Snowmass T9 Diagnostics Group Summary - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Snowmass T9 Diagnostics Group Summary

Description:

Beam parameter lists orders of magnitude more demanding than current machines ... Most $ and resources relegated to magnets, structures, RF, ... – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 8
Provided by: snow2
Category:

less

Transcript and Presenter's Notes

Title: Snowmass T9 Diagnostics Group Summary


1
Ralph Pasquinelli Fermilab Marc Ross SLAC
2
  • Charge of surveying RD requirements for new
    machines
  • Machines surveyed
  • ee- colliders
  • Muon Neutrino Source
  • NLC
  • Proton Driver
  • TESLA
  • VLHC

3
  • Common diagnostic requirements
  • Beam parameter lists orders of magnitude more
    demanding than current machines
  • Kilometers of beam lines to monitor
  • Beam energies capable of vaporizing hardware
  • Personnel, environment, and hardware protection

4
  • Reliability
  • Thousands of channels to monitor and control
  • NASA style quality engineering?
  • Severe consequences to beam losses
  • Can HEP assign to high reliability

5
  • Diagnostic Installation
  • Radiation environments are similar in all
    machines
  • Machine designs do not put diagnostics at the
    forefront of RD
  • Complexity, should implement KISS
  • Data collection, feedback loops, bandwidth

6
  • Commissioning
  • Need plans up front
  • Dynamic Range issues

7
  • Focus of RD
  • Most and resources relegated to magnets,
    structures, RF,
  • Diagnostics should receive stronger support up
    front
  • Time saved in commissioning and operations is
  • Abandon the cowboy approach to commissioning
  • Prototyping and cooperation
Write a Comment
User Comments (0)
About PowerShow.com