The Stonewood Data Center
  • Tim Asselyn

2
Why Build a New Data Center?
  • Current Data Centers
  • Primary Data Center
  • Converted shoe factory
  • Wooden roof (which leaks)
  • 5,200 square feet
  • One UPS (500 kVA)
  • 9 inch raised floor
  • Secondary site
  • In center of distribution facility
  • 750 square feet
  • One UPS (150 kVA)
  • 10 inch raised floor

3
Why Build a New Data Center?
  • The Challenge
  • Existing data centers insufficient fromsize and
    design perspective to support
  • Business growth
  • Business continuity
  • Architectural changes in systems
  • 2004 Stonewood data center project started
  • Attended AFCOM conferences
  • Renovate vs. new construction
  • Site location Freeport or far away?
  • During RFP process, lots of tours

4
Design Goals
  • General Criteria
  • Reliable
  • Secure
  • Maintainable
  • Flexible/scalable
  • Environmentally friendly

5
  • Reliable
  • 2N Dual path redundant electrical
  • N1Critical cooling
  • Penetration free roof
  • Multi layered fire protection system

Design Goals
6
  • Secure
  • Natural features act as vehicular barriers
  • Tiered levels of building security
  • Level 1 Building access
  • Level 2 Infrastructure and storage
  • Level 3 Command center and computer room

Design Goals
7
  • Maintainable
  • All equipment concurrently maintainable
  • Maintenance by-passes
  • CRAC units serviceable without entering computer
    room

Design Goals
8
  • Flexible/Scalable
  • UPS capacity designed to grow 100
  • Cooling capacity designed to grow 150

Design Goals
9
  • Environmentally Friendly
  • Further LLBean corporate culture
  • Preserve open space
  • Minimize use of PVC
  • Obtain LEED certification

Design Goals
10
LEED-NC Rating System
LEED
11
LEED Certification Awards
  • Four levels of certification
  • LEED Certified 26 - 32 points
  • Silver Level 33 - 38 points
  • Gold Level 39 - 51 points
  • Platinum Level 52 points
  • 69 total points available

LEED
12
(No Transcript)
13
LEED Certification
  • Our goal Silver Certification
  • 69 possible points, 39 points applied for
  • 34 points earned to date
  • 4 points denied and or open for appeal
  • 1 point dropped, not being pursued

14
(No Transcript)
15
  • Open Space
  • LEED
  • ID Credit 11.4 Innovation in Design
  • Points for greatly exceeding standards
  • Solution
  • Expanded open space to emphasize the clients
    corporate culture promoting outdoor use.

16
  • Roof Design
  • LEED
  • SS Credit 7.2 Heat Island Effect Roof
  • Reduce the amount of heat absorbing materials on
    roof
  • Solution
  • White membrane roof
  • Penetration free roof
  • Single slope oriented to the south so sun rays
    help with snow melt

17
  • Regional Materials
  • LEED
  • MR Credit 5.1 Regional Materials
  • Use materials that are manufactured locally
    (within 500 mile radius)
  • 10 local requirement for point
  • Solution
  • Clients corporate culture promotes local business
  • Wood shingles
  • Access flooring
  • Metal siding

18
  • Views

19
  • Views
  • EQ Credit 8.1 Daylight for employees
  • Natural light in 75 of occupied spaces
  • EQ Credit 8.2 Exterior views for employees
  • Exterior views from 90 of occupied spaces
  • Solution
  • Command center is the only occupied room
  • Provide windows for light and views from command
    center

20
Overview - Building Systems
21
Overview - Building Systems
22
First Floor
23
Second Floor
24
Building Systems
  • Summary
  • Building total 18,000 SF
  • Computer room total 5,000 SF
  • Initial Capacity
  • UPS 270 kW (2N)
  • Cooling Load 98 ton (N1)
  • Ultimate Capacity
  • UPS 540 kW (2N)
  • Cooling Load 245 ton (N2)
  • 39 LEED points targeted in design (Silver
    certification level goal)
  • June 2008 occupancy

25
  • LEED design starts with RFP process for both the
    designer and the contractor
  • It doesnt cost a lot to be green today
  • Even a stand-alone data center can be designed to
    be environmentally friendly and LEED certified
  • Be sure to document everything throughout design
    and construction

Lessons Learned
26
Questions?