Title: Validation and Verification of CDM Projects


1
Validation and Verification of CDM Projects
  • Climate Change Kiosk on CDM/DNA, COP9
  • December 6, 2003
  • Marco van der Linden
  • SGS Climate Change Programme

2
Contents of presentation
  • Introduction to DOEs
  • Brief introduction to SGS
  • Input of DOE in the CDM project cycle
  • Validation of CDM projects
  • Monitoring Plan
  • Verification of CDM Projects
  • Final remarks
  • More information and contact details

3
Introduction to DOEs
  • Kyoto Protocol requires an independent third
    party to be involved in CDM project cycle
  • Independent party is referred to as a Designated
    Operational Entity (DOE)
  • DOE is legal entity with two basic functions
  • Validation and subsequently request for
    registration of a proposed CDM project activity
  • Verification and certification of the emission
    reductions of a registered CDM project activity
  • Core task of a DOE is to protect the
    environmental integrity of the CDM and facilitate
    the trade in emission reductions by providing
    confidence

4
Brief introduction to SGS
  • SGS is the worlds largest inspection,
    verification and testing company, providing
    services in over 140 countries world-wide
  • In house expertise metering, calibration,
    laboratories, industrial inspection,
    environmental impact assessments, air and water
    quality, land contamination, ISO 14001
    certification, EMAS Verification..
  • SGS Climate Change Programme
  • Started in 1997 with sinks projects, since
    then, expanded into all GHG sectors / all gases
  • Validated more than 30 potential JI and CDM
    projects (preliminary) verification of around 10
    potential CDM and voluntary projects

5
Input of DOE in the CDM project cycle
Project idea
Project Developer
Write Project Design Document
DOE
Validation / registration
Project Developer
Implementation/ Monitoring
DOE
Verification / certification
CER
6
Validation of CDM projects
  • Projects are required to use a methodology that
    is approved by the CDM Executive Board to
    establish the project baseline, additionality and
    monitoring methodology
  • The purpose of a validation is to have the DOE
    assess the project design, in particular the use
    of the approved methodology and the projects
    compliance against the requirements of the
    Marrakech Accords and the host party
  • Main criteria are
  • Completeness of documentation
  • Host country acceptance and host country
    eligibility
  • Applicability and correct use of the approved
    methodology
  • The project reduces emissions below those in
    absence of the project
  • Environmental and social performance
  • Development of an effective monitoring plan
  • National and international stakeholder
    consultation

7
Monitoring Plan
  • During implementation of the project, the project
    manager will have to monitor the GHG emissions
  • Monitoring plan must show how the data are going
    to be collected
  • During validation
  • The parameters used to predict the emissions will
    be cross-checked against the monitoring plan to
    ensure that those parameters which have a very
    strong influence on the reported results will be
    collected with the highest accuracy.
  • The assessment team will be particularly
    interested to see how data will be collected and
    how quality of data will be assured.
  • The monitoring plan must also cover environmental
    and social impacts as required by any Social /
    Environmental Impact Assessment and any other
    regulatory requirements

8
Monitoring Plan (cont)
  • During project implementation
  • The project managers must collect data exactly as
    specified in the monitoring plan
  • The Verifier will verify that the Monitoring Plan
    has been implemented as specified in the
    validated Project Design Document
  • Changes to the Monitoring Plan need to be
    approved by a Validating Operational Entity

9
Verification of CDM projects
  • Verification is the periodic independent review
    of the monitored project emissions during the
    implementation period
  • By comparing these with the baseline emissions,
    it results in an opinion of the number of
    emission reductions
  • The Verifier certifies in writing the number of
    avoided emissions and submits a Certification
    Report.
  • At this stage a high level of certainty is
    required

10
Final remarks
  • DOE has to be independent of the project, this
    means they can not consult on the development of
    the project or the writing of the project design
    document
  • Except for small scale projects, the DOE
    performing the validation must be different from
    the DOE performing the verification in order to
    ensure there is no conflict of interest

11
More information and contact details
  • UNFCCC website
  • CDM project cycle http//cdm.unfccc.int/pac/howt
    o
  • Role of DOE http//cdm.unfccc.int/DOE/
  • Contact details SGS
  • Marco van der Linden
  • Tel 31 (0)181 693293
  • Email Marco.van.der.linden_at_sgs.com
  • Corporate Website www.sgs.com/climatechange