Title: Philae Status


1
Philae Status
SWT
  • Stephan Ulamec
  • SWT, September 4-6, 2006, Helsinki

2
Overview
  • Operations Activities
  • Status of Lander (Subsystems and P/L)
  • Planning

3
General Remarks
  • Since the last LOWG (January 06) Philae was
    switched on during 3 operational blocks
  • Passive Checkout PC2
    (07./08.03.06)
  • Battery charging sequence
    (08./09.05.06)
  • Passive Checkout PC3
    (28./29.08.06)
  • Operations Activities all very successful
  • Problems / Areas of concern (remaining)
  • Increased secondary battery discharge
  • Temperature gradients inside Lander higher than
    estimated
  • DPU1 booting problem at low temperatures
  • ADS pressure measurement indicates loss of gas

4
Philae In-flight Operations
  • Results
  • In general nominal behaviour of the Lander units,
    some features have to be
  • monitored during the upcoming activities in
    2006/2007
  • DPU1 cannot be switched ON at low
    temperaturesReset command or heating has to be
    applied if YEBox temp is below -26degC
  • Secondary Battery self discharge higher than
    expectedRecharge performed in May and to be
    performed during PC4
  • ADS pressure sensor indicates low tank
    pressureInvestigation ongoing (PC4)
  • Lander overall temperature decreaseThe Lander
    temperature level decreased by about -5deg after
    the Earth Swing-by. For PC1 the temperature at
    Power ON of some unit electronics were already
    below -40degC, which was defined as the
    operational limit.

5
NCRs (I)
  • ESS Event Strategy
  • RMOC is flooded by high amount of created ESS
    events
  • Status Separate ESS event packet store provided
    by RMOC, dump with priority of science data
  • Temporary solution for Cruise Phase accepted at
    RMOC and LCC
  • ESS PID106 packet generation processing
  • Packets, stamped with PID106 by ESS (Bad
    telemetry) are discarded on-board the Orbiter.
  • Status Under investigation at LCC
  • Support by ESS SW provider (CAPTEC) is probably
    needed

6
NCRs (II)
  • CDMS DPU-overswitch
  • Increase RF link robustness by introducing
    TM-Backup Mode
  • Status implemented in the upcoming CDMS SW
    Version
  • PID106 packets may occur since ESS-CDMS protocol
    is not applied(Rx OFF) during data transfer -gt
    to be checked against Anomaly with PID106 packets
  • CDMS-patch upload during PC4
  • CDMS Mass Memory Handling
  • Unpredictable dump behavior due to Mass Memory
    H/W problems. Solution by S/W means
  • Status of development- Mass Memories can be
    used as RAM- Mass Memory behavior after power
    cycle still needs improvements
  • -gt Impact on operation preparation for comet
    phase

7
NCRs (III)
  • Unit - CDMS interface
  • Missing, corrupted or duplicated data or science
    blocks
  • Status- CDMS improvements in the upcoming CDMS
    SW Version
  • ROMAP
  • High voltage problem (SPM and Penning)
  • Status stand-by
  • Checkout during PC4 (HV levels 4 and 5)
  • COSAC
  • Oven did not heat as expected
  • Status troubleshooting planned for Active
    Checkout 2006
  • Test during PC4
  • ADS
  • Low tank pressure
  • Status investigation ongoing with unit provider
  • Checkout during PC4

8
Subsystems - Performance Overview
  • Subsystem Performance Major Open Work for
    cruise for on-comet ops
  • Electrical Support System ? no tbd
  • CDMS ? no yes
  • Power Subsystem ? no yes
  • Thermal Control System ? no no
  • Rx/Tx ? no no
  • Active Descent System ? no yes
  • Flywheel ? no no
  • MSS and NEAs ? no yes
  • Landing Gear ? no yes
  • Anchor ? no no

9
Milestones during Cruise
  • 2006 unit S/W-upload, battery maintenance/chargin
    g
  • 2007 Lander Simulator phase 2 readiness (LSS,
    LEM)
  • 2008/2009 Upgrade of data systems (LCC, H/W and
    S/W)
  • 2011/13 Upload/update of SDL and on-comet
    operations
  • 2012/13 Lander Team build-up and training

10
Activities for 2006/2007
  • Payload Checkout 2 (passive) 07/08-03-2006
  • Battery Charging 08/09-05-2006
  • Payload Checkout 3 (passive) 28-08-2006
  • Payload Checkout 4 (active) 28-11-2006
    (2x4days)
  • Thermal Characterization 30-01-2007
  • Mars Swingby 25-02-2007
  • Payload Checkout 5 (passive) 18-05-2007 (5
    days)
  • Payload Checkout 6 (active) 07-07-2007 (25
    days)
  • Earth Swingby 2 13-11-2007

See SCrOP
11
(No Transcript)
12
Activities for 2007
  • Mars Swing-by 11-02-2007 (28days)
  • Mars closest approach 25-02-2007
  • Payload Checkout 5 (passive) 18-05-2007 (5days)
  • Start preparation (54 days) 05-03-2007
  • Payload Checkout 6 (active) 17-09-2007 (14days)
  • Start preparation (28 days) 26-03-2007
  • Earth Swing-by 2 30-10-2007 (28days)
  • Start preparation (125 days) 08-05-2007
  • Payload Checkout 7 (passive) 04-01-2008 (5days)
  • Start preparation (54 days) 22-10-2007
  • Steins Flyby 22-08-2008 (28days)
  • Start preparation (264 days) 20-08-2007

13
Activities 2006 / 2007
14
Knowledge Management
  • Knowledge will be kept by
  • Keeping personalised experience
  • Transferring know-how smoothly
  • Maintaining the documentation
  • Applying KM tools (Corolles, Hypertest)
  • Performing tests and simulations (GRM, Software
    Simulator)
  • Operating the FM regularly (2 3 times per year)