Industrial Applications Team Process Competency Center Raleigh, NC - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Industrial Applications Team Process Competency Center Raleigh, NC

Description:

Work with our tools ... Symbol and Descriptor, Concept Variable Tool. 10/9/09. 9. Conversion Methodology ... Simulation Techniques (Delta V, Mimic, i-Batch) ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 14
Provided by: jason240
Category:

less

Transcript and Presenter's Notes

Title: Industrial Applications Team Process Competency Center Raleigh, NC


1
Industrial Applications Team Process
Competency CenterRaleigh, NC
  • Protecting Your Automation Investment
  • Validated PIP conversion program

2
Take advantage of regulated Industries
Work with our tools - Concept 2.6 21 CFR Part
11 auto logout, audit trail, enable write
protection etc.. - UAG audit trail,
documentation, S88 - Hardware CPUs - Factory
Cast HMI Utilize IAT Capabilities -
Consulting - Third Party tools MDT
Enchrytion software from Achemya Mimic -
Specification/ Design of new system architecture
with 21 CFR Part 11 features Ergotech
Factory Cast HMI - Methodology ATLAS quality
plan - Project management - IAT Validated
Conversion Program
3
Protecting Your Automation Investment
  • Investment and development of a GAMP IV based
    Quality System
  • ATLAS, set of 22 quality procedures governing
    each step of the automation conversion life cycle
  • ATLAS Managing Customer Expectations and Project
    Deliverables
  • Trained IAT and select independent SI engineers
    to use these Procedures
  • Focused Program targeted at legacy Software
    Conversion
  • DMC Logic Master to Concept, Modsoft to Concept
  • Conversion Methodology
  • Automatic Conversion
  • Manual Conversion
  • Dead Code Removal
  • New Code insertion
  • Internal Schneider Quality Documentation
  • Functional Specifications, Test Specifications,
    Training Material

4
IAT ATLAS - Quality System Program
  • The development of Written Procedures that
    control each critical phase of the project
  • review draft quality program with pharmaceutical
    manufacturers
  • review draft procedures with system integrators
  • Release of the Quality System
  • Quality Procedures examples include

5
ATLAS Implementation Using GAMP Guidelines
  • Keys steps involved for suppliers of computer
    systems to ensure that their products can be
    successfully validated

6
Protecting Your Automation Investment
  • Program developed and piloted in 2003 with
    several Pharmaceutical Customers
  • Focused Program targeted at legacy
    Hardware/Software Conversion
  • DMC Logic Master to Concept, Modsoft to Concept
  • 984/584 - Quantum

7
Conversion Methodology
  • Conversion Methodology
  • Automatic Conversion
  • Manual Conversion
  • Dead Code Removal
  • New Code insertion
  • Underpinned with Change Control

8
Conversion Methodology
  • Automatic Conversion
  • Using Modsoft Converter Utility
  • IAT Modsoft Symbol and Descriptor, Concept
    Variable Tool

9
Conversion Methodology
  • Manual Conversion
  • Traffic Cop and Memory Map configuration
  • Loadable instantiation

10
Conversion Techniques
  • Minimize Network Logic Modifications
  • Minimize Variable Reordering
  • Create Compatible LOADABLES
  • Use Existing Networks
  • Hard-Code Data Initialization

11
Minimize Network Logic Modifications
12
Leveraging Internal Quality Documents
  • Internal Schneider Quality Documentation
  • Functional Specifications, Test Specifications
  • Training Material
  • 984 Ladder Logic Instructions, Concept etc.

13
Example of Standardizing Models for Batch
  • S88 Tag Naming conventions
  • S88 Physical Model Partitioning
  • Simulation Techniques (Delta V, Mimic, i-Batch)
  • Batch interface components (Phase Control
    Interface)
  • Software migration interface (SCoDs, EFBs,
    etc.)

Library of Standards -Tag Names -Control Modules
Build New/Adapted (standard)Solution For Projects
Plant Model
Functional Spec
Test Auto Generate App Docs
PID Mechanical
UAG/Assign Plant to System
System Model
Project Definition
Write a Comment
User Comments (0)
About PowerShow.com