The AGILE Mission 415 days ahead of GLAST - PowerPoint PPT Presentation

About This Presentation
Title:

The AGILE Mission 415 days ahead of GLAST

Description:

'415 days ahead of GLAST' Dr. Luca Salotti Mission Director. The ... Rheinmetall Italia S.p.A.. Subco. Thales Alenia Space Italia S.p.A.. Telespazio S.p.A. ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 12
Provided by: salo2
Category:
Tags: agile | glast | ahead | days | italia | mission

less

Transcript and Presenter's Notes

Title: The AGILE Mission 415 days ahead of GLAST


1
The AGILE Mission415 days ahead of GLAST
Dr. Luca Salotti Mission Director
2
Malindi Fucino ASDC PI Team - Guest
Guest
Fucino SCC/MCC/FDS
ASDC/ESRIN
PI Team
Industry - RTI
Orbcom
Intelsat
MLD-2 Ground Station
3
AGILE in ASI
OSU Observation of the Universe S. Di
Pippo/E. Flamini SMI Small Mission F.
Viola TST Ground Segment R. Ibba
4
AGILE Industry - RTITemporary Consortium
Carlo Gavazzi Space S.p.A. Rheinmetall Italia
S.p.A. Subco Thales Alenia Space Italia
S.p.A. Telespazio S.p.A.
Prime Contractor All inclusive, S/C design,
building assembling, P/L assembling, test,
launch, operation, data delivery to the ASDC,
disposal
5
The Ground Station
  • N. Passes on the Ground Station MLD-2 5583
    (23/05/2008)
  • N. Passes perturbed or lost 34 (14 due to
    station problems)
  • 1 438 Total 24.05.07 SAC off
  • 2 736 Total 14.06.07 Antenna Elevation Brake
  • 3 790 Total 18.06.07 Antenna Elevation Manual
    System
  • 4 1625 Total 16.08.07 Program Track not
    working
  • 5 1634 Total 17.08.07 SAC off
  • 6 2728 Total 02.11.07 Fuse on SCR AZ2 F1
  • 7 2729 Total 02.11.07 Fuse on SCR AZ2 F1
  • 8 2969 Total 19.11.07 Fuse on SCR AZ2 F2
  • 9 3015 Total 23.11.07 Fuse on SCR AZ2 F2
  • 10 3372 Total 18.12.07 Wrong TLE ( Spot2 test)
  • 11 4005 Total 01.02.08 Azimut2 SCR Fuse
  • 12 4006 Total 01.02.08 Azimut2 SCR Fuse
  • 13 5409 Total 05.05.08 CMCS MLD-2
  • 14 5460 Total 19.05.08 LAN MLD-2

6
The Orbit
  • NORAD 31135 A
  • ID 013/07
  • SEPARATION 23 04 2007 10 Hrs 22 Min 50.593 Sec
    (UT)
  • EPOCH 3062.999469 2008/05/20
    235914.163
  • STATE VECTOR J2000 REF SYST
    ELEMENTS
  • -------------------------------------------
    -------
  • INCLINATION 2.45
  • PERIGEE RADIUS 6916.31580056 KM
  • APOGEE RADIUS 6927.0823720 KM
  • PERIGEE HEIGHT 538.17931056 KM
  • APOGEE HEIGHT 548.94474720 KM
  • A/M 0,006 sqm/kg Hlt500 km 20/2014

7
What we have done
  • 23 April 2007 Launch
  • 23 July 2007 End of the Commissioning SCRB
  • August October 2007 Science Verification Phase
  • November 2007 ? Commissioning
  • 1 December 2007 Start of the 1 Cycle Observong
    Time (one year)
  • 19 December 2007 OVR1
  • OBH SW 2.07
  • PDHU SW V3R3 Patches
  • TLC 110000
  • TLM 65 GB
  • LTP 30
  • TOO 8 Trimmings
  • NCR 159 whose 18 in orbit
  • NCR open 13 (in orbit)

8
What is still missing what is wrong !
  • Test HW Burst Trigger MCAL (will do next week !!
    - ? ? Commissioning)
  • New SW PDHU
  • NCR 143
  • AC TOP Temperature
  • NCR 150
  • PDHU Hang-up and install of AC SAFE mode
  • NCR 152
  • TMTC OBH-A Hang-up
  • In orbit reset of OBH-A 01/01/08
  • NCR 154
  • OBH-A math processor instability
  • We are ready to activate OBH-B in case of
    progressive degradation
  • NCR 161
  • PDHU TC task hang-up

9
MLD-2
10
MLD-1
11
Welcome in orbit GLAST !!
  • The official GLAST liftoff time was 11/06/08
    120500.521 p.m. EDT (1605 GMT).
  • The 333rd Delta rocket launch since 1960
  • The 2nd to fly this year
  • The 136th Delta 2 rocket mission since 1989
  • The 5th Heavy version of the Delta 2
  • 301 nautical mile (558 Km) circular orbit
    inclined 25.6 degrees
  • GLAST M690 vs. AGILE M 55