INTC Agenda - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

INTC Agenda

Description:

IH-7gap. MINIBALL. second beam line. Mats Lindroos. ISOLDE upgrade group ... for the upgrade of the ISOLDE facility including the physics case (yellow report) ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 10
Provided by: MatsALi2
Category:
Tags: intc | agenda | case | ih

less

Transcript and Presenter's Notes

Title: INTC Agenda


1
INTC Agenda
  • 0900 Introduction by the Chairman, J. Äystö
  • 0905 Report by the ISOLDE Technical
    Coordinator, M. Lindroos
  • 0925 Report by the ISOLDE Scientific
    Coordinator, T. Nilsson
  • 0940 Status Report of the IS413 ISOLTRAP
    Experiment, K.Blaum
  • 1010 2003 experimental campaign at n_TOF
    Report, A. Mengoni
  • 1100 Studies of electric dipole moments in the
    octupole collective regions of heavy Radiums and
    Bariums, H.Mach
  • 1120 Inelastic branch of the stellar reaction
    14O(a,p)17F, P.J.Woods

2
Scientific report and nTOF
  • The ISOLDE Scientific Coordinator, Thomas
    Nilsson
  • overview of the 2003 operation
  • The renovated HRS front-end gives opportunity to
    operate the facility in push-pull mode for the
    last 1.5 months of the 2003 operational period.
  • Planned upgrade of REX-ISOLDE to 3.1 MeV/u
    unlikely in 2003.
  • The 2003 experiment campaign at nTOF, Alberto
    Mengoni
  • Capture measurements had been performed for a
    large number of targets until September
  • Fission measurements in progress.
  • The plans for 2004 is to install a 4p-calorimeter
    for further measurements on actinides, pending
    the acceptance of a proposal to be submitted to
    the following meeting.
  • Claude Detraz reiterated that the nTOF
    collaboration should consider its future plans,
    in conjunction with enlarging the user basis.
  • Future of nTOF single experiments or large
    collaboration (as ISOLDE)?

3
Technical report
  • Buildings
  • Extension building 170
  • Ready January 2005
  • Class A lab, building 179
  • Ready autumn 2004
  • Solid state physics laboratory
  • Part of building 170 extension
  • Beam transport at ISOLDE
  • Beam delivered up to experiments efficiency
    gain!
  • HRS front-end
  • Installed and operational!
  • REX integration
  • Selection boards under preparation (2 done!)
  • Future EURISOL study
  • Bid from ISOLDE AB and EP to participate
  • Leading role for target and ion source
    development
  • Post accelerator, charge breeding and
    mass-separators
  • Full beta-beam study integral part of EURISOL
  • ISOLDE shutdown

4
Closed meeting INTC
  • New members Tilman Butz, Hubert Doubre, Mark
    Huyse, Dieter Hilscher and Francesco Priolo
  • Reports, the Committee expressed its
    satisfaction (nTOF and ISOLDE)
  • Integrated proton flux delivered to nTOF during
    2003 according to expectations
  • K. Langanke informed that the astrophysics
    community now is becoming increasingly aware of
    the existence and capabilities of the nTOF
    facility
  • Approved 29 new shifts, approved 24 pending
    shifts
  • Letters of intent
  • Mercury target test for neutron spallation
    sources
  • Encouraged full proposal BUT outside normal
    ISOLDE schedule
  • AB division asked to investigate scheduling in
    the 2004-2006 period and calculate the cost for 2
    months
  • RFQ cooler for atomic physics
  • Strongly encouraged to submit full proposal
  • UK grant application in progress to finance RFQ
    cooler

5
ISOLDE Collaboration Committee
  • 1. Introductory remarks by the chairman, B.
    Jonson
  • 2. Approval of minutes of the last meeting, B.
    Jonson
  • 3. News from the AB Division, M. Lindroos
  • 4. Schedule, T. Nilsson
  • 5. INTC matters, J. Äystö
  • 6. Status of REX-ISOLDE integration with CERN,
    and MoU, M. Lindroos
  • 7. Status of RILIS, V. Fedosseev
  • 8. Status of Hall Extension and Class A
    laboratory, M. Lindroos
  • 9. Status of REX, P. Butler
  • 10. Status of 6th Framework Proposals proposal,
    B. Jonson/ P. Butler
  • 11. Selection of new physics coordinator, B.
    Jonson
  • 12. ISCC Membership terms, B. Jonson
  • 13. Broadcast of ISCC minutes on ISOLDE web page,
    J. Weterings
  • 14. New CERN management structure and
    implications for ISOLDE, P. Butler
  • 15. A.O.B

6
ISOLDE collaboration
  • Budget dedicated to hall extension and REX-ISOLDE
    integration
  • Small provisions for User support and
    administration
  • Decision on applying for external grants to
    replace the RILIS system with a solid state laser
    system (up to 2006 in stages)
  • Important savings for RILIS operation
  • EU decision on EURONS proposal postponed to next
    year (2nd call of I3 but with preserved
    priorities from 1st call)
  • Consequences for budgeting of hall extension and
    REX integration
  • Selection procedure for ISOLDE physics
    coordinator started
  • Decision for Friday 10 October

7
ISOLDE upgrade group
  • 1. Minutes of last meeting
  • 2. Report from ISCC on REX integration and hall
    extension (B Jonson)
  • 3. REX-ISOLDE upgrade (report on meeting 27.6)
    (O Kester)
  • 4. REX-STAR (M Lindroos)
  • 5. Proton beam availability to 2010 (R Garoby
    HIP, HIPPI T Nilsson)
  • 6. Implications of beam intensity upgrade
    targets (J Lettry manpower
  • resources)
  • 7. Implications of beam intensity upgrade
    radiation safety (T Otto manpower resources)
  • 8. Status of SPL (R Garoby)
  • 9. Status of EURISOL design study (P Butler)
  • 10. AOB

8
ISOLDE upgrade group
  • REX upgrade
  • Design work on 4.3 MeV/u upgrade amplifiers to be
    launched towards the end of the year with
    Bertronics

9
ISOLDE upgrade group
  • REX-star
  • Low energy facility (below 300 keV/u) for solid
    state physics and astrophysics
  • Plans of consultant (Heinz Haas) to be presented
    in December 2003
  • Targets, intensity upgrades
  • RD in progress, lacks 1.5 FTE and 500 Kchf for
    10 microampere study
  • Radiation protection
  • New limits for planned interventions, 6 mSV,
    creates problems!
  • Optimization of shielding and increased
    reliability fundamental for an upgrade
  • AOB
  • Technical Design Report to be prepared for the
    upgrade of the ISOLDE facility including the
    physics case (yellow report)
  • Conge meeting!
Write a Comment
User Comments (0)
About PowerShow.com