Title: London Road Transportation Study


1
London Road Transportation Study
  • Finding a Balance
  • Public Meeting 2
  • November 27, 2006

2
London Road Website
  • www.dot.state.mn.us/d1/projects/londonroad/index.h
    tml
  • You can Email your comments to
  • todd.campbell_at_dot.state.mn.us
  • cpedersen_at_ci.duluth.mn.us
  • ssannes_at_sehinc.com

3
Overview
  • Progress Since Public Meeting 1
  • Input from Public Meeting
  • Context Sensitive Solutions
  • Potential Solutions
  • Your Comments

4
Study Objective
  • Determine what short and long term changes should
    be made to London Road and Superior Street to
    relieve congestion through East Duluth

5
Study Limits
6
Progress of Public Advisory Committee
  • Input from Public Meeting 1
  • Rail grade
  • Martin Road bypass and/or truck restrictions
  • History of the interstate decision
  • Context Sensitive Solutions
  • Potential Solutions
  • Your Comments

7
Input from Public Meeting 1
  • Railroad grade
  • Rail Authority will allow a road
  • Rail must remain in operation
  • No ability to condemn an active rail line

8
Input from Public Meeting 1
  • Martin road bypass and/or truck restrictions
  • Significant committee discussion
  • Study completed by MIC
  • No significant benefit to London Road
  • Will not remove trucks destined for downtown/west
    Duluth or Wisconsin

9
Input from Public Meeting 1
  • History of the Interstate Extension
  • Public committees analyzed various solutions
  • Planned end point varied from 10th Avenue East to
    66th Avenue East
  • Final decision to end at 26th Ave East was
    determined by a city-wide referendum

10
Context Sensitive Solutions
  • Integral part of the process - considers that
    London Road is a residential neighborhood with
    boulevards, trees, parking, pedestrians/bikes,
    and historic homes
  • Need to meeting competing needs safe and
    efficient travel to, and through the Lakeside
  • Balancing the pros and cons of each alternative
  • How to assign the space in the road corridor?
  • More information is available on the website

11
(No Transcript)
12
Potential Solutions
  • Alternative 1 (Expressway)
  • Alternative 2 (One-Way Pair)
  • Alternative 3 (Parkway)
  • Alternative 4 (Parking Lane Conversion)
  • Other Solutions

13
Alternative 1 (Expressway)
  • Traffic Operations Shifts traffic from London
    Road and Superior Street
  • Construction Most costly alternative
  • Right of Way Significant impacts along
    expressway corridor
  • Traffic Calming No special features along
    London Road or Superior Street
  • Traffic Circulation Limited number of
    north/south connectors
  • On-Street Parking No change
  • Pedestrian Impacts Limited connections across
    expressway
  • Amenities and Visual Impacts Significant visual
    impact

14
Alternative 2 (One-Way Pair)
  • Traffic Operations Shifts traffic to Superior
    Street at east end but decreases traffic on
    Superior Street at west end
  • Construction Costs less than Alternative 1 or 3
  • Right of Way Moderate impacts east of 40th
    Avenue
  • Traffic Calming Significant opportunities for
    traffic calming
  • Traffic Circulation Some increase in length for
    local trips
  • On-Street Parking Minimal impact
  • Pedestrian Impacts Safer and easier pedestrian
    crossings
  • Amenities and Visual Impacts Good potential for
    increasing amenities and improving visual impact

15
Alternative 3 (Parkway)
  • Traffic Operations Provides greatest amount of
    capacity
  • Construction Costs more than Alternative 2 or
    4, but less than Alternative 1
  • Right of Way Significant impacts along London
    Road
  • Traffic Calming Provides opportunities along
    London Road
  • Traffic Circulation Access control impacts side
    streets
  • On-Street Parking Eliminates parking along
    London Road
  • Pedestrian Impacts Medians help pedestrian
    crossing
  • Amenities and Visual Impacts Significant
    impacts to existing boulevard areas, but some
    opportunity for replacement.

16
Alternative 4 (Parking Lane Conversion)
  • Traffic Operations Provides least amount of
    capacity
  • Construction Least costly of the alternatives
  • Right of Way Minimal impacts to London Road
    east of 40th Avenue
  • Traffic Calming Some opportunities for traffic
    calming
  • Traffic Circulation No changes for east end but
    some impact to local trips along west end of
    London Road
  • On-Street Parking Reduces parking on London
    Road for certain time periods
  • Pedestrian Impacts Medians on west end help
    pedestrian crossing
  • Amenities and Visual Impacts Some opportunity
    for improvement along west end of London Road

17
Other Solutions and Variations
  • Roundabouts versus Signals
  • Frontage Road Connecting the Chateau and
    Lakeshore
  • Flyover for Westbound London Road at I-35

18
Evaluation Criteria
  • Mix and Match
  • Cost construction and right of way
  • Effectiveness
  • Impacts
  • Right of way
  • Public input
  • Bike/Pedestrian access

19
Next Steps
  • Compile input from this meeting
  • Continue to evaluate impacts and benefits
  • Work to develop a final solution
  • Public Meeting 3 late winter

20
Your Comments
  • Please sign up
  • Limit comments to three minutes
  • We will be available for additional discussion
    after the comment period