Until March the Proton Beam Current was limited due to Radiation Safety Issues. ... Phase Trombone (Adjustment of Betatron Phase Advance in both ZEUS and H1 to ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 15
Provided by: BIE61
Category:
Tags: hera | mpy | prc | bieler | mai | operation | trombone

less

Transcript and Presenter's Notes

Title: HERA Operation 2004 M' Bieler, MPY PRC, Mai 2004


1
HERA Operation 2004M. Bieler, -MPY- PRC, Mai
2004
  • Performance Improvements in 2004
  • Remaining Problems
  • Improvement Program
  • Schedule 2004

2
Performance Improvements in 2004
  • Beam Currents
  • Until March the Proton Beam Current was limited
    due to Radiation Safety Issues.
  • Best Values until now
  • 103 mA Protons _at_ 920 GeV,
  • 47 mA Positrons _at_ 27.5 GeV.

3
Performance Improvements in 2004
  • Peak Luminosity has increased to 3.5 1031

4
Performance Improvements in 2004
  • L sp 1.6 1030 90 design

5
Performance Improvements in 2004
Peak Lumi per Day 1 pb-1 Peak Lumi per Week
5pb-1

6
Integrated Lumi 2000 and 2004
Since January 2004 the Lumi Production Rate
is comparable with 2000, since April 2004 it
is considerably better.
7
Performance Improvements in 2004
  • Measures to improve HERA Performance
  • Streamlined Procedures (Positron Ramp directly
    into the Lumi File, ZEUS Calorimeter Closing _at_ 12
    GeV,) allow use of high Positron Currents.
  • Collision first at H1, then at ZEUS (to avoid
    Beam blow up).
  • Correction of Beam Tilts individually in ZEUS and
    H1.
  • Phase Trombone (Adjustment of Betatron Phase
    Advance in both ZEUS and H1 to compensate
    Beam-Beam Effects).

8
Performance Improvements in 2004
  • Background Rates at ZEUS and H1 have decreased to
    tolerable Values.

H1
9
Performance Improvements in 2004
  • Polarisation reaches 40 regularly with 3 Spin
    Rotators on and Collisions. During long, quiet
    runs Polarisation can be tuned up to 50.
  • A faster Polarimeter would be useful for faster
    Tuning.

10
Remaining Problems
  • Now that the Luminosity Goals are within Reach
    and the
  • Background Problems are solved, the main Problems
    are
  • - Reliability and Availability of all Components
  • (some Components are as old as PETRA)
  • Efficiency of Operation
  • (Experienced Operators have retired, new
    Operators have Tasks
  • on new Projects and no Connection to HERA)

11
Remaining Problems
  • Measures to improve Efficiency of Operation
  • Enhanced Operator training
  • Improved Communication (Shift Briefings)
  • More Software Support for Operations
  • Continue daily Operations Meeting with all Groups

12
Remaining Problems
  • Critical Systems in Terms of Support, Expertise
    or Manpower
  • Quench Protection
  • Proton RF Systems
  • Warm Magnets
  • PETRA
  • Timing and Low Level RF

13
Improvement ProgramRich Program with 70 Items,
the most important ones being
  • Proton RF Systems
  • Injection Systems
  • Collimation Systems
  • Diagnostics Systems
  • RF-Controls
  • Vacuum System
  • Power Supply Systems
  • e-RF Systems
  • Cryogenic Systems
  • Improved low-level Controls,
  • Suppression of long. Instability
  • Improved monitoring,
  • vertical Excitation Kicker
  • Increased Reliability
  • Improved Monitors (BPM, SR)
  • p-RF Freq. Control, etc
  • Better Pumping in RF Sections
  • Addl PS for Spin Matching
  • RF Modulator Upgrade
  • Compressor and Controls Upgr.

Sum 2.26 M
14
HERA Schedule 2004
  • Lumi Run until Aug. 16
  • Shutdown until Oct. 8
  • Yearly Safety Tests
  • Exchange of BU Coils
  • Exchange of 1 cold Quad
  • Prepare for Electrons
  • Switch to Electrons during Restart (HERA would
    prefer a long, stable Run with Positrons)
  • Lumi Run in November