Compensatory Mitigation Rule: Corps/EPA Notice of Proposed Rulemaking - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Compensatory Mitigation Rule: Corps/EPA Notice of Proposed Rulemaking

Description:

U.S. Army Corps of Engineers. Office of Wetlands, Oceans and Watersheds ... 1/05 12/05 Corps/EPA coordination. 12/5/05-3/10/06 OMB review ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 15
Provided by: mdeSt
Category:

less

Transcript and Presenter's Notes

Title: Compensatory Mitigation Rule: Corps/EPA Notice of Proposed Rulemaking


1
Compensatory Mitigation RuleCorps/EPA Notice of
Proposed Rulemaking
  • Regulatory Branch
  • U.S. Army Corps of Engineers
  • Office of Wetlands, Oceans and Watersheds
  • U.S. Environmental Protection Agency
  • October 2006

2
Overview
  • Status of compensation
  • Rule drivers and timeline
  • Rule outline
  • Key changes in practice
  • Next steps

3
Type of Compensation
  • Permittee-responsible mitigation (PRM)
  • Third-party
  • mitigation
  • Mitigation Banks
  • In-lieu fee (ILF)

(USACOE, 2006)
4
Rule Drivers and Timeline
  • 2001 NRC report on compensation
  • 2002 Initiation of Mitigation Action Plan
  • Defense Authorization Act for 2004
  • Timeline
  • 1/05 12/05 Corps/EPA coordination
  • 12/5/05-3/10/06 OMB review
  • 3/28/06 Federal Register publication
  • 6/30/06 Comment period closed

5
Supporting Materials
  • Primary sources used in drafting
  • 2002 Mitigation RGL
  • 2000 ILF Guidance
  • 1995 Banking Guidance
  • 1990 Army/EPA Mitigation MOA
  • 2001 NRC Report, others
  • 2003/2004 MAP work-productions and stakeholder
    input

6
Rule Outline
  • Purpose and general considerations
  • Definitions
  • General requirements
  • Planning and documentation
  • Ecological performance standards
  • Monitoring
  • Management
  • Mitigation banks
  • In-lieu fee mitigation

7
Changes 3rd Party Compensation
  • Grandfathers existing banks
  • Instrument modification will trigger compliance
    with new requirements
  • In-lieu Fee mitigation
  • Suspension of new authorizations
  • Existing ILFs 5-yr transition period
  • Preamble solicits comment on
  • Impacts of and alternatives to ILF phase-out

8
Changes Public Notice
  • Individual permits -
  • the public notice for the proposed activity
    must explain how impacts associated with the
    proposed activity are to be avoided, minimized,
    and compensated for. 332.4/230.94
  • Mitigation banks
  • All proposed banks to receive public notice and
    comment

9
Changes Contents of Mitigation Plans
  • Project objectives
  • Site selection factors
  • Site protection instrument
  • Baseline information (at impact site and
    compensation site)
  • Credit determination methodology
  • Work plan
  • Maintenance plan
  • Performance standards
  • Monitoring requirements
  • Long-term management plan
  • Adaptive management plan
  • Financial assurances

10
Additionally for Banks
  • Prospectus and draft and final instruments must
    include
  • Service area
  • Credit release schedule
  • Accounting procedures
  • Transfer of liability for site success
  • Default and closure provisions
  • Rule includes timelines for bank review and
    dispute resolution

11
(No Transcript)
12
(No Transcript)
13
Next Steps
  • Process/post public comments
  • 12,100 total comment letters
  • 900 unique comment letters
  • Analyze public comments
  • Draft comment response
  • Implementation
  • MBRT/IRT Academy

14
Questions
  • Compensatory Mitigation Website
  • http//www.epa.gov/wetlandsmitigation/
  • Federal Docket
  • http//www.regulations.gov