open the SPS DB using Microsoft ACCESS, open the NOTICE table, find the network ... Start SpaceCap software, click the Open database option from the File menu and ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 28
Provided by: alexandrev3
Category:

less

Transcript and Presenter's Notes

Title: AP3030A PlansLists Workshop Using the SPS and other BR software applications to obtain the technical


1
AP30/30A Plans/Lists WorkshopUsing the SPS and
other BR software applications to obtain the
technical examination results
2
Procedures for the assessment of the impact of a
newly proposed satellite network
  • Let us examine two basic procedures
  • One that uses the results of analysis published
    on the BR IFIC (simplest)
  • Conducting a technical analysis by performing
    calculations and analysing the results(requires
    some working knowledge of SPS and software for
    analysis in shared bands).

In both cases it is necessary to install the SPS
software application. For the second approach, it
is necessary to install Microsoft ACCESS (v.2000
or later). If results in shared bands are
required - GIBC and SpaceCap should be also
installed. There are other approaches that use
other algorithms and methods for compatability
analysis. These procedures exceed the scope of
this workshop.
3
Procedure for the analysis of the results
published on the BR IFIC (1)
  • The main steps are
  • Copying the compressed database, which contains
    the results of calculations, from the BR IFIC to
    the users computer
  • Un-ziping the databases (desirable to un-zip only
    the necessary databases)
  • Running the SPS Reporting Tool (SPS_REPORTs.exe)
    and opening the results database for the network
    to be studied
  • Select the version of the analysis (database can
    store several versions of calculations)

4
Procedure for the analysis of results published
on the BR IFIC (2)
  • Choose the type of report
  • Specify the search parameters to be used for
    retrieval of data for the networks/assignments of
    interest
  • Retrieving, analysing and printout of the
    results
  • If results in shared bands are also required
  • Open the SPS database using Microsoft ACCESS.
    Open the tr_aff_ntw table
  • In the ntc_id field, use the filter for tool
    to find the networks/assignments possibly
    affected by the networks/assignments of interest.

5
Procedure for the analysis of results published
on the BR IFIC (3)
a.
b.
c.
6
Procedure for the analysis of results published
on the BR IFIC (4)
d.
e.
f.
g.
7
Reference Situation Report
8
Graphical Report
9
Networks possibly affected in shared bands
i.
h.
10
Practical exercise on analysing the results of
technical examination, published on the BR IFIC
  • Copy the compressed database, which contains the
    results of calculations, from the BR IFIC to your
    computer
  • Select and unzip one of the databases with the
    results of analysis
  • Run the SPS reports sub-system and obtain the
    results of analysis for the administration
    selected by you
  • Repeat the foregoing step using other search
    criteria and combinations
  • Close report.

11
Detailed analysis approach using BR software and
databases
  • If the user does not have the output results
    database or wants more detailed information, it
    is possible to run a technical analysis. Two main
    phases are included
  • Technical analysis with other assignments/networks
    belonging to the same Plan/List (using SPS
    software and SPS database) considered in this
    workshop
  • Technical analysis to identify probably affected
    services/networks in shared bands (using GIBC,
    SpaceCap software and the merged SPS/SRS
    database) optional in this workshop. This
    presentation includes several slides describing
    the phase II basic methodology.

12
I. Detailed analysis approach using theSPS
software and database (SPS DB) (1)
  • To carry the technical analysis with other
    assignments / networks belonging to the same
    Plan/List, the user should
  • Copy the zipped SPS database (SPS DB) from the BR
    IFIC or the ITU website to the users computer
  • Un-zip this database, rename it and change the
    file status (it is Read only on CD) to disable
    the read-only attribute
  • Change the Type of Assignment value for the
    "interfering network from V to A in the
    NTF_OCCURS field of the NOTICE table

13
I. Detailed analysis approach using theSPS
software and database (SPS DB) (2)
  • Starting the compatability analysis sub-system,
    select the input database, names of the output
    data files (including the output database) and
    the level of details
  • Select the Plan/List to be analysed and the date
    of receipt of the last network to be taken into
    account in the analysis (for the purposes of
    excluding the analysis of networks submitted at
    later dates)
  • Run the analysis
  • Analyse the results with the use of the reports
    sub-system and also, if necessary, the detailed
    report .

14
I. Detailed analysis approach using theSPS
software and database (SPS DB) (3)
a.
b.
c.
15
I. Detailed analysis approach using theSPS
software and database (SPS DB) (4)
d.
16
I. Detailed analysis approach using theSPS
software and database (SPS DB) (5)
e.
f.
17
I. Detailed analysis approach using theSPS
software and database (6)
g.
18
Practical exercise using the detailed analysis
procedure Phase I (1)
  • Copy the compressed SPS database from the BR IFIC
    to your computer
  • Un-zip the SPS DB, rename it, and disable the
    read-only attribute
  • open the SPS DB using Microsoft ACCESS, open the
    NOTICE table, find the network of interest and
    change the value of the field NTF_OCCURS of this
    network from V to A
  • perform a calculation taking into account the
    date of receipt of the network
  • examine the results of calculation, using the
    reports sub-system

19
Practical exercise using the detailed analysis
procedure Phase I (2)
  • Close the report
  • select the most interesting channel and conduct
    calculation with the maximum level of details for
    it
  • open the text file with results of detailed
    calculation, using NOTEPAD
  • analyse the results in the detailed report.

20
II. Analysis in shared bands using GIBC, SpaceCap
and merged SPS/SRS database (1)
  • To identify potentially affected
    services/networks in shared bands, the user
    should
  • Copy the latest SRS database from the SRS-on-CD
    (or your own SRS DB) to the users computer and
    rename it
  • Start SpaceCap software, click the Open database
    option from the File menu and browse for the SPS
    data file obtained from steps a) and b) of the
    phase I
  • Select PLAN from the tool bar
  • Select one Plan from the list by double-clicking
    on it.
  • Select all networks in the Plan.
  • Click on the Export option from the menu on the
    right.

21
II. Analysis in shared bands using GIBC, SpaceCap
and merged SPS/SRS database (2)
  • Click on the Set Target Db button and select the
    SRS database copied to your local disk (and
    renamed) in step a)
  • Make sure that the Keep Group Ids of the sources
    option is checked. Then press the OK button. In
    order to have a full version of the merged
    database you have to repeat steps from d) to this
    one for every Plan/List
  • Start GIBC software, click on the Tools and
    options tab and select the extended SRS database
    produced in steps from c) to h)

22
II. Analysis in shared bands using GIBC, SpaceCap
and merged SPS/SRS database (3)
  • Select tab with the required analysis according
    to RR (PFD for protection of terrestrial
    services, PXT for protection of space services
    (down-link), ?T/T for protection of space
    services (feeder-link)), type Notice Id of your
    interest and start analysis.
  • Analyse results stored in the folder used for a
    selected type of analysis (either in
    C\PFDRESULTS \, C\PXTRESULTS\ or
    C\APP8RESULTS \) specified at the bottom of the
    GIBC graphical interface
  • Steps j) and k) may need to be repeated as many
    times as the number of required analysis types
    (according to RR).

23
II. Analysis in shared bands using GIBC, SpaceCap
and merged SPS/SRS database (4)
b.
c.
24
II. Analysis in shared bands using GIBC, SpaceCap
and merged SPS/SRS database (5)
d.
e.
f.
25
II. Analysis in shared bands using GIBC, SpaceCap
and merged SPS/SRS database (6)
g.
h.
26
II. Analysis in shared bands using GIBC, SpaceCap
and merged SPS/SRS database (7)
j. (PFD examination)
k. A folder with the results of analysis
i.
27
References
  • Appendices 30, 30A 30B and Articles 5, 9 11
    of the Radio Regulations
  • Final Acts of WRC-03
  • Rules of Procedure
  • Space Plans System (SPS) Users Manual -
    technical description of the software for the
    compatibility analysis of planned satellite
    networks
  • GIBC help file
Write a Comment
User Comments (0)
About PowerShow.com