The CJK IT Standards Meeting - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

The CJK IT Standards Meeting

Description:

Construct test bed for the 1st Milestone Target ... Collaboration for standardization and interoperability in NGN open service platform/API ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 12
Provided by: industry2
Category:

less

Transcript and Presenter's Notes

Title: The CJK IT Standards Meeting


1
NGN-Working Group - Cooperative Work Plan -
  • The CJK IT Standards Meeting
  • July 57, 2004, Seoul, Korea

2
Table of Contents
  • Objective of the CJK NGN-WG
  • Key Issues for Study
  • Work Method

3
Objective of the CJK NGN-WG
  • Exchange information regarding NGN-related
    activities
  • of each country
  • Exchange the status of NGN standard development
  • Maximum commonality of NGN-related standards
  • End-to-end multimedia services over future NGN
  • Conformance testing among interested parties to
  • confirm interconnectivity and interoperability
    of NGN
  • Collect information on NGN standards development
  • and exchange it to cooperate regionally and
    globally

4
Key Issues for Study
1. Services related Issues
2010
2005
2007
Milestone
Target Vision
Service Vision
Video-Phone E-Commerce Etc.
Voice-NGN
Video distribution E-health, E-Culture Etc.
Requirements
Service Cap. Set 1 (SCS 1)
Service Cap. Set 2 (SCS 2)
Service Cap. Set 3 (SCS 3)
Scenario
Provision Scenario 1
Provision Scenario 2
Provision Scenario 3
5
Key Issues for Study
2. Architecture related Issues
NGN - Convergence Model
Video Services (TV, movie, etc)
Customer Manageable Capability
C/M-Protocol Traffic Man. OAM
Data Services (WWW, e-mail, etc)
Secure QoE (min. Session)
Telephone Services
Services
RENA? (Japan) MBA (Korea) ? (China)
API
Control Architecture
Transport
IMS (Mobility?)
ACCESS
ACCESS
CORE
Future Packets (?)
RENA (Japan) ? (Korea) ? (China)
Transport Architecture
Ethernet or others
xDSL
Optic
6
Key Issues for Study
3. Interworking and Identification Issues
7
Key Issues for Study
4. NGN Test-Bed Issues
  • Purpose of NGN test bed
  • Feasibility test prior to NGN implementation
  • Developing specifications for realizing NGN
  • Interoperability test for NGN components in CJK
  • How to provide NGN test bed in common?
  • Make a task force team selected from NGN experts
    in CJK
  • Define NGN services and equipments being tested
  • Provide the network connected to other countries
    by major carriers in CJK
  • Determine vendors and service providers in each
    country to participate in the interoperability
    test
  • Provide test specifications and scenarios

8
Key Issues for Study
Conceptual Model of NGN Test-Bed
China
Japan
Korea
Vendors
Vendors
Vendors
Operators
Operators
Operators
SPs
SPs
SPs
China Telecom
KT
NTT
International test bed for interoperability test
(Future)
FR/MPLS Forum
ITU-T
MSF
Parlay Group
SIP Forum
9
Key Issues for Study
Proposed Plan of NGN Test-Bed
  • 1st Step (20042005)
  • Construct test bed for the 1st Milestone Target
  • Test interoperability for VoIP services and
    related equipments
  • 2nd Step (20062008)
  • Test multimedia services on wire-line/wireless
    networks
  • Test open services based on API identified in
    CJK
  • Final Step (20092010)
  • Test multicasting/broadcasting services on the
    convergence network
  • Test and verify QoS, security, network management
    and other issues

Collaboration for standardization and
interoperability in NGN open service platform/API
10
Work Methods
1. Proposed Structure
Chair
Test-Bed Special Group
Vice-Chair
TG 1 (Service Group)
TG 2 (Archit. Group)
TG 3 (I/W ID Group)
2. Proposed Management
  • Chairman Mr. Yoichi Maeda (Japan, NTT)
  • Vice-Chairman ? (China)
  • Global Coordinator Mr. Chae-Sub, LEE (Korea,
    KT)

11
Work Methods
3. Proposed Procedure
  • Documentation Contribution base, but paperless
    meeting
  • Meeting
  • - WG meeting within regular CJK meeting
    leaded by Chairman
  • - TG meeting through E-mail and F2F meeting
    on request
  • leaded by Technical Leaders
  • Deliverables Technical Requirements, Technical
    Report and
  • Contributions (to Global Standard
    Organizations)
  • Resolution Consensus base
  • Report
  • - WG reports its result to CJK meeting with
    written report
  • - TGs report their results to WG meeting
    through E-mail
  • - Test-bed Special Group also report their
    results to WG meeting
Write a Comment
User Comments (0)
About PowerShow.com