Energistics PRODML Workgroup 07 Daily Volume Reporting Pilot Project - PowerPoint PPT Presentation

1 / 3
About This Presentation
Title:

Energistics PRODML Workgroup 07 Daily Volume Reporting Pilot Project

Description:

Energistics PRODML Workgroup 07. Daily Volume Reporting Pilot Project. ConocoPhillips ... ConocoPhillips Daily Volume Reporting PRODML Pilot Problem Statement ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 4
Provided by: roxane
Category:

less

Transcript and Presenter's Notes

Title: Energistics PRODML Workgroup 07 Daily Volume Reporting Pilot Project


1
Energistics PRODML Workgroup 07Daily Volume
Reporting Pilot Project
2
ConocoPhillips Daily Volume Reporting PRODML
Pilot Team
  • ConocoPhillips
  • Don Van Speybroeck, Pilot Lead
  • Jose Rivas, Reporting Lead
  • Thomas Vanya, Test Environment Lead
  • AspenTech
  • Chris Hewitt, Technical Lead
  • Norbert Meierhoefer, Functional Lead
  • Kongsberg
  • Per Arild Andresen, PhD, Technical Lead
  • P2 Energy Solutions
  • Kiran Vajrala, Technical Lead
  • Dave Johnson, Functional Lead
  • Iain Saunderson, Test Environment Lead

3
ConocoPhillips Daily Volume Reporting PRODML
Pilot Problem Statement
  • Rebuilding and remapping software application
    interfaces to produce daily production reports
    should not be so complicated.
  • Software applications and database systems in the
    Upstream Production environment have different
    data requirements for collection, analysis, and
    reporting functions.
  • The systems data flow and analysis requirements
    change in size and functionality as the assets
    grow and evolve.
  •  
  • Continuous data mapping and custom interface
    development efforts between applications and
    systems can be eliminated through the adoption of
    industry standard network and volume models
    defined in PRODML.
Write a Comment
User Comments (0)
About PowerShow.com