Title: Metro Manila Air Quality Improvement Sector


1
  • Metro Manila Air Quality Improvement Sector
  • Development Program
  • Outsourcing Sampling Project (OSP)
  • ADB Loan No. 1665-PHI
  • OSP Project Overview
  • Presented to
  • DENR / ADB / NGO
  • Development Partners
  • Presented byOutsource Sampling Project
    (TRC/TEEM)


2
OSP Project Scope of Work
  • Primary objectives
  • Perform 960 facility surveys and provide
    necessary instruction to modify sources for
    testing (test ports, platforms, ladders)
  • Perform minimum of 6,048 individual test runs
    (the equivalent of 960 sources) for PM, SO2, NOx,
    CO and metals
  • Generate representative emission test data in
    comparison with the Philippine Clean Air Act
    standards
  • Produce EPA-quality test reports suitable for EMB
    regulatory follow-up actions (NONC, Technical
    Conference, CAP)

3
(No Transcript)
4
(No Transcript)
5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
Project Status (through Aug 31)
Status
18
Project Status (through Aug 31)
Status
19
Stack Test Results
  • Of the 795 stacks reported, 388 are above the
    CAA standard for at least one parameter
  • 289 stacks are failing for SO2
  • 161 stacks are failing for PM
  • 83 stacks are failing for CO
  • 26 stacks are failing for NOx
  • 1 stack is failing for lead

20
General Observations
  • The following are some of the typical
  • Sources firing bunker C fuel oil are exceeding
    the SO2 and PM standards (boilers, gensets,
    heaters)
  • Gensets are exceeding the NOx standard
  • Solid fuel-fired units are exceeding the CO
    standard
  • Only 1 source was exceeding the lead standards
  • No sources have exceeded the mercury (or other
    metal) standards

21
Equipment Returned to DENR
  • At the conclusion of the project OSP provides
    over 230,000 equipment
  • 7 vehicles (3 Revos and 4 Kia Vans)
  • Stack testing equipment (meter boxes, sample
    probes, impingers, etc)
  • Laboratory equipment (analytical balance,
    spectrophotometer, support equipment)

22
OSP Supplemental Items
Supplemental Items
  • Although not required by our contract, the OSP
    has provided the following support (at the
    request of EMB)
  • Extensive regulatory and policy guidance and
    support (CEMS, accreditation, methodology
    questions, emission averaging, mass emission
    rates, correction factors, etc)
  • Established test port and platform standards with
    industry
  • Created culture of safety in stack testing
  • Training (test procedures, laboratory procedures,
    test report review, regulatory follow-up, PCO
    workshops)
  • Survey and testing of large sources outside the
    Airshed

23
Primary Goal
  • Improve air quality over the medium term
  • Of the 795 stacks that have been reported, 388
    (49) are failing (without DENR applying the
    appropriate dilution correction factors). This
    leads to a NONC and compliance plan.
  • For sources that pass, the report generally
    provides the necessary data to make that
    compliance sustainable
  • The vast source data should now be used to
    re-evaluate, and where necessary, tighten the
    emission standards