Emergency Services Interconnection Forum ESIF Subcommittee G - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Emergency Services Interconnection Forum ESIF Subcommittee G

Description:

Call to Order and participant sign-up. Agenda Review and Approval. Opening Remarks ... FCC's OET Bulletin No. 71 regarding 'Post-installation monitoring and testing. ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 14
Provided by: gustav7
Category:

less

Transcript and Presenter's Notes

Title: Emergency Services Interconnection Forum ESIF Subcommittee G


1
Emergency Services Interconnection Forum (ESIF)
Subcommittee G
  • July 20, 2005
  • AGENDA

2
Subcommittee G
  • Objectives for this Meeting
  • Address any New Issues from Opening Session
  • Continue development of Issue 30 resolution
    document
  • Continue work on Issue 33

3
Agenda
  • Call to Order and participant sign-up
  • Agenda Review and Approval
  • Opening Remarks
  • a. Summary of Virtual meetings and conference
    calls
  • New Business
  • a. New Issue discussion and disposition (1 hr)
  • Old Business Issue 30 Discussion (1.5 hr)
  • Review and Approve Baseline document
  • Address Contributions
  • Old Business Issue 33 Discussion (1.5 hr)
  • Review and Approve Baseline document
  • Address Contributions
  • Workplan Review
  • Review Decisions and Action Items
  • Next Meeting

4
Issue 30 Call Delivery
5
Issue Statement / Business Need
  • Data Delivery Testing There is a need to
    establish a standard testing procedure, including
    rebid intervals, that will measure the consistent
    and timely delivery of the data of wireless 911
    calls to the PSAP. This standard procedure
    should include all elements of the emergency
    services network and the PSAP CPE/ALI network.
    There is thus a need to establish a testing
    procedure that will measure the timely, accurate
    delivery of wireless 9-1-1 calls and the
    associated location data to the PSAP. The intent
    of this interconnection issue is not to test
    wireless carrier accuracy, but rather to
    establish procedures/standards to test that the
    delivery of that data remains constant through
    the network and is delivered with integrity to
    the PSAP.

6
Desired Results
  • Development of a standardized wireless Enhanced
    911 call and data delivery test mechanism.

7
Impact on Other Issues or Procedures
  • This effort will be dependent, in part, on the
    work product of ESIF Issue 22 and the related
    efforts of Study Group G.

8
Issue 33 Maintenance Testing
9
Issue Statement/Business Need
  • There is a need to establish a standard set of
    requirements for Maintenance Testing as defined
    by the ESIF Subcommittee G during ESIFs 5 and 6.
    These testing requirements are essential to
    addressing the need for on-going compliance with
    the FCCs E9-1-1 Phase 2 performance mandate and
    the pertinent guidelines identified in the FCCs
    OET Bulletin No. 71 regarding Post-installation
    monitoring and testing.

10
Suggested Solution
  • Development of the associated requirements
    document for maintenance testing after an E9-1-1,
    Phase 2 system has been deployed. This effort
    will be leverage the work product of ESIF Issues
    22 and 30.

11
Subcommittee G Test Methodology
  • Gustavo Pavon
  • Chair

12
Subcommittee Group G Test Methodology
  • Decision
  • Issue 33 will include Accuracy maintenance and
    Functionality Maintenance
  • Issue 30
  • Doug Stuard of Andrew Corp. presented current
    baseline text under development. The group
    reviewed approximately 50 of the document.
    Review will continue at a future Web Meeting.
  • Contribution 21 from Nextel and Intrado will be
    re-distributed with changes suggested during the
    meeting. Consensus on the contents will be
    called at the next meeting. If approved, will be
    included in the next revision of the baseline
    document.

13
Subcommittee Group G Test Methodology
  • Issue 33
  • Contribution from T-Mobile
  • Agree on text leading to use of Incremental
    testing and Predictive Modeling
  • Agree on Useable Life of Accuracy Test Data (as
    modified)
  • Contribution 20
  • Verizon will revise and resubmit per discussion
  • Contribution 18 from Technocom
  • Agree on possible smaller sample size
  • Agree on adaptive sample size
  • Contribution 19 from Technocom
  • Will be discussed at the next opportunity
Write a Comment