Organization ATF collaboration and responsibilities - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Organization ATF collaboration and responsibilities

Description:

Robert Meller rem_at_lepp.cornell.edu Cornell University ... M.Ross of SLAC, A.Seryi of SLAC, R.Meller of US University, A.Wolski of LBNL, ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 18
Provided by: junj151
Category:

less

Transcript and Presenter's Notes

Title: Organization ATF collaboration and responsibilities


1
Organization (ATF collaboration) and
responsibilities
2
The SP serves the following tasks Direct and
coordinate the work required at ATF (including
ATF2) in accordance with the ATF Annual Activity
Plan, which outlines the activity plans of
ATF/ATF2 including the budget and beam time
allocation for each Japanese fiscal
year. Report the progress made by the
collaboration to the ICB and the director of
KEK. ( See ATF Web. Site.) Report the matters
related to KEK budget and KEK properties to the
director of KEK. Deputies Deputy1Hardware
maintenance, Deputy2Beam operation,
and Deputy3Design, construction and
commissioning of ATF2.
3
Distribution List Name ICB-Members
(18) Members Bob Kephart
kephart_at_fnal.gov FNAL Brian Foster
b.foster1_at_physics.ox.ac.uk Oxford David
Miller djm_at_hep.ucl.ac.uk
UCL Fumihiko Takasaki fumihiko.takasaki_at_kek.jp
KEK Gerry Dugan gfd1_at_cornell.edu
Cornell University J.P. Delahaye
Jean-Pierre.Delahaye_at_cern.ch CERN Jai Gao
gaoj_at_ihep.ac.cn
IHEP John Corlett jncorlett_at_lbl.gov
LBNL Kaoru Yokoya
kaoru.yokoya_at_kek.jp KEK Nick Walker
nicholas-john.walker_at_desy.de DESY Nobaru
Sasao sasao_at_scphys.kyoto-u.ac.jp
Kyoto University Paterson, Ewan
jmp_at_slac.stanford.edu (chair) SLAC Philip
Burrows p.burrows_at_qmul.ac.uk
QMUL Robert Meller
rem_at_lepp.cornell.edu Cornell
University Sachio Komamiya
sachio_at_icepp.s.u-tokyo.ac.jp University of
Tokyo Tsutomu Nakanisi
nakanisi_at_spin.phys.nagoya-u.ac.jp Nagoya
University Washio Masakazu
washiom_at_waseda.jp Waseda University Jinhyuk
Choi jchoi_at_postech.ac.kr
PAL
4
International Collaboration Board (ICB)
  • The International Collaboration Board (ICB) is
    the decision making body for the executive
    matters related to the ATF collaboration.
  • The appointment of the ICB members is based on
    recommendations from relevant research institutes
    in each area and approval by the director of KEK.
    The ICB may revise or expand its member
    composition, as deemed appropriate, when more
    universities or research institutes join the
    collaboration in the future.

5
  • The ICB serves the following tasks
  • Nominate the Spokesperson (SP) of the ATF
    collaboration.
  • Approve the appointment of the Deputies and
    System/Group Coordinators of important subsystems
    or subprograms.
  • Review and approve the ATF Annual Activity Plan.
  • Receive the reports from the SP, as found
    appropriate, and oversee the progress made by the
    collaboration.
  • Approve the new membership and withdrawals of
    collaborating institutes.
  • Help communicate the progress being made at ATF
    with members of the home institutes.

6
ATF Technical Board Total 13 members

August 1, 2005 Europe... N.
Walker, DESY-? E. Elsen G. Blair, RHUL (Royal
Holloway, University of London) P. Burrows, QMUL
(Queen Mary, University of London) F. Zimmermann,
CERN North America.. T. Raubenheimer,
SLAC M. Ross, SLAC S.Mishra, FNAL A. Wolski,
LBNL Asia K. Yokoya, KEK N. Toge,
KEK T. Sanuki, University of Tokyo J. Gao,
IHEP E-S. Kim, PAL
7
  • The TB consists of approximately 45 members from
    each of the Asian, North American and European
    regions. The members of the ATF Technical Board
    (TB) are nominated and appointed by ICB. The TB
    serves the following tasks
  • At the request of ICB, assist the Spokesperson in
    formulating the ATF Annual Activity Plan, which
    outlines the activity plans of ATF/ATF2 including
    the budget and beam time allocation for each
    Japanese fiscal year.
  • Assist the ICB in assessing the scientific
    progress that is being made by the ATF
    collaboration.

8
ATF SGC (System and Group Coordinators) Total
18 members
Three Deputies (with help of sub-Deputies of
KEK) Total 6 Members Deputy for Beam operation
S.Kuroda (T.Okugi) Deputy for
Hardware maintenance N.Terunuma
(M.Kuriki) Deputy for ATF2
A.Seryi (T.Tauchi) SGCs Total 18
members H.Weise of DESY, F.Zimmermann of
CERN, Philip Burrows of UK, Grahame Blair of
UK, M.Ross of SLAC, A.Seryi of SLAC, R.Meller of
US University, A.Wolski of LBNL, J.Gao of IHEP in
Beijing, E.S.Kim of PAL, K.Kubo, S.Kuroda,
N.Terunuma, M.Kuriki, T.Tauchi, T.Okugi,
R.Sugahara of KEK, T.Sanuki of Tokyo University
9
System/Group Coordinators (SGCs)
  • The System/Group Coordinators will be appointed
    by the Spokesperson with an approval of ICB.
  • The appointment of the System/Group Coordinators
    shall be made in a manner consistent with the ATF
    Annual Activity Plan.
  • The System/Group Coordinators will coordinate the
    tasks charged to the assigned Systems or Groups,
    and will assist the Spokespersons and the
    Deputies coordinate the ATF/ATF2 research
    programs.
  • In case of small study groups with less than 5
    members, the Spokesperson or the Deputies may
    assume the role of its Coordinator on an acting
    basis.

10
  • We had 1st ICB meeting at Snowmass2005.
  • 2nd ICB meeting will be in Vancouver.
  • 1. Coordination for each Institute If personal
    proposal from researcher will be given to SP, SP
    should ask related member of SGC and he has to
    ask the intention of his institute. If each
    institute approves his proposal, the institute
    must support him.
  • 2. ATF2 schedule in the Future

11
Usually schedule of ATF machine operation is
divided to two blocks of operating time per year
with about four months summer long shutdown. One
block is from mid. of Oct. to Dec., and the other
is from mid. of Jan. to mid. of June. Since there
are many collaborators, we propose two meetings
of TB per year in Dec. and May for review and
recommendation of the research programs at ATF.
We allocate following points usually. TB and
SGC Joint Meeting in Dec. is mainly devoted for
the evaluation on present RDs. TB and SGC
Joint Meeting in May is mainly devoted for the
evaluation on new proposals. Of course, we will
discuss both issues on RDs and new proposal in
TB and SGC Joint Meeting.
12
  • Requests to new proposal Purpose, Research
    method, Period of the research, Manpower, Budget
    plan etc. should be reviewed for the approval.
  • See Template for the new proposal of ATF Web.
    Site.
  • Member of ATF operation group Shift leader is
    responsible for the safety and should be KEK
    staff. Since ATF operation group is responsible
    for beam tuning, making a good beam and required
    beam by RD group, ATF operation group can
    involve many foreign physicists and engineers.

13
Responsibilities of Group Leaders
  • There are many groups for ATF operation, Research
    programs, ATF2 design, ATF2 construction and ATF2
    beam commissioning.
  • Group leaders are responsible for the completion
    of the aim of each group or the achievement of
    the goals of each research program.
  • Never give-up

14
Assignment of the ATF Beam Time
Typical 22 weeks/year
About 20 of total will be used for the
maintenance and the beam tuning. It is estimated
by current results.
Maintenance
Beam Tuning
  • Guideline for approved studied by SP.
  • Short term study
  • No conflict with approved studies
  • by TB and ICB.
  • Test study for new proposal
  • SP can accept until two shifts/week
  • but it depends on the situation of
  • studies.

SP Approved Studies
TB Approved Studies 2/3
15
Schedule of ATF operation, TB meeting and Long
shutdown
16
Ideal schedule for floor refurbishment of ATF2
  • 2006 summer shutdown (from mid. of June
  • to mid. of Oct.) Facilities for Crab Cavity and
    X-band TF should move away another place.
  • 2007 summer shutdown (from June to Oct.) Floor
    Refurbishment
  • From Nov. to Jan. 2008 Installation, Alignment,
    Cabling, etc.
  • From Feb. 2008, Beam Commissioning will be
    started.

17
Delayed schedule due to unexpected reason
  • 2006 summer shutdown (from mid. of June
  • to mid. of Oct.) Facilities for Crab Cavity and
    X-band TF should move away another place.
  • 2007 summer shutdown (from June to Oct.) Floor
    Refurbishment
  • 2008 summer shutdown (from June to mid. of Oct.)
    Installation, Alignment, Cabling, etc.
  • From Oct. 2008, Beam Commissioning will be
    started.
  • ATF normal beam operation can continue.