Title: Operational Readiness Review
1Readiness ReviewCourse
ORR Team Leader Detailed Responsibilities Mod 6
2Learning Objectives
- Describe the ORR Team Leaders detailed
activities and considerations associated with
planning and conducting an ORR/RA including
Authorization Authority Plan of Action Event
Dates Draft Implementation Plan Team Selection
Criteria Team Level of Experience Team
Qualification Requirements
Logistics/Planning Management of the
Team Interfaces - Oversight Entities -
Startup Authority - Facility
Contractor Necessary Briefings/Meetings ORR Final
Report
3Readiness Review Process
6 Months Prior to RR
1 Year Prior to RR
4Team Leader Roles and Responsibilities
- Reference DOE-HBK-3012-2003 for specific details
on Team Leaders Roles and Responsibilities - Assemble team,
- Begin developing implementation plan,
- Logistics - required room, equipment, security,
training, - Assemble document request,
- Arrange briefings,
- Arrange tours.
5Team Selection Criteria
- Team Members and size of Team derived from the
POA Breadth and Scope - Selected by the Team Leader
- DOE O 425.1C Requirements
- Technical competence
- Assessment experience/training
- Independence in the Review area.
- Sample Forms Available
- Standard (3006-00) and DOE/NNSA Web Pages.
- Other Qualities
- Writing skills
- Team player
- Big Picture . . .
6Plan of Action
- Is your writing guide used to develop your
Implementation Plan - Names you as the Team Leader
- Defines the Breadth and Scope of the RR
- Defines prerequisites
- Provides a proposed start date
- Used to Identify Team Members and Functional
Areas to Review - Approved by DOE/NNSA Authorization Authority for
both CORR/CRA and DOE/NSA ORR/RA.
7Team Member Selection, Typical Functional Areas
- Engineering Support
- Fire Protection
- Occupational Safety (IH/IS)
- Management
- Configuration Management
- Procedures
- Radiation Protection
- Procedures
- Level of Knowledge
-
- Operations
- Safety Envelope
- DOE Organization
- Training and Qualification
- Quality Assurance
- Software Quality Assurance
- Criticality Safety
- Environmental Protection and Waste Management
13
8Implementation Plan
- Your responsibility . . . You draft it and
approve it! - You and the team prepare it
- You resolve/consider comments with oversight
organizations (internal, external) - What do you commit to do, to answer the question
- are the criteria within the POA scope met?
9Team Leader Briefings and Meetings
- Daily Team Meeting
- Shares information, contractor, DOE/NNSA . . .
- Team Synergy.
- Closeout Briefing
- Key Issues - Pre-Start Findings
- Startup Recommendation
- Finding Closure Recommendation.
- Follow-up As Required
10Managing the Interfaces
- Interfaces
- Oversight Entities (DNFSB, EH)
- Authorization Authority
- Local DOE/NNSA Points of Contact
- Facility Contractor
- Good Practices
- Full Access - Best Practice
- No Secrets, be Open!
- Must be Fully Informed Brief periodically
- Initiate the Communication
11Authorization Authority
- AA is your Boss
- Final Readiness Review report is for his/her
decision - Line decision maker for scope changes.
- Close Interface
- Regular briefings during review
- Immediate notification of major issues
- Formally direct you to commence the Readiness
Review - For CORR/CRA, a Senior Line Manager will fill
this role.
12ORR Final ReportKeys to Success
- Your Product!
- Suggested Format in Standard/website
- Select and provide an example to Team.
- Unclassified preferred as required . . .
- Key Elements (Order Requirements)
- Order Compliance as per POA
- Lessons Learned
- ISMS Statement
- Your Recommendation
- Addressed to Authorization/Startup Authority.
13ORR Final ReportKeys to success
- Plan to complete before team leaves site . . .
- Define Timeline and expectations to team early .
. . - Provide example formats early-forms Summary . .
. - Develop the report skeleton and background early
. . . - Arrange for Admin support to edit, format,
collate . . . - Push daily input to individual forms . . .
- Emphasize timely factual accuracy . . .
- Describe the review/approval process to the team
. . . - Continuous classification review of product . . .
14Team Leader (TL) Lesson Learned
- TL not qualified Selection criteria guidance
not detailed enough (e.g., independence,
experience) - TL not assigned soon enough (POA timely
approval) - TL does not communicate expectations to team with
enough lead time - TL does not communicate drill/evolution
expectations to facility - Site access for team not gained ahead of time
- Logistic needs not communicated to site with
enough lead time - TL does not tailor CRADs based on Pre-Visit or
Team not at Pre-Visit, or no Pre-Visit) - CRAD assigned to TL .
15If the Review Results are not Successful
- Significant team decision. Facts must support
- Sleep on it Confront team to defend conclusion.
- Discuss situation and options with Authorization
Authority (Senior Contractor Management). - Two Options
- Suspend the Review. Interim Report including
what was done and areas not done. - Final report for completed Functional Areas (FA)
- High level discussion and findings for incomplete
FAs. - Terminate the Review. Report results with basis
for repeat of entire ORR/RA.
16Final Thoughts
- Be Flexible with Start Date!
- You work for the AA
- IP is yours and the teams
- Be Alert to Recommend Pre-Event Activities
- Emergency Preparedness (EP) Drills
- Integrated Equipment Tests.
- Critical Team Interface Issue . . .
- You Must be Proactive . . .
17Questions
18Readiness ReviewCourse
ORR Team Leader Detailed Responsibilities Mod 6
19Learning Objectives
- Describe the ORR Team Leaders detailed
activities and considerations associated with
planning and conducting an ORR/RA including
Authorization Authority Plan of Action Event
Dates Draft Implementation Plan Team Selection
Criteria Team Level of Experience Team
Qualification Requirements
Logistics/Planning Management of the
Team Interfaces - Oversight Entities -
Startup Authority - Facility
Contractor Necessary Briefings/Meetings ORR Final
Report
20Readiness Review Process
6 Months Prior to RR
1 Year Prior to RR
21Team Leader Roles and Responsibilities
- Reference DOE-HBK-3012-2003 for specific details
on Team Leaders Roles and Responsibilities - Assemble team,
- Begin developing implementation plan,
- Logistics - required room, equipment, security,
training, - Assemble document request,
- Arrange briefings,
- Arrange tours.
22Team Selection Criteria
- Team Members and size of Team derived from the
POA Breadth and Scope - Selected by the Team Leader
- DOE O 425.1C Requirements
- Technical competence
- Assessment experience/training
- Independence in the Review area.
- Sample Forms Available
- Standard (3006-00) and DOE/NNSA Web Pages.
- Other Qualities
- Writing skills
- Team player
- Big Picture . . .
23Plan of Action
- Is your writing guide used to develop your
Implementation Plan - Names you as the Team Leader
- Defines the Breadth and Scope of the RR
- Defines prerequisites
- Provides a proposed start date
- Used to Identify Team Members and Functional
Areas to Review - Approved by DOE/NNSA Authorization Authority for
both CORR/CRA and DOE/NSA ORR/RA.
24Team Member Selection, Typical Functional Areas
- Engineering Support
- Fire Protection
- Occupational Safety (IH/IS)
- Management
- Configuration Management
- Procedures
- Radiation Protection
- Procedures
- Level of Knowledge
-
- Operations
- Safety Envelope
- DOE Organization
- Training and Qualification
- Quality Assurance
- Software Quality Assurance
- Criticality Safety
- Environmental Protection and Waste Management
13
25Implementation Plan
- Your responsibility . . . You draft it and
approve it! - You and the team prepare it
- You resolve/consider comments with oversight
organizations (internal, external) - What do you commit to do, to answer the question
- are the criteria within the POA scope met?
26Team Leader Briefings and Meetings
- Daily Team Meeting
- Shares information, contractor, DOE/NNSA . . .
- Team Synergy.
- Closeout Briefing
- Key Issues - Pre-Start Findings
- Startup Recommendation
- Finding Closure Recommendation.
- Follow-up As Required
27Managing the Interfaces
- Interfaces
- Oversight Entities (DNFSB, EH)
- Authorization Authority
- Local DOE/NNSA Points of Contact
- Facility Contractor
- Good Practices
- Full Access - Best Practice
- No Secrets, be Open!
- Must be Fully Informed Brief periodically
- Initiate the Communication
28Authorization Authority
- AA is your Boss
- Final Readiness Review report is for his/her
decision - Line decision maker for scope changes.
- Close Interface
- Regular briefings during review
- Immediate notification of major issues
- Formally direct you to commence the Readiness
Review - For CORR/CRA, a Senior Line Manager will fill
this role.
29ORR Final ReportKeys to Success
- Your Product!
- Suggested Format in Standard/website
- Select and provide an example to Team.
- Unclassified preferred as required . . .
- Key Elements (Order Requirements)
- Order Compliance as per POA
- Lessons Learned
- ISMS Statement
- Your Recommendation
- Addressed to Authorization/Startup Authority.
30ORR Final ReportKeys to success
- Plan to complete before team leaves site . . .
- Define Timeline and expectations to team early .
. . - Provide example formats early-forms Summary . .
. - Develop the report skeleton and background early
. . . - Arrange for Admin support to edit, format,
collate . . . - Push daily input to individual forms . . .
- Emphasize timely factual accuracy . . .
- Describe the review/approval process to the team
. . . - Continuous classification review of product . . .
31Team Leader (TL) Lesson Learned
- TL not qualified Selection criteria guidance
not detailed enough (e.g., independence,
experience) - TL not assigned soon enough (POA timely
approval) - TL does not communicate expectations to team with
enough lead time - TL does not communicate drill/evolution
expectations to facility - Site access for team not gained ahead of time
- Logistic needs not communicated to site with
enough lead time - TL does not tailor CRADs based on Pre-Visit or
Team not at Pre-Visit, or no Pre-Visit) - CRAD assigned to TL .
32If the Review Results are not Successful
- Significant team decision. Facts must support
- Sleep on it Confront team to defend conclusion.
- Discuss situation and options with Authorization
Authority (Senior Contractor Management). - Two Options
- Suspend the Review. Interim Report including
what was done and areas not done. - Final report for completed Functional Areas (FA)
- High level discussion and findings for incomplete
FAs. - Terminate the Review. Report results with basis
for repeat of entire ORR/RA.
33Final Thoughts
- Be Flexible with Start Date!
- You work for the AA
- IP is yours and the teams
- Be Alert to Recommend Pre-Event Activities
- Emergency Preparedness (EP) Drills
- Integrated Equipment Tests.
- Critical Team Interface Issue . . .
- You Must be Proactive . . .
34Questions