Hospitals Project Cost Summary
GMAHS Asset Management Support Unit
14Energy Conservation Measures Case Study 1
- Lighting (both sites) - (50 0f electricity
savings) - BMS Upgrades
- Plant re-commission and balancing (50 of gas
savings) - De-super heaters on chillers
- Space Heating control
- Water Management (flow restrictors etc)
- Power factor correction
- currently reviewing performance of all ECMs
GMAHS Asset Management Support Unit
15Case Study 2 - Griffith Base Hospital Overview
- Small regional base hospital (100 beds)
- Mixture of building stock
- Floor area of 16,000 m2
- Annual Energy spend of 280,000
- Scaled down service after centralisation of
support services - Significantly inefficient energy plant
- No major energy improvements made for 20 years
GMAHS Asset Management Support Unit
16Griffith Base Hospital Overview
- Specific Current Energy profile
GMAHS Asset Management Support Unit
17Griffith Base Hospital Cogeneration system
- To be delivered as part of a site EPC
- Small system (211 kVa) to provide base load
- Total project spend 940k
- IRR 12
- Funded from NSW Treasury loan
- EPC contract period is 7 years
- Provided best GHG reduction option (1,081 tonnes)
GMAHS Asset Management Support Unit
18Griffith Base Hospital Cogeneration system
- To provide 100 of domestic hot water load
- To provide significant of heating load
- We required 100 back up of heating services
- Have alternative diesel fired gen. set for whole
site as emergency back up (and maintenance
outages)
GMAHS Asset Management Support Unit
19Items for consideration
- Do nothing
- Capital investment requirements
- Weekend support and resource issues
- Increasing maintenance costs
- Miss matched plant
GMAHS Asset Management Support Unit
20Items for consideration
- Cogeneration
- Energy prices (sensitivity analysis)
- Gas contracts (competition)
- Engine maintenance (how much and who)
- Alternative supply during maintenance and failure
- Other ECMs and their effect on your load
- Protection issues, authority approval
- Know your alternative heat sources
GMAHS Asset Management Support Unit
21Items for consideration
- Demand charge risk for short off line experiences
- Electricity contract flexibility
- Our Particular installation
- Noise
- Fire Rating of installation
- Rural location and associated project management
- Engine maintenance
GMAHS Asset Management Support Unit
22Reduce your risk
- Through modelling worst case scenarios
- Catastrophic engine failure
- Energy price shifts
- Site characteristics changes
- Contract issues dependent on delivery method
GMAHS Asset Management Support Unit
23Griffith Base Hospital Project Cost Summary
GMAHS Asset Management Support Unit
24Specific EPC Considerations
- Operating in a Rural / Regional environment
- youre in the country now
- increased travel costs / time
- resource issues
- supervision and timetables
- difficulties in integrating into, and understand
the sites
Engineering in the Greater Murray
2003
2000
2001
2002
....
....
....
....
GMAHS Asset Management Support Unit
25Specific EPC Considerations
- Maintenance Savings
- great in theory !!
- however text book maintenance just doesnt
happen in hospitals - be careful maintenance savings arent used to
boost the IRR - ensure maintenance savings are fully explained
- in future provide the information and protocol
for life cycle costing analysis that is
realistic.
Engineering in the Greater Murray
2003
2000
2001
2002
....
....
....
....
GMAHS Asset Management Support Unit
26Specific EPC Considerations
- Deferred Capital Investment
- great in theory !!
- do we all have TAM fully implemented ??
- Do we value our assets in a financial context,
similar to private industry ?? - Specify how you want these issues handles. In
some cases they are better excluded - be mindful of the tender analysis process that
is still to come
Engineering in the Greater Murray
2003
2000
2001
2002
....
....
....
....
GMAHS Asset Management Support Unit
27Specific EPC Considerations
- Maintenance Procedures
- keep your options open
- be clear on what you want to achieve
- remember the long term nature of these contracts
- search for further benefits such as contract
consolidation, coverage of extra equipment,
training opportunities for staff, total business
approach - beware of hidden costs and agendas
Engineering in the Greater Murray
2003
2000
2001
2002
....
....
....
....
GMAHS Asset Management Support Unit
28Specific EPC Considerations
- Design standards and plant redundancy
- EPCs dont follow typical building / plant
procurement processes - ensure your requirements are clear and fully
explained - beware of proprietary systems and inter company
relationships - ensure you have a fall back position (i.e.
redundancy)
Engineering in the Greater Murray
2003
2000
2001
2002
....
....
....
....
GMAHS Asset Management Support Unit
29Specific EPC Considerations
- Data, data, data . !
- Dont ever think you have enough data already to
run an EPC - you need to understand every single function of
your sites energy use and its possible influences - ensure consistency of message and documentation
- get it correct the first time otherwise you may
pay in the long run
Engineering in the Greater Murray
2003
2000
2001
2002
....
....
....
....
GMAHS Asset Management Support Unit
30Specific EPC Considerations
- Baselines
- keep them simple
- some variables will be out of your engineering
control - engage the facility executive staff, and hope
they understand - think energy impact in all your decisions
Engineering in the Greater Murray
2003
2000
2001
2002
....
....
....
....
GMAHS Asset Management Support Unit
31Specific EPC Considerations
- Internal Rate of Return (IRR)
- beware of the bottom line
- dont miss out on the potential for maximising
capital investment - contractors need to be briefed correctly
- weight your evaluation criteria carefully
Engineering in the Greater Murray
2003
2000
2001
2002
....
....
....
....
GMAHS Asset Management Support Unit
32Specific EPC Considerations
- Implementation timetables
- Year 0 issues
- building industry programming/ performance
relevance - slow implementation means lost opportunities
which should be compensated - the client is the one who has most to lose !!
Engineering in the Greater Murray
2003
2000
2001
2002
....
....
....
....
GMAHS Asset Management Support Unit
33Further Benefits
- sharing the benefits to other sites
- standardisation
- become your own energy performance contractor at
sites that warrant them - use the EPC process and outcomes as a catalyst
for change, particularly for Engineering staff.
Engineering in the Greater Murray
2003
2000
2001
2002
....
....
....
....
GMAHS Asset Management Support Unit
34Summary
- We have lived through the development of EPCs
and survived, and are soon to prosper. - Its horses for courses and choose your projects
and funding models wisely. - Dont expect that the EPC Company will come in
and do it all for you, be prepared for a lot of
work and get your data organised which will help
with returns. - These are long term undertakings and be prepared
to wait - Good understanding of your site, its loads and
consumptions will ensure business confidence in
your choice.
GMAHS Asset Management Support Unit
35 Questions ?
NSW Case Studies
AEPCA Seminar October 2003
Stephen Butt Manager, Asset Management Greater
Murray Area Health Service, NSW